CITY LIGHT & POWER AWP, LLC
GREENWOOD VILLAGE, COLORADO 801114921
Contract Awards
50 awards found
MODIFICATION P00148 AWARDS SERVICE CONNECTION PROJECT WPE-25-05, SERVICE TO DRAGON PARK.
MODIFICATION P00147 AWARDS SERVICE CONNECTION PROJECT WPE-25-04, 2025 AAA LOT GENERATOR.
MODIFICATION P00145 AWARDS SERVICE CONNECTION PROJECT WPE-25-001, NORTH RAMP POWER.
MODIFICATION P00144 OBLIGATES FUNDING FOR THE UTILITY SERVICE CHARGE.
MODIFICATION P00143 AWARDS SERVICE CONNECTION PROJECT WPE-25-02, FIRE STATION II TENT POWER.
MODIFICATION P00142 EFFECTS AN ECONOMIC PRICE ADJUSTMENT, OBLIGATES FUNDING FOR THE MONTHLY UTILITY SERVICES CHARGE, AND UPDATES THE CONTRACT'S WAGE DETERMINATIONS.
MODIFICATION P00141 AWARDS A CHANGE ORDER FOR PROJECT WPE-24-05, 2024 AAA LOT GENERATOR.
MODIFICATION P00140 OBLIGATES FUNDING FOR THE UTILITY SERVICE CHARGE.
MODIFICATION P00138 OBLIGATES FUNDING FOR THE UTILITY SERVICE CHARGE.
MODIFICATION AWARDS CLIN 0144 FOR WPE-24-24, CENTRAL AREA MICROGRID N. 5KV TO 15KV INT. TRANSFORMER.
MODIFICATION P00132 AWARDS CLIN 0140 FOR WPE-24-26, SOUTH DOCK 5KV TO 15KV FEEDER AND TRANSFORMER CONVERSION.
MODIFICATION P00133 AWARDS CLIN 0141, WPE-24-28 DELAFIELD TO SOUTH SWITCH INTERTIE (MICHIE TO SS DUCT BANK)
MODIFICATION P00143 AWARDS CLIN 0142 FOR WPE-24-23, SUB B TO SOUTH SWITCH 5KV TO 15KV CONVERSION.
MODIFICATION P00135 AWARDS CLIN 0143 FOR PROJECT WPE-24-27, CENTRAL AREA MICROGRID NORTH 5KV TO 15KV FEEDER CONVERSION.
MODIFICATION P00131 AWARDS CLIN 0139, RUGER RD. RESILIENCY TIE.
MODIFICATION P00130 AWARDS CLINS 0124 - 0138 FOR ELECTRICAL SERVICE CONNECTION TO 15 ELECTRIC VEHICLE CHARGING SITES.
MODIFICATION P00129 AWARDS CAPITAL UPGRADE PROJECT WPE-24-022, DELAFIELD TO SUB B DEDICATED INTERTIE.
MODIFICATION P00128 AWARDS SYSTEM DEFICIENCY CORRECTION PROJECT WPE-23-012, MUSEUM TRANSFORMER REPLACEMENT.
MODIFICATION P00127 AWARDS SERVICE CONNECTION PROJECT WPE-24-006, WILSON GATE LIGHTING.
MODIFICATION P00126 EFFECTUATES A PARTIAL TERMINATION FOR CONVENIENCE FOR CLIN 0070, WPE-20-06 69KV UPGRADE - DESIGN SPECIFICATION.
MODIFICATION P00125 AWARDS PROJECT WPE-24-05, AAA LOT GENERATOR.
MODIFICATION P00124 AWARDS PROJECT WPE-24-04, SPELLMAN EXTERIOR LIGHTING.
MODIFICATION P00123 AWARDS PROJECT WPE-24-02, CEAC WIND TUNNEL.
MODIFICATION P00122 AWARDS PROJECT WPE-24-03, UPPER AREA K SITE LIGHTING.
MODIFICATION P00121 OBLIGATES FUNDING FOR THE UTILITY SERVICE CHARGE FROM MAY THROUGH SEPTEMBER.
MODIFICATION P00120 ENACTS AN ECONOMIC PRICE ADJUSTMENT FOR CONTRACT YEAR 7 DUE TO INFLATION AND ADDITIONAL ASSETS FROM NEW ELECTRIC UTILITY SERVICE CONNECTIONS AND UPGRADES.
P00119 AWARDS PROJECT WPE-23-03, CAMP BUCKNER PHASE 3.
P00116 OBLIGATES FUNDING FOR THE CONTRACTS FIXED MONTHLY UTILITY SERVICES CHARGE.
P00115 OBLIGATES FUNDING FOR THE CONTRACTS FIXED MONTHLY UTILITY SERVICES CHARGE.
P00114 OBLIGATES FUNDING FOR THE CONTRACTS FIXED MONTHLY UTILITY SERVICES CHARGE.
P00113 PROVIDES AN EQUITABLE PRICE ADJUSTMENT TO THE CONTRACTOR FOR REPLACEMENT OF DEMOLISHED ELECTRICAL FEEDERS SERVICING THE CEAC FACILITY.
P00112 OBLIGATES FUNDS FOR THE DECEMBER UTILITY SERVICE CHARGE.
P00111 OBLIGATES FUNDS FOR PROJECT WPE-24-01, GIB LIGHTS.
P00110 OBLIGATES FUNDS FOR THE UTILITY SERVICES CHARGE.
P00109 OBLIGATES FUNDS FOR THE UTILITY SERVICES CHARGE.
THIS MODIFICATION AUTHORIZED THE SYSTEM OWNER TO COMPLETE CLIN 0113, WPE-23-013, NORTH LOOP TRANSFORMER CONVERSION.
MODIFICATION P00106 ESTABLISHES AND FUNDS CLIN 0111 TO AWARD PROJECT WPE-23-09, SATELLITE AREA RECLOSURES.
MODIFICATION P00107 ESTABLISHES AND FUNDS CLIN 0112 TO AWARD PROJECT WPE-23-011, SUBSTATION B SWITCH.
MODIFICATION P00105 ESTABLISHES AND FUNDS CLIN 0110 TO AWARD A SUPPLEMENTAL REQUIREMENT TO PREVIOUSLY AWARDED PROJECT WPE-22-02, CAMP BUCKNER PHASE 2.
MODIFICATION P00104 ESTABLISHES AND FUNDS CLIN 0109 TO AWARD PROJECT WPE-23-08, ELECTRICAL EMERGENCY ACCESS FOR GENERATORS.
P00103 OBLIGATES FUNDS FOR THE JULY - SEPTEMBER UTILITY SERVICES CHARGE.
P00100 OBLIGATES FUNDS FOR THE JUNE UTILITY SERVICES CHARGE.
P00099 ESTABLISHES AND FUNDS CLIN 0108 FOR PROJECT WPE-23-10.
P00098 OBLIGATES FY21 FUNDS FOR SUBCLIN 0004AD, PREVIOUSLY ESTABLISHED IN MODIFICATION P00065 TO PROVIDE A RETROACTIVE PRICE ADJUSTMENT TO THE CONTRACTOR.
P00095 ENACTS AN ECONOMIC PRICE ADJUSTMENT DUE TO INFLATION AND ADDITIONAL ELECTRICAL UTILITY SYSTEM INVENTORY PLACED IN SERVICE, AND UPDATES THE WAGE DETERMINATIONS.
P00093 ESTABLISHES AND FUNDS CLIN 0106 FOR UPGRADE SERVICE THREE BUILDINGS AT RANGE 2.
P00094 ESTABLISHES AND FUNDS CLIN 0107 FOR REPAIRING A CONDUIT AT BUFFALO SOLDIER FIELD.
P00092 ESTABLISHES AND FUNDS CLIN 0105 FOR UPGRADE SERVICE TO QUARTERS 336-352.
P00091 ESTABLISHES AND FUNDS CLIN 0104 FOR SERVICE TO TROPHY POINT BANDSHELL.
P00089 OBLIGATES FUNDS FOR THE CONTRACT'S FIXED MONTHLY UTILITY SERVICES CHARGE.
Business Details
- UEI
- GZ58N5Y43EK4
- CAGE Code
- 80LS7
- Address
- 6312 S FIDDLERS GREEN CIR STE 200E
GREENWOOD VILLAGE, CO 801114921 - Congressional District
- CO-06
- Phone
- 7203050400
Parent Company
CITY LIGHT & POWER AWP, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov