THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADDITIONAL ENVIRONMENTAL ANALYSIS FOLLOWING PROJECT DESIGN CHANGES.
THE PURPOSE OF THIS MODIFICATION IS TO DE-SCOPE EFFORTS UNDER ITEMS 4.2 MARINE RESOURCES WORK PLAN ROP VERSION AND 4.4 HYDROLOGICAL ANALYSIS AND UNUSED CONTINGENCY DAY LABOR EFFORTS.
CONTRACT NO. N62742-18-D-1802, CONTRACT TASK ORDER (CTO) NO. N6274222F0161, P00003
INCORPORATE ADDITIONAL EFFORTS UNDER TASK 28. WAIPIO SOFT SEDIMENT SURVEY AND DREDGE MATERIAL EVAL REPORT AND TASK 37. REVISED DRY DOCK 5 DREDGE MATERIAL EVAL REPORT FOR BENEFICIAL REUSE OF MATERIAL ABOVE -57 FT. EXTEND THE POP TO 29 AUGUST 2025.
X011 ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR BREMERTON WATERFRON
PREPARE AN ENVIRONMENTAL ASSESSMENT (EA) IN ACCORDANCE WITH THE N
REA ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR BREMERTON WATERFRONT (NBK/PSNS), BREMERTON, WA
MODIFICATION TO SUPPORT MARINE RESOURCES SURVEYS FOR P-676 POLARIS POINT PIER
MODIFICATION FOR ADDITIONAL EA VERSIONS AND INCREASED MEETINGS
THE PURPOSE OF THIS MODIFICATION IS TO REALIGN TASKS 1, 2, 4 AND 9 AND EXTEND THE PERIOD OF PERFORMANCE FROM 30 JUNE 2024, TO AND INCLUDING, 31 JANUARY 2025.
UPDATE TO AERIAL PHOTOGRAMMETRY SURVEY OF FARALLON DE MEDINILLA
X011 ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR BREMERTON WATERFRON
NATURAL AND CULTURAL RESOURCES AT THE MALAKAL PORT - MODIFICATION P00003 TO INCORPORATE PRE-PRICED OPTION TASKS 4 AND 5
MARINE MITIGATION IN SUPPORT OF P-209 DRY DOCK 3 REPLACEMENT JOINT BASE PEARL HARBOR-HICKAM, HAWAII
NATURAL AND CULTURAL RESOURCES AT THE MALAKAL PORT - MODIFICATION P00002 TO INCORPORATE DOP REQUIREMENTS
CONTRACT NO. N62742-18-D-1802, TASK ORDER N6274222F0206, AMENDMENT 39, MODIFICATION P00003
MARINE MITIGATION IN SUPPORT OF P-209 DRY DOCK 3 REPLACEMENT JOINT BASE PEARL HARBOR-HICKAM
EDIT FINAL PRODUCTION VIDEO FOR PUBLIC VIEWING.
DEOBLIGATE UNUSED FUNDS
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE, RETAIN SUBTASK 3.3.2, SOUND ANALYSIS, REMOVE THE SOUND PRELIMINARY REPORT AND DEOBLIGATE THE TAXES APPLIED FOR THIS PROJECT.
MARINE MITIGATION IN SUPPORT OF P-209 DRY DOCK 3 REPLACEMENT JOINT BASE PEARL HARBOR-HICKAM, HAWAII
ADDITIONAL EFFORT FOR THE OSTEOLOGICAL ANALYSIS AND REMOVAL OF UNUSED MARINE CONTINGENCY DAYS
JBPHH INRMP AM. 16: MODIFICATION P00004 INCORPORATES THE REVISION OF THE PERIOD OF PERFORMANCE TO 30 SEPTEMBER 2024 AND ADDITIONAL PROJECT MANAGEMENT EFFORT REQUIRED.
PACIFIC DETERRENCE INITIATIVE BASELINE SURVEYS AT VARIOUS PORT LOCATIONS IN THE PACIFIC AREA OF RESPONSIBILITY, PERIOD OF PERFORMANCE EXTENSION TO 29 FEBRUARY 2024
RANGE BASELINE CONDITIONS ASSESSMENT, HAND GRENADE RANGES, USMC CAMP BLAZ, GUAM
CONTRACT NO. N62742-18-D-1802, TASK ORDER N6274222F0206, AMENDMENT 39 MODIFICATION P00002 PUBLIC/AGENCY OUTREACH, NOI, PREPARE A FEIS AND ROD (OPTION), CONSULTATION SUPPORT
CONTRACT NO. N62742-18-D-1802 CTO N6274223F0113 P00003 DEOBLIGATION OF WORK ELEMENTS 5 AND 6
COMBINED MAINTENANCE AND REMEDIAL DREDGE DESIGN FOR OSCAR, PAPA,
X011 ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR BREMERTON WATERFRON
MARINE MITIGATION IN SUPPORT OF P-209 DRY DOCK 3 REPLACEMENT JOINT BASE PEARL HARBOR-HICKAM, HAWAII
NATURAL AND CULTURAL RESOURCES AT THE MALAKAL PORT
N62742-18-D-1802 CONTRACT TASK ORDER (CTO) NO. N6274223F0136, ENVIRONMENTAL ASSESSMENT FOR GROUND BASED FORCES MODERNIZATION AT MARINE CORPS BASE HAWAII, KANEOHE BAY MODIFICATION P00001
N62742-18-D-1802,CONTRACT TASK ORDER (CTO) NO. N6274219F0183, ENVIRONMENTAL IMPACT STATEMENT FOR SUBMARINE DRY DOCK AND DRY DOCK PRODUCTION FACILITY AT PEARL HARBOR NAVAL SHIPYARD, PEARL HARBOR, HAWAII MOD 5
WON 1782976 UNDERWATER ARCHAEOLOGICAL SURVEY OF CURRENT MOORING BUOYS AT OUTER APRA HARBOR, NAVAL BASE GUAM
NATURAL AND CULTURAL RESOURCES SURVEYS AT THE TINIAN PORT EXERCISE PRE-PRICED OPTIONS FOR SOUND ANALYSIS AND HYDROLOGICAL ANALYSIS
WON 1684393 SUPPLEMENT TO PROGRAMMATIC BIOLOGICAL ASSESSMENT FOR JOINT REGION MARIANAS INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN
NATURAL AND CULTURAL RESOURCES SURVEYS AT THE TINIAN PORT MOD 1 IS TO DEOBLIGATE THE FUNDS FOR THE PRE-PRICED OPTIONS
CONTRACT NO. N62742-18-D-1802 CONTRACT TASK ORDER N6274223F0133 (AM 46): MARINE MITIGATION IN SUPPORT OF P-209 DRY DOCK 3 REPLACEMENT JOINT BASE PEARL HARBOR-HICKAM, HAWAII MODIFICATION P00002- AIS ADDITIONAL SURVEYS AND ERADICATION
NATURAL AND CULTURAL RESOURCES SURVEYS AT THE TINIAN PORT
AMENDMENT 43: ENVIRONEMENTAL ASSESSMENT FOR POLARIS POINT SUBMARINE PIER, NAVAL BASE GUAM.
NEPA PRE-PLANNING FOR PMRF SUCCEEDING LEASES AND EASEMENTS KAUAI, HAWAII. MOD P00001 INCORPORATES CHANGE TO TO COR AND INCORPORATES TASK 7: STRATEGIC COMMUNICATIONS PLAN
DEOBLIGATION OF FUNDING FOR THE ENVIRONMENTAL ASSESSMENT FOR OSCAR, PAPA, QUEBEC, ROMEO WHARF DREDGING AT NAVAL BASE GUAM, APRA HARBOR, GUAM
DE-OBLIGATE -$134,175.53 FROM GUAM OPQR EA PROJECT.
PACIFIC DETERRENCE INITIATIVE BASELINE SURVEYS AT VARIOUS PORT LOCATIONS IN THE PACIFIC AREA OF RESPONSIBILITY P00005 EXTEND THE PERIOD OF PERFORMANCE, INCORPORATE ADDITIONAL PROJECT MANAGEMENT EFFORT.
RANGE BASELINE CONDITIONS ASSESSMENT, HAND GRENADE RANGES, USMC CAMP BLAZ, GUAM
LUALUALEI FENCE PLAN FOR MIKILUA
ENVIRONMENTAL ASSESSMENT FOR ROUND FORCES MODERNIZATION, MCB HAWAII
X011 ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR BREMERTON WATERFRON
ADDITIONAL NOISE ANALYSES FOR SUBMARINE DRY DOCK AND WATERFRONT PRODUCTION FACILITY AT JOINT BASE PEARL HARBOR-HICKAM, OAHU, HAWAII
UPDATE TO AERIAL PHOTOGRAMMETRY SURVEY OF FARALLON DE MEDINILLA BOMBARDMENT RANGE IN SUPPORT OF NATIONAL ENVIRONMENTAL POLICY ACT IN SUPPORT OF THE MARIANA ISLANDS RANGE COMPLEX, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS
Business Details
- UEI
- GLMMBP7GKM63
- CAGE Code
- 7XZC8
- Address
- 2496 OLD IVY RD #300
CHARLOTTESVILLE, VA 229034895 - Congressional District
- VA-05
- Phone
- 7573066741
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov