BORTON-LAWSON ENGINEERING, LLC
DBA: BORTON LAWSON
WILKES BARRE, PENNSYLVANIA 187027902
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541310 | $5.69M | 247 |
| 541330 | $3.51M | 17 |
Contract Awards
50 awards found
THE PURPOSE OF THE MODIFICATION IS FOR THIS ADDITIONAL SERVICE REQUEST CONCERNING THE REVIEW AND STUDY OF THE RETAINING WALL AT THE WEST POINT MINT AND EXTEND POP.
THIS PURPOSE OF THIS MODIFICATION IS FOR A BOUNDARY SURVEY.
THIS MODIFICATION IS TO INCORPORATE PROJECT SCOPE REVISION NO.: 4 DATED 31 JULY 2025 TO EVALUATE AND DESIGN ADJUSTMENTS FOR THE HVAC SYSTEM. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER.
THIS PURPOSE OF THIS MODIFICATION IS FOR ADDITIONAL STRUCTURAL DESIGN TO LOCATE ONE OF THE RETURN TANKS CLOSER TO THE WALL IN THE ENGRAVING ROOM TO FACILITATE WORKER ACCESS AND EXTEND THE PERIOD OF PERFORMANCE FROM 12/31/2025 TO 12/31/2026.
BUILDING 15 RENOVATIONS DESIGN MOD
EV CHARGING STATION THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGE REQUEST #3 FOR TRANSFORMER RELOCATION.
BUILDING 5, BAY 5 & 6 RENOVATIONS
THE PURPOSE OF THIS MODIFICATION IS TO RE-OBLIGATE FUNDING THAT WAS INADVERTENTLY DEOBLIGATED ON MODIFICATION P00003. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
3RD FLOOR RESTROOM RENOVATION THE PURPOSE OF THIS MODIFICATION IS TO 1) INCORPORATE CHANGE REQUEST #1 DATED 7 NOVEMBER 2024; AND 2) TO ADMINISTRATIVELY UPDATE THE CONTRACTING OFFICER TO EILEEN CASTLE.
ROOM 261 FLOOR LOADING ANALYSIS THIS MODIFICATION ADDS A A&E SERVICES FOR A DESIGN PACKAGE FOR THE RELOCATION OF AN EXISTING S&K 1250 PRESS IN PHILADELPHIA ROOM 261.
THIS PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST FOR ADDITIONAL PUMP PIPING, BAS CONNECTION, AND COMMISSIONING.
THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST #2 TO EVALUATE AND UPDATE DESIGN FOR CHILLED WATER AND HUMIDITY CONTROL AND CHANGE ORDER REQUEST #3 TO EVALUATE AND UPDATE DESIGN FOR CEILING AND LOADING DOCK REPAIRS.
EV CHARGING STATION THE PURPOSE OF THIS MODIFICATION IS TO 1) INCORPORATE CHANGE REQUEST #2 DATED 22 OCTOBER 2024 TO CHANGE A LEVEL 3 CHARGER TO A LEVEL 2 CHARGER; AND 2) EXTEND THE PERIOD OF PERFORMANCE END DATE TO 14 NOVEMBER 2025.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
PROCESS WATER PIPE SHAKING THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
THIS MODIFICATION ADDS BIDDING, CONSTRUCTION ADMINISTRATION SERVICES AS WELL AS POST CONSTRUCTION SCANNING, T.A.B., AND RECORD DRAWING PACKAGE.
THIS PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL SERVICES IN ACCORDANCE WITH CHANGE REQUEST DATED 9 AUGUST 2024.
THIS PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL SERVICES IN ACCORDANCE WITH CHANGE REQUEST DATED 12 JULY 2024.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A CHANGE ORDER REQUEST.
MIST ELIMINATOR
WP CRAC UNIT REPLACEMENTS DESIGN THE PURPOSE OF THIS MODIFICATION IS TO ADD SERVICES TO ADDRESS ISSUES WITH EXISTING DUCT WORK.
GUARD SHACK THIS PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL SERVICES IN ACCORDANCE WITH CHANGE REQUEST DATED 30 APRIL 2024. ALL SERVICES PERFORMED BY THE CONTRACTOR WILL BE IN ACCORDANCE WITH CONTRACT 2031JG19D00015 AND BL NOAS B19.000431801
ROOM 261 FLOOR LOADING ANALYSIS THIS MODIFICATION ADDS ENGINEERING SUPPORT TO REMOVE A PORTION OF THE EXISTING WALL, CAP AND REMOVE EXISTING FLOOR DRAINS, MODIFY THE EXISTING DUCTWORK AND PROVIDE ENGINEERING SUPPORT.
THIS PURPOSE OF THIS MODIFICATION IS TO 1) EXTEND THE PERIOD OF PERFORMANCE TO 31 JULY 2025; AND 2) ADD ADDITIONAL SERVICES IN ACCORDANCE WITH CHANGE REQUEST DATED 30 APRIL 2024.
EV CHARGING STATION THIS MODIFICATION ADDS ENGINEERING SUPPORT IN ACCORDANCE WITH CHANGE REQUEST #1 DATED 10 APRIL 2024.
MODIFICATION 2031JG19D00016-2031JG22F00387 THIS MODIFICATION ADDS ENGINEERING DESIGN SERVICES FOR THE REPLACEMENT OF THE CHILLER PIPING FOR THE OUTDOOR AIR HANDLING UNITS IN THE FORM OF DEMOLITION AND NEW CONSTRUCTION DRAWINGS.
THIS MODIFICATION ADDS SERVICES TO MODIFY EXISTING AUTOMATED LOUVER AND ADD ADDITIONAL HEADER PIPING.
RENOVATION 108 AND 158A
THIS PURPOSE OF THIS MODIFICATION IS TO INCLUDE ENGINEERING DESIGN TO ADDRESS CIRCULATED COOLING WATER ISSUES NOTED WITHIN THE ENGINEERING STUDY CONCERNING ROOM 265.
THE PURPOSE OF THIS MODIFICATION IS TO ADD HVAC STUDY AND ADDITIONAL RECOMMENDATION SERVICES NEEDED TO MEET SCOPE CHANGE ATTACHMENTS.
THE PURPOSE OF THIS MODIFICATION IS TO PERFORM A SITE INVESTIGATION AND ENGINEERING STUDY TO IDENTIFY THE STEEL/DRAWINGS NEEDED TO MEET SCOPE CHANGE ATTACHMENTS.
TO 11 BLDG 11 OFFICES RENOVATION
MODIFICATION 2031JG19D00016-2031JG22F00387-DUCT DEMO AND ADD CRANE.
GUARD SHACK
THE PURPOSE OF THIS MODIFICATION TO ADD FUNDING FOR ADDITIONAL SERVICES TO SUPPORT THE FLOODING EMERGENCY REPAIRS (INSIDE THE FENCE FLOOD STUDY) AT THE WEST POINT MINT.
BLD 58 HVAC REPLACEMENT DESIGN TYAD
ROOM 261 FLOOR LOADING ANALYSIS
MIST ELIMINATOR
Business Details
- UEI
- LJ5SE5F1TRN7
- CAGE Code
- 09MV0
- Address
- 613 BALTIMORE DR STE 300
WILKES BARRE, PA 187027902 - Congressional District
- PA-08
- Phone
- 5708211994
Parent Company
BORTON-LAWSON ENGINEERING, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov