2A LLC
ABERDEEN, MARYLAND 210012438
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $15.95M | 23 |
| 238220 | $9.33M | 9 |
| 336611 | $2.39M | 2 |
| 238160 | $1.80M | 2 |
| 237310 | $1.26M | 2 |
| 238210 | $696K | 3 |
| 484210 | $628K | 1 |
| 541611 | $429K | 3 |
| 561210 | $135K | 11 |
| 237990 | $1K | 2 |
Contract Awards
32 awards found
REPAIR UNDERGROUND STORAGE TANK FUEL SUMPS, MANHATTAN, KS (MEP TO)
2ND FLOOR CLOCKTOWER REMODEL
BASE - CLOCK TOWER 3RD FLOOR REMODEL
GUARANTEED MINIMUM: 2A LLC MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) MATOC - PLAINS AREA
CNRC CRITICAL HVAC UPGRADES
BASE: FACILITY SUPPORT SERVICES
IDIQ MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) TO PROVIDE DESIGN, REPAIR, AND CONSTRUCTION SUPPORT FOR REAL PROPERTY, FACILITIES, AND/OR THEIR SYSTEMS AND COMPONENTS FOR CIVIL WORKS CONSTRUCTION PRIMARILY IN THE MOBILE DISTRICT.
MISSISSIPPI RIVER BASIN ROCK ISLAND ARSENAL ROCK ISLAND, ILLINOIS CLOCK TOWER 3RD FLOOR REMODEL MODIFICATION FOR ELECTRICAL CHANGES, RELOCATE HYDRONIC PIPING, AND TELEHANDLER & OPERATOR
LOWER ROOF REPLACEMENT, THEODORE LEVIN U.S. COURTHOUSE, DETROIT, MI THE PURPOSE OF THIS PROJECT IS TO REPLACE THE LOWER ROOF AT THE THEODORE LEVIN U.S. COURTHOUSE IN DETROIT, MI
SOO PROJECT OFFICE DRYDOCK INSPECTION AND REPAIRS
SOO PROJECT OFFICE DRYDOCK INSPECTION AND REPAIRS
BASE - CLOCK TOWER 3RD FLOOR REMODEL
BASE - CLOCK TOWER 3RD FLOOR REMODEL
FIBER OPTIC CABLE - ELECTRONIC SECURITY SYSTEMS
CALUMET HARBOT- ACCESS ROAD CONSTRUCTION
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)
BASE - CLOCK TOWER 3RD FLOOR REMODEL
REPAIR B676 ROOF, DESMOND DOSS HEALTH CLINIC, SCHOFIELD BARRACKS ARMY BASE, HAWAII.
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) WOMEN OWNED SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)
BUILDING PA056
CLIN 0001-MAID-IQ MIN GUARANTEE
INSTALL FIBER AT CAMP EAGLE
INSTALL FIBER/COPPER CABLES MCA AIT BRKS
GUARANTEED MINIMUM: 2A LLC MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) MATOC - PLAINS AREA
DESIGN BUILD CONSTRUCTION IDIQ MATOC MINIMUM GUARANTEE TASK ORDER
QUALITY ASSURANCE OPTION EXERCISE
MINIMUM TASK ORDER GUARANTEE
PROVIDE ELECTRICAL CIRCUIT REPLACEMENT, INCLUDING INSTALLATION OF NEW ELECTRICAL CABLING TO CORRECT DEFICIENCIES AND INCREASE RELIABILITY OF POWER CIRCUITS TO ENVIRONMENTAL SATELLITE ANTENNAS AT WCDAS.
AWARD
QUALITY ASSURANCE SUPPORT SERVICES
PROVIDE ELECTRICAL CIRCUIT REPLACEMENT, INCLUDING INSTALLATION OF NEW ELECTRICAL CABLING TO CORRECT DEFICIENCIES AND INCREASE RELIABILITY OF POWER CIRCUITS TO ENVIRONMENTAL SATELLITE ANTENNAS AT WCDAS.
TSO MOVE OUT OF LEASED BUILDING, DISCONNECTION OF PLUMBING, ELECTRICAL AND PACKAGING UP OF OFFICE EQUIPMENT TO PALLETS AND LOADED INTO GOVT PROVIDED TRUCKS.
Business Details
- UEI
- GZ67CL86SJR6
- CAGE Code
- 9LBW5
- Address
- 115 N PARKE ST
ABERDEEN, MD 210012438 - Congressional District
- MD-01
- Phone
- 8446606160
Parent Company
2A LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov