BAILEY EDWARD DESIGN, INC
DBA: BAILEY EDWARD ARCHITECTURE
CHICAGO, ILLINOIS 606012308
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541310 | $6.96M | 237 |
| 541330 | $5.53M | 81 |
| 541715 | $30K | 1 |
| 541620 | $0 | 1 |
Contract Awards
50 awards found
DEOBLIGATION OF UNUSED FUNDS FOR THE 8TH FLOOR DRUG ENFORCEMENT ADMINISTRATION CEILING AND LIGHTING REPLACEMENT CHICAGO IL AT 536 S. CLARK IN CHICAGO, IL
MODIFICATION TO DEOBLIGATE EXCESS FUNDS. SENATOR DUCKWORTH ISA CARBONDALE AT FEDERAL BUILDING, CARDONDALE, IL 60605.
LABORATORY INCUBATOR CENTER (LIC) CO2 SUPPLY SYSTEM DESIGN
PERFORM STUDY TO DETERMINE WHAT UPGRADES ARE NEEDED FOR RELIABLE AND SAFE STEAM VAULT OPERATIONS. RESULTS FROM THE STUDY WILL BE INCORPORATED INTO A DESIGN.
ROOF REPLACEMENT ADMINISTRATION BUILDING, USNA, WASHINGTON, DC.
GARAGE CONCRETE RESTORATION, EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN STREET, CHICAGO, ILLINOIS. THIS MODIFICATION INCORPORATES ADDITIONAL DESIGN SERVICES AND EXTENDS THE COMPLETION DATE TO 3/20/2026.
ARCHITECT/ENGINEERING SERVICES FOR THE PEORIA BRONZE DOOR ADDITIONAL AE PCCS SERVICES AT THE FEDERAL BUILDING AND U.S. COURTHOUSE, 100 N.E. MONROE STREET, PEORIA, ILLINOIS 61602-1003. THIS MODIFICATION ADDS ARCHITECT HOURS DUE TO CONSTRUCTION DELAYS.
PLANT GERMPLASM RESEARCH FACILITY PROJECT FOR MADISON, WI
CARBON DIOXIDE FISH DETERRENT
ELEVATOR MODERNIZATION STUDIES AND PROGRAM OF REQUIREMENTS PREPARATION FOR MILWAUKEE AND DAYTON U.S. COURTHOUSES, GENERAL SERVICES ADMINISTRATION, REGION 5.
MODIFICATION FOR ADDITIONAL DESIGN SERVICES FOR THE 3RD FLOOR US MARSHAL SERVICE DETENTION AREA AND COURTS JURY ASSEMBLY ROOM RENOVATION PROJECT TAKING PLACE IN SPRINGFIELD, ILLINOIS
MODIFICATION FOR ADDITIONAL 3RD PARTY MONITORING SERVICES FOR THE 3RD FLOOR U.S. MARSHALS SERVICE DETENTION AREA AND COURTS JURY ASSEMBLY ROOM RENOVATION RENOVATION PROJECT AT THE PAUL FINDLEY FEDERAL BUILDING IN SPRINGFIELD, ILLINOIS
MODIFICATION FOR ADDITIONAL ARCHITECT ENGINEER SERVICES FOR USDC SPRINGFIELD GRAND JURY RENOVATION AT PAUL FINDLEY FEDERAL BUILDING & U.S. COURTHOUSE, 600 E MONROE STREET, SPRINGFIELD, IL
TERMINATION FOR CONVENIENCE AGREEMENT FOR THE BUILDING DESIGN STANDARDS PROJECT IN MULTIPLE MICHIGAN LOCATIONS.
JOHN WELD PECK FEDERAL BUILDING, 550 MAIN STREET, CINCINNATI, OH 45202 MODIFICATION PS0005 IS ISSUED TO COORDINATE ADDITIONAL DOOR HARDWARE REQUIREMENTS AS SPECIFIED IN BULLETIN #3.
47PF0023F1048 - JCK FHFA OIG CONFERENCE EXPANSION DESIGN, JCK FB, CHICAGO, IL. MOD TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT ORDER.
CHANGE ORDER TO ADD PHASE 1 ENVIRONMENTAL SITE ASSESSMENT
TERMINATION FOR CONVENIENCE AGREEMENT FOR THE US TRANSCOM PROJECT AT THE PAUL SIMON FEDERAL BUILDING, 250 W. CHERRY STREET, CARBONDALE, IL 69201.
GARAGE CONCRETE RESTORATION - EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN ST., CHICAGO, IL 60604-1702. THIS MODIFICATION INCORPORATES ENVIRONMENTAL INVESTIGATIVE AND DESIGN SERVICES.
DESIGN EVAPORATIVE COOLING SYSTEMS B400 & B401
PLANT GERMPLASM RESEARCH FACILITY PROJECT FOR MADISON, WI
BADLANDS NATIONAL PARK, ENTRANCE STATIONS A/E DD-CD SERVICES
MODIFICATION TO DEOBLIGATE FUNDING FOR ARCHITECT ENGINEER SERVICES FOR "ICE OPLA INDY 4TH FLOOR" MINTON-CAPEHART FEDERAL BUILDING, 575 N PENNSYLVANIA ST, INDIANAPOLIS, IN 46204
E. ROSS ADAIR FEDERAL BUILDING AND U.S. COURTHOUSE, 1300 W, 1300 S. HARRISON STREET, FORT WAYNE, IN 46802 MODIFICATION PS0005 IS ISSUED TO PROVIDE M&I SERVICES TO FACILITATE THE CHIMNEY REPAIR CONSTRUCTION THAT INCLUDE PCCAS, CIS AND RD.
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE REMAINING FUNDS FOR CONTRACT CLOSEOUT. 47PF0019F1078, MOD PA0006 HEREBY DECREASES THE TOTAL OBLIGATED AMOUNT FROM $122,476.50 BY $33.51 TO $122,442.99. THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
MODIFICATION FOR ADDITIONAL DESIGN WORK FOR THE 4TH FLOOR CUSTOM BORDER PATROL PROJECT DESIGN TAKING PLACE IN CHICAGO, IL
CUVA STUMPY BASIN BOARDWALK REPLACEMENT
BASEMENT LEAKS, EVERETT MCKINLEY DIRKSEN U.S. COURTHOUSE, 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS. THIS MODIFICATION DEOBLIGATES $34,000 FOR UNUTILIZED LABOR HOURS ASSOCIATED WITH THE WORK OUTLINED IN MODIFICATION PS0006.
ARCHITECT/ENGINEERING SERVICES FOR THE FOR THE ATRIUM WINDOWS & SLOPED GLAZING CIS PROJECT AT THE UNITED STATES COURTHOUSE, HAMMOND AT 5400 FEDERAL PLAZA HAMMOND, INDIANA 46320-1840.
MAJOR GENERAL EMMETT J. BEAN FEDERAL CENTER, 8899 E. 56TH STREET, INDIANAPOLIS, IN THIS MODIFICATION IS ISSUED TO DEDUCT $7,924.50 FROM THE TASK ORDER DUE TO THE AE CONTRACTOR PERFORMING LESS INSPECTION WORK THAN ORIGINALLY ANTICIPATED.
A/E DESIGN PGRU POULTRY RESEARCH FACILITY
MOD PA0008 IS ISSUED TO DEOBLIGATE UNUSED DESIGN FUNDS FROM THE ORDER. THE ORDER IS REDUCED BY $875.04.
PROVIDE A-E DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES, ADA RENOVATIONS, GREAT LAKES SCIENCE CENTER, ANN ARBOR, MI.
A-E DESIGN SERVICES FOR THE RENOVATION AND MODERNIZATION OF THE HAMMOND BAY BIOLOGICAL STATION (HBBS) CAMPUS LOCATED ON HAMMOND BAY, LAKE HURON, NEAR MILLERSBURG, MICHIGAN
DESIGN SERVICES FOR THE TRANSACTION WINDOWS PROJECT AT THE CHARLES A. HALLECK FEDERAL BUILDING IN LAFAYETTE, IN. DE-OBLIGATING $4,056.62.
ARCHITECT ENGINEER SERVICES FOR "ICE OPLA INDY 4TH FLOOR" MINTON-CAPEHART FEDERAL BUILDING, 575 N PENNSYLVANIA ST, INDIANAPOLIS, IN 46204
JOB CORPS A-E MATOC MODIFICATION P00001 FUNDS THE MINIMUM GUARANTEE AND UPDATES THE TO OMBUDSMAN
CUVA STUMPY BASIN BOARDWALK REPLACEMENT
BAILEY EDWARD DESIGN CONTRACT - 1605AE-21-C-0018/P00007 BUILDING NO. 1 - MODIFICATION NO. P00007 TO CONTRACT NO. 1605AE-21-C-0018 A) THIS MODIFICATION IS HEREBY ISSUED TO PROCESS A NO COST TIME EXTENSION OF 190 CALENDAR DAYS.
CONTRACT GS-05-P-17-SC-D-0003, TASK ORDER 47PF0023F1037: INTERIOR MARBLE STABILIZATION PCCAS, ROBERT A. GRANT FEDERAL BUILDING AND USCH, SOUTH BEND, IN - ADMINISTRATIVE MODIFICATION TO DEOBLIGATE REMAINING FUNDS ON THE COMPLETED PROJECT.
ARCHITECT ENGINEER SERVICES FOR "SENATOR DUCKWORTH ISA CARBONDALE" FEDERAL BUILDING, 536 S. CLARK STREET, CHICAGO, IL 60605.
MODIFICATION TO RECTIFY A PREVIOUS FUNDING DISCREPANCY AND TO INCORPORATE ADDITIONAL CONSTRUCTION SUPPORT DESIGN SERVICES TO THE 4TH FLOOR CUSTOM BORDER PATROL PROJECT TAKING PLACE AT THEIR OFFICES LOCATED IN CHICAGO, ILLINOIS
TASK ORDER 47PF0021F1053 KITCHEN EXHAUST HOOD REPAIRS AT THE E. ROSS ADAIR FEDERAL BUILDING & U.S. COURTHOUSE 1300 S HARRISON ST. IN 46802-3495 BUILDING NUMBER IN0300ZZ
BLDG 5010 TYPE C SERVICES
REGION 5 ARCHITECT/ENGINEERING INDEFINITE DELIVERY INDEFINITE QUANTITY TASK ORDER TO DEVELOP BUILDING DESIGN STANDARDS. 200 EAST LIBERTY STREET, ANN ARBOR, MICHIGAN ROSA PARKS FEDERAL BUILDING, DETROIT, MICHIGAN LEVIN US COURTHOUSE, DETROIT, MICHIGAN
MODIFICATION PS0006 IS ISSUED TO DEOBLIGATE ($1,030.70) FOR ICE OPLA BACKFILL AT MINTON CAPEHART FEDERAL BUILDING, 575 N. PENNSYLVANIA, INDIANAPOLIS, IN, 46204. (IN0133ZZ)
MODIFICATION TO ADD CONSTRUCTION MANAGEMENT AND RECORD DOCUMENTS SERVICES, ARCHITECT AND ENGINEERING SERVICES, DRUG ENFORCEMENT ADMINISTRATION, 8TH FLOOR CEILING AND LIGHT REPLACEMENT, FEDERAL BUILDING, 536 S CLARK STREET, CHICAGO, IL.
MOD PS01AE ENVIRONMENTAL A/E SERVICES FOR THE EXTERIOR WINDOW SEALANT REPLACEMENT PROJECT AT THE FINDLEY FB 600 E. MONROE ST SPRINGFIELD, IL 62701. THIS MODIFICATION DE-OBLIGATES $3,491.30 DUE TO UNUSED ENVIRONMENTAL SERVICES.
A-E DESIGN SERVICES FOR THE RENOVATION AND MODERNIZATION OF THE HAMMOND BAY BIOLOGICAL STATION (HBBS) CAMPUS LOCATED ON HAMMOND BAY, LAKE HURON, NEAR MILLERSBURG, MICHIGAN
A&E SERVICES TO DESIGN SOLUTIONS TO ADDRESS DRAINAGE AND STRUCTURAL CONCERNS
Business Details
- UEI
- HGCMR6UZQ4W9
- CAGE Code
- 3F3P3
- Address
- 35 E WACKER DR STE 2800
CHICAGO, IL 606012308 - Congressional District
- IL-07
- Phone
- 3124402300
Parent Company
BAILEY EDWARD DESIGN, INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov