A. WEST ENTERPRISE, LLC
ALBANY, GEORGIA 317074678
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237130 | $24.63M | 31 |
| 237120 | $53K | 1 |
| 513210 | $9K | 1 |
Contract Awards
26 awards found
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE SWITCHGEAR AT THE BOOSTER FABRICATION FACILITY.
REVITALIZE POWER SYSTEMS AT THE VEHICLE ASSEMBLY BUILDING (VAB) TOWER C
REVITALIZE POWER SYSTEMS AT THE VEHICLE ASSEMBLY BUILDING (VAB) TOWER C
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE SWITCHGEAR AT THE BOOSTER FABRICATION FACILITY.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
MODIFICATION TO INCORPORATE SETTLEMENT AGREEMENT AGREED UPON BY MUTUAL PARTIES ON 17 JULY 2025.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE SWITCHGEAR AT THE BOOSTER FABRICATION FACILITY.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE SWITCHGEAR AT THE BOOSTER FABRICATION FACILITY.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC. INCORPORATING THE TRANSFORMER STORAGE CONTAINERS. PERIOD OF PERFORMANCE END DATE REMAINS 10/1/2028.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC. INCORPORATING TECHNICAL NUMBER (TN) 3. PERIOD OF PERFORMANCE END DATE REMAINS 10/1/2028.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC.
REPLACE NEIL ARMSTRONG OPERATIONS & CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KSC. INCORPORATE TECHNICAL NUMBER (TN)-02 PERIOD OF PERFORMANCE REMAINS 10/1/2028.
8511013971!ADPE INC FIRM/SFTWARE,SUPPLS,
REPLACE SWITCHGEAR AT THE BOOSTER FABRICATION FACILITY. P00008: INCORPORATING TECHNICAL NUMBER (TN) 03 INTO THE CONTRACT. THE PERIOD OF PERFORMANCE REMAINS 4/09/2026.
REPLACE SWITCHGEAR AT THE BOOSTER FABRICATION FACILITY. P00006: INCORPORATING TECHNICAL NUMBER (TN) 02, AND ALSO A NEW POP END DATE OF 4/09/2026.
INCORPORATING A CHANGE AND ALSO ESTABLISHING THE NTP POP END DATE OF 10/1/2028 FOR THE REPLACE NEIL ARMSTRONG OPERATIONS AND CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KENNEDY SPACE CENTER, FL.
REPLACE NEIL ARMSTRONG OPERATIONS AND CHECKOUT (O&C) SOUTH WING ELECTRICAL DISTRIBUTION EQUIPMENT AT KENNEDY SPACE CENTER, FL.
REPLACE SWITCHGEAR AT BOOSTER FABRICATION FACILITY. INCORPORATING TRACKING NUMBER (TN)-01 DE-SCOPING SS-1116 FROM CONTRACT LINE ITEM NUMBER (CLIN) 0002 IN THE AMOUNT OF ($535,928).
REPLACE TRANSFORMER AT THE SATELLITE ASSEMBLY BUILDING (SAB). DE-OBLIGATE ALL FUNDS, ALL WORK WILL BE AT NO COST TO GOVERNMENT PER FINAL LITIGATION SETTLEMENT.
Business Details
- UEI
- U747Y6MFX2A5
- CAGE Code
- 5Q7B1
- Address
- 705 CANAL ST
ALBANY, GA 317074678 - Congressional District
- GA-02
- Phone
- 2298888347
Parent Company
A. WEST ENTERPRISE, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov