BOOM CONCRETE INC
NEWELL, SOUTH DAKOTA 577602100
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 321992 | $2.07M | 75 |
| 237990 | $1.15M | 5 |
| 327390 | $307K | 7 |
| 332311 | $235K | 6 |
| 238120 | $178K | 7 |
| 238910 | $63K | 4 |
Contract Awards
50 awards found
MANUFACTURE, DELIVER, SET IN PRE-EXCAVATED HOLE, AND ASSEMBLE TWO SINGLE-STALL PRE-CAST CONCRETE VAULT TOILETS PER THE ATTACHED SPECIFICATIONS. TOILET SHALL BE BOOM CONCRETE CLOVER MIST PLUS MODEL, CXT GUNNISON MODEL, OR EQUIVALENT OR BETTER. VAULT T
RIO GRANDE NF CONEJOS PEAK RD. ONE-TIME PURCHASE OF 2 STANDARD VAULTED TOILETS
WY MIRACLE MILE - DEMOLITION, SUPPLY AND INSTALL THREE (3) PRE-CAST CONCRETE VAULT TOILET BUILDINGS: ONE SINGLE VAULT TOILET BUILDING AND TWO DOUBLE VAULT TOILET BUILDINGS
2024 MONTANA VAULT TOILETS
2024 MONTANA VAULT TOILETS
PLUMBING FIXTURES AND ACCESSORIES
THE PURPOSE OF THIS PROJECT IS TO REMOVE A TOTAL OF 9 EXISTING VAULT TOILET RESTROOM FACILITIES AND REPLACE THEM WITH A TOTAL OF 9 NEW PRE-MANUFACTURED TOILET FACILITIES. THE TOILETS ARE LOCATED ON THE CANJILON LAKES CAMPGROUND OF THE CARSON NATIONA
2024 MONTANA VAULT TOILETS
HLD TRNR CONCRETE DOUBLE VAULT TOILETS
127EAW24C0043 - SEQUOIA NF TOILET INSTALLATION PROJECT
VAULT TOILETS
THIS MOD IS BEING ISSUED FOR TERMINATION FOR CONVENIENCE OF THE GOVERNMENT AND A FULL DE-OBLIGATION OF FUNDS ($46,824.49. NO WORK WAS PERFORMED. THE GOVERNMENT DID NOT HAVE OUR 106 COMPLETED AND THEREFORE COULD NOT HAVE THE CONTRACTOR BEGIN WORK. TH
RESTROOM REPLACEMENT
8420240261-PREFAB CNCRT RESTRM-LL CMPGRD
LITTLE GRIZZLY CAMPGROUND VAULT TOILET
PURCHASE, DELIVERY, AND PLACEMENT OF 2 VAULT TOILETS. ONE WILL BE PLACED AT POAGE LAKE PARKING LOT, THE OTHER WILL BE PLACED AT FRISCO CREEK TRAILHEAD.
MANUFACTURE, DELIVER, SET IN PRE-EXCAVATED HOLE, AND ASSEMBLE TWO SINGLE-VAULT PRE-CAST CONCRETE VAULT TOILETS PER THE ATTACHED SPECIFICATIONS.
TAFO SCL 1 SINGLE AND 1 DOUBLE VAULT TOILET PURCHASE
HAGERMAN PUMP WELL PRE-FAB BUILDING
44 TRAILS HUB TRAILHEAD TOILET INSTALLATION AND BENNETT PASS SNO-PARK TOILET RELOCATION
TWO DOUBLE AND ONE SINGLE TOILET TO BE PLACED ACCORDING TO ATTACHED MAP.
CO-ROCKY-VAULT TOILET FOR RKY FLATS NWR
THE PROJECT WILL INCLUDE THE PROCUREMENT & INSTALLATION OF 1 - DOUBLE VAULT TOILET BUILDING AND THE CONSTRUCTION OF DRAINAGE BERMS AT THE TRES PIEDRAS RANGER DISTRICT OFFICE.
WI-HORICON NWR-DOUBLE VAULT TOILET MOD 1 TO DEOBLIGATE FUNDS TO CLOSE OUT ORDER.
VAULT TOILETS
PLUMBING FIXTURES AND ACCESSORIES
DES VAULT TOILETS (SRD/BFRD) - REQUIREMENT IS TO SUPPLY ONE SINGLE VAULT TOILET TO COLD SPRINGS CAMPGROUND, ONE SINGLE VAULT TOILET TO LITTLE CRATER DAY USE AREA, AND ONE DOUBLE VAULT TOILET TO SMILING RIVER CAMPGROUNDS.
PURCHASE OF 1 REPLACEMENT TOILET FOR RIO GRANDE RESERVOIR. REQUISITION IS FOR PURCHASE AND PLACEMENT OF TOILET ONLY - CONTRACTOR WILL NOT PROVIDE ANY SITE PREPARATION, EXCAVATION, GRADING, OR FINISH WORK.
TAFO DIABLO CANYON VAULT TOILET INSTALL
NM TAFO QUARTZITE VAULT TOILET PURCHASE
127EAW23R0045 - SAN GABRIEL CANYON TOILET DEMOLITION AND INSTALLATION
MIDEWIN VAULT TOILET PURCHASE
GAOA: PHASE I WILL INCLUDE THE PROCUREMENT & INSTALLATION OF TWO DOUBLE VAULT TOILET BUILDINGS AND THE PROCUREMENT AND INSTALLATION A SEPTIC VAULT FOR THE PROPOSED CAMP HOST SITE.
GAOA MCCLOUD RIVER RECREATION AREA DEFERRED MAINTENANCE, VAULT TOILET
SUPPLY AND INSTALL VAULT TOILE AT SNAKE LAKE CAMPGROUND
X:NOGRN, DE-OBLIGE EXCESS FUNDING, MOD 1 ADD ADDITIONAL FUNDING FOR ADDITIONAL SHIPPING, SUPPLY AND DELIVER VAULT TOILETS TO STAIRCASE - OLYM
VAULT TOILET
WORK WILL INCLUDE MANUFACTURING OF THE DOUBLE VAULT TOILETS TO FOREST SERVICE SPECIFICATIONS, TRANSPORTATION OF VAULT TOILETS TO THE JOB SITE, OFFLOADING THEM FROM THE DELIVERY TRUCK INTO PRE-EXCAVATED HOLES AND JOB SITE CLEANUP AFTER THE VAULT TOIL
PRECAST VAULT TOILETS - LAC QUI PARLE DAY USE AREAS
MO - MINGO VAULT TOILET REPLACEMENT - TWO VAULT TOILETS WITH INSTALLATION
VAULT TOILETS FOR WICHITA MOUNTAINS NWR
SUPPLY, GAOA, 4AP EDNA CREEK CAMPGROUND TOILETS, BASE ITEM
MT-CMR NWR-SC-DOUBLE VAULT TOILET BLDG
MODIFICATION 0003 SUPPLEMENTAL AGREEMENT TO RELOCATE TWO VAULT TOILETS TO ALTERNATE LOCATION
MODIFICATION TO COVER THE REMOBILIZATION COSTS.
PLUMBING FIXTURES AND ACCESSORIES
1 - NEW PREFAB CONCRETE STRUCTURE DELIVERED AND INSTALLED ACCORDING. DELIVERY LOCATION IS A REMOTE RECREATION SITE IN THE NATIONAL FOREST.
CONCRETE PREFABRICATED VAULT RESTROOM AND INSTALL-GA-FWS OKEFENOKEE NWR
FIVE VAULT TOILETS WITH DELIVERY TO BLANDING LANDING, ANDALUSIA AND CORALVILLE LAKE.
TWO DOUBLE AND ONE SINGLE TOILET TO BE PLACED ACCORDING TO ATTACHED MAP.
Business Details
- UEI
- N7YJQ9S73BB5
- CAGE Code
- 1RD47
- Address
- 220 S GIRARD AVE
NEWELL, SD 577602100 - Congressional District
- SD-00
- Phone
- 6054562600
Parent Company
BOOM CONCRETE INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov