CDM FEDERAL PROGRAMS CORPORATION
DBA: CDM
FAIRFAX, VIRGINIA 220307301
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 562910 | $158.21M | 439 |
| 541690 | $50.09M | 152 |
| 541330 | $37.77M | 137 |
| 541620 | $35.97M | 113 |
| 541618 | $6.68M | 67 |
| 541511 | $2.48M | 14 |
| 541715 | $1.73M | 14 |
| 541199 | $268K | 2 |
Contract Awards
50 awards found
DES CONTRACT - OLIN OPERABLE UNIT 1 (04B6) SUPERFUND SITE - RD/RA TECHNICAL SUPPORT. P00008 TO ADD FUNDING TO CLINS 2002, 2023, AND 2029
MODIFICATION WAPPINGER CREEK REMEDIAL INVESTIGATION AND FEASIBILITY STUDY
NEW TASK ORDER UNDER THE FREIGHT BPA TITLED "INDUSTRY OUTREACH, EDUCATION, AND SAFETY PRACTICES FOR BRIDGE AND TUNNEL STRIKE PREVENTION".
REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES)_BURLINGTON INDUSTRIES CHERAW OU2 SITE - DE-OBLIGATE FUNDS FROM CLIN 1001A (ACCOUNT LINE #35). THE INTENT IS TO ADD THESE FUNDS TO CLIN 0001A.
R10 DES: WASHINGTON COUNTY LEAD DISTRICT - FURNACE CREEK SITE OU3 AND OU4 RI/FS MOD P00007: INCREASE THE CEILING AND FUND ADDITIONAL LOE TO COMPLETE THE REMAINING SITE SPECIFIC PROJECT PLANS
R7 RAF/DES SOUTHWEST JEFFERSON COUNTY SUPERFUND SITE, OPERABLE UNIT (OU) 6, VALLES MINES REMEDIAL INVESTIGATION AND FEASIBILITY STUDY MOD P00007: FUNDING FOR POP EXTENSION ON MOD P00006 AND ADDITIONAL LOE TO FINALIZE THE QUALITY ASSURANCE PROJECT PL
HANLIN OU1 AND OU2
---------- COMMENTS: DESIGN-BUILD CONTRACT NO. 191BWC22C0001 IS TA DESIGN-BUILD PROJECT FOR THE EDINBURG PUMP STATION LEVEE REHABILITATION IN PE ITAS, HIDALGO COUNTY, TEXAS. CM SERVICES ARE REQUIRED TO PROVIDE CONSTRUCTION INSPECTION AND CONSTRUCTION
FEMA HAZARD MITIGATION TECHNICAL ASSISTANCE PROGRAM (HMTAP) NON A&E SUPPORT SERVICES - SECTOR B TASK ORDERS ISSUED DURING THE ORDERING PERIOD MAY BE FIRM FIXED PRICED (FFP) OR COST PLUS FIXED FEE (CPFF).
COMMENTS: CONSTRUCTION MANAGEMENT SERVICES ARE REQUIRED FOR REPLACEMENT OF PENSTOCK #5 HYDRAULIC SYSTEM CONTRACT.
NEWTOWN CREEK OU1 - REMEDIAL INVESTIGATION/FEASIBILITY STUDY OVERSIGHT - SUPPLEMENTAL WORK UNDER SUBTASKS 8.1 "TECHNICAL ASSISTANCE MEETING AND SUPPORT" FOR PARTICIPATION IN CONFERENCE CALLS WITH EPA AND/OR OTHER PARTIES REGARDING PROJECT S
CM SERVICES FOR CONSTRUCTION PROJECT (UPPER BROWNSVILLE& FLOOD CONTROL)
DES TASK ORDER, COLUMBIA FALLS, ANACONDA ALUMINUM, RI/FS OS, NEGOTIATION SUPPORT, RD/RA OS
REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES) - CIBA OPERABLE UNIT (OU) OU2 AND OU4(04B1) SUPERFUND SITE -- RD/RA TECHNICAL SUPPORT
MCLOUTH STEEL CORP (MSC) SUPERFUND SITE: RAF, DES, CLIN 0002, RI/FS TASK ORDER THE PURPOSE OF MODIFICATION P00014 1) EXERCISE OPTIONAL CLINS 2001 AND 2001FEE FOR OPTION YEAR 2. 2) EXTEND POP DATE TO 9/29/2027
CM SERVICES FOR CONSTRUCTION PROJECT (UPPER BROWNSVILLE& FLOOD CONTROL)
DES CONTRACT - OLIN OPERABLE UNIT 1 (04B6) SUPERFUND SITE - RD/RA TECHNICAL SUPPORT
R7 DES NEWTON COUNTY MINE TAILINGS OPERABLE UNIT 4 GROUNDWATER INVENTORY OF WELLS, SAMPLING, AND TECHNICAL IMPRACTICABILITY WAIVER WORKPLAN
R7 DES ORONOGO-DUENWEG MINING BELT, OPERABLE UNIT 4, GROUNDWATER INVENTORY OF WELLS, SAMPLING, AND TECHNICAL IMPRACTICABILITY WAIVER WORKPLAN
EXPERT CONTRACTOR TECHNICAL ASSISTANCE SUPPORT SERVICES FOR THE HAZARD MITIGATION ASSISTANCE PROGRAM OFFICE AND ALL 10 FEMA REGIONS FOR, PLANNING OF, AND CONDUCTING REVIEW OF SUB APPLICATIONS FOR HMA PROGRAMS TO COMPLETE THE FY2024 REVIEW CYCLES. THE
R10 DES TO - BLACK BUTTE MINE SUPERFUND SITE RI/FS MOD P00013: INCREASE TASK ORDER CEILING FOR A RE-ALLOCATION OF DIRECT LABOR COSTS AND ADD INCREMENTAL FUNDING
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
R10 DES: LOWER DUWAMISH WATERWAY REMEDIAL DESIGN/REMEDIAL ACTION (RD/DA) OVERSIGHT SUPPORT MOD P00004: NET $0 CHANGE ORDER TO RE-ALLOCATE TASK BUDGETS BASED ON PREVIOUSLY AGREED TERMS AND TO ADD INCREMENTAL FUNDING
OPTION EXERCISE DES CABO ROJO REMEDIAL DESIGN
NEWTOWN CREEK SUPERFUND SITE OU2 MONITORING PROGRAM OVERSIGHT -EXERCISE CLINS 3001 THROUGH 3003.
NEW BPA CALL ORDER TITLED DATA NEEDS FOR FUTURE CROSS-CUTTING VEHICLE SIZE AND WEIGHT RESEARCH (PHASE 2).
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
MODIFICATION P00005 - CHANGE ORDER AND FUNDING FOR ADDITIONAL DATA COLLECTION (WITH A PORTABLE GAS CHROMATOGRAPH) DURING MONITORING WELL INSTALLATION, AND CORRESPONDING UPDATES TO THE UNIFORM FEDERAL POLICY FOR QUALITY ASSURANCE PROJECT PLAN (UFP-QAP
INITIAL BUSINESS CASE ANALYSIS AND TECHNICAL LIBRARY, JBPHH HI
NLD ENHANCEMENT, DAM AND LEVEE TOOLBOX TASK ORDER
68HE0318D0001/68HE0321F0050 P00010
SALFORD QUARRY POC SHARON FANG 215-814-3018
EXSITU STABILIZATION OF PFAS IMPACTED SOILS AND SEDIMENTS
INITIAL BUSINESS CASE ANALYSIS AND TECHNICAL LIBRARY, JBPHH HI
IWR - RISK ANALYSIS TRAINING. REVIEW THE RISK ANALYSIS TRAINING MATERIALS USED AND PROVIDE ALTERATIONS TO AGENDA, PRESENTATION AND TRAINING EXERCISES, PROVIDE INSTRUCTION INCLUDING WORKSHOP APPLICATIONS.
DES SAN GERMAN OU2 REMEDIAL DESIGN
MASTER PLANNING SERVICES FOR TRANSPORTATION MANAGEMENT PLANS AT MALMSTROM AIR FORCE BASE
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
68HE0318D0001/68HE0321F0050 P00010
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
THE PURPOSE OF THIS MODIFICATION IS TO LIFT THE STOP WORK ORDER AND DE-SCOPE THE TASK ORDER SOW TO COMPLY WITH CURRENT PRIORITIES.
IWR - E-RISK REGISTER SYSTEM MAINTENANCE AND IMPROVEMENTS. ADD WORK WITHIN THE GENERAL SCOPE OF THE CONTRACT TO ADD ADDITIONAL SERVICES FOR MINOR AND MODERATE IMPROVEMENTS. CONCURRENTLY, OPTION TASKS 1B, 14 AND 14B ARE BEING EXERCISED.
MCLOUTH STEEL CORP (MSC) SUPERFUND SITE: RAF, DES, CLIN 0002, RI/FS TASK ORDER THE PURPOSE OF MODIFICATION P00012: 1) APPROVE RFI 12.1 FOR POREWATER SAMPLES IN THE AMOUNT OF $24,189.35. EXERCISE AND FUND OPTION YEAR 1 (CLINS 1001 AND 1001FEE). TH
68HE0318D0003/68HE0321F0073 P00002 SALTVILLE WASTE DISPOSAL PONDS SUPERFUND SITE DES TASK ORDER
MCLOUTH STEEL CORP (MSC) SUPERFUND SITE: RAF, DES, CLIN 0002, RI/FS TASK ORDER THE PURPOSE OF MODIFICATION P00011: 1) 1) FUND RFI 5.1 IN THE AMOUNT OF $537,351.83 (CLIN 0001 $496,398.92 / CLIN 0001FEE $40,952.91)
THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING IN THE AMOUNT OF $61,190 FOR SUBTASK 2.3.2. THIS ADJUSTMENT IS NECESSARY TO ACCOMMODATE THE INCREASED TIME AND EFFORT INVOLVED IN COMPILING AND INVENTORYING EXISTING DATASETS. CDM SMITH
DAM AND LEVEE TOOLBOX MINIMUM GUARANTEE
POST CONSTRUCTION AWARD SERVICES FOR CLEARWELL CONSTRUCTION ONBOARD NAVAL STATION GREAT LAKES, IL
THIS ORDER WILL PROVIDE OFFSITE SYSTEM DESIGN AND PROGRAMMING SUPPORT FOR THE NATIONAL LEVEE DATABASE WEB APPLICATION FOR THE US ARMY CORPS OF ENGINEERS DAM AND LEVEE SAFETY PROGRAM.
IWR - UPDATES TO ENGINEER PAMPHLET 415-1-261 AND ASSOCIATED DELIVERABLES. SUPPORT TO UPDATE QUALITY REPRESENTATIVES GUIDES AND DELIVER ASSOCIATED CHECKLISTS.
Business Details
- UEI
- DHS5ZJSFCSH9
- CAGE Code
- 0JHB8
- Address
- 10560 ARROWHEAD DR STE 500
FAIRFAX, VA 220307301 - Congressional District
- VA-11
- Phone
- 7036916500
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov