DATTNER ARCHITECTS DPC
NEW YORK, NEW YORK 100186015
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541310 | $34.83M | 175 |
Contract Awards
50 awards found
47PB0024F0389, MOD PS0007 - HOUSING PROGRAM REVISION & SCHEDULE EXTENSION
THIS MOD PS0006 IS FOR ADDITIONAL STUDIES, NATURAL, GEOMATICS, GEOTECHNICAL AND LANDFILL INVESTIGATION AT COBURN GORE LPOE, MAINE.
THIS MODIFICATION PS0004 RESCISSION OF P100 AND INCORPORATION THE PBS CORE BUILDING STANDARDS.
PROVIDE DESIGN SERVICES FOR THE DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENT PHASE.
EQUITABLE ADJUSTMENT
DESCOPE CLIN 0019 FOR NAZARIO CH SEISMIC MITIGATION AT HATO REY, PR.-PROCUREMENT SUPPORT SERVICES (ALLOWANCE). FUNDS ARE DEOBLIGATED IN THE AMOUNT OF $35,000.00. AS RESULT, THE CONTRACT AMOUNT HAS BEEN DECREASED FROM $2,029,307.00 TO $1,994,307.
MODIFICATION FOR PROCUREMENT SERVICES.
ADDITIONAL CONSTRUCTION PHASE SERVICES.
THIS MODIFICATION IS TO FINALIZE THE DESIGN OPTIONS AND CORE BLDG STANDARDS AT MORTON LPOE, VT
ADDITIONAL A/E SERVICES IN SUPPORT OF THE SSA BI-FOLD & DROP ARM GATES PROJECT AT JOSEPH ADDABBO FEDERAL BUILDING IN JAMAICA, NY.
TO INCORPORATE COURTHOUSE NON-STRUCTURAL SEISMIC MITIGATION SERVICES IN THE AMOUNT OF $273,298.24 FOR THE SEISMIC ANALYSIS AT FEDERICO DEGETAU FB & CLEMENTE RUIZ NAZARIO USCH IN HATO REY, PUERTO RICO.
THIS MODIFICATION ADDS ADDITIONAL SERVICES FOR GEOMATICS AND CONCEPT DEVELOPMENT OF THE NORTH SITE SCHEME IN THE AMOUNT OF $340,880.78. THE PERIOD OF PERFORMANCE END DATE IS ALSO EXTENDED TO 8/31/2029 AT NO COST, AND THE CO IS CHANGED TO JAMES ADAMO.
ADDITIONAL PROGRESS INSPECTIONS
TIME EXTENSION AND EQUITABLE ADJUSTMENT.
PURPOSE OF MODIFICATION IS TO DE-OBLIGATE FUNDS
PROVIDE A/E SERVICES TO PROVIDE CONCEPT, DESIGN DEVELOPMENT, AND CONSTRUCTION DOCUMENTS.
TO INCORPORATE CLIN 0017 FOR NAZARIO COURTHOUSE SEISMIC RETROFIT ALTERNATIVES IDENTIFIED IN THE NAZARIO SEISMIC HAZARD EVALUATION TECH REPORT OF 11/13/2024 IN THE AMOUNT OF $345,238.04 SEISMIC ANALYSIS AT DEGETAU FB & NAZARIO USCH IN HATO REY, PR
MOD 7 ISSUED TO DATTNER ARCHITECTS FOR ELEVATOR SHAFT CONTRACT
PROVIDE FLOOD ASSESSMENT AT NORTON LPOE VT
M&I SERVICES FOR 201 VARICK PRIORITY 2&3 FACADE REPAIRS
MODIFICATION NO. PS0011 IS ISSUED FOR THE CONTRACT FOR A/E SERVICES FOR THE VETERANS BENEFITS ADMINISTRATION CONSOLIDATION PROJECT AT 201 VARICK ST, 4TH FLOOR, NEW YORK, NY FOR ASRS 04-09 AND TO CLOSE OUT THE CONTRACT.
MOD NO. 6 TO DATTNER TMCH, ELEVATOR SHAFT, ADD WORK
MODIFICATION TO INCLUDE ADDITIONAL DESIGN AND CALCULATIONS FOR THE ALTERNATE LOCATION FOR THE FUEL LINE RETURN AT THE JOSEPH P. ADDABBO FEDERAL BUILDING
EXERCISE OPTION 02 CONSTRUCTION PHASE SERVICES
MACERATOR PUMP UPGRADE AND PIPING REPLACEMENT DESIGN
INCORPORATE CLIN 0016 FOR NAZARIO COURTHOUSE SEISMIC ANALYSIS. CONTRACT AMOUNT INCREASED BY $119,777.38 FROM $1,290,993.34 TO $1,410,770.72. FUND INCREASED BY $119,777.38 FROM $1,270,276.55 TO $1,390,053.93. COMP DATE FROM 9/30/2024 TO 12/11/2024.
FULL DESIGN SERVICES FOR BIL COBURN GORE LPOE
EXTENSION OF AE CONSTRUCTION ADMINISTRATION SERVICES.
INSPECTION SERVICES OF ADDITIONAL 10 DORMER MEDALLIONS - DUBERSTEIN LL11 PRIORITY1 FACADE REPAIRS
EXTENSION OF COMPLETION DATE
EXERCISE OF PROCUREMENT PHASE SERVICES.
EQUITABLE ADJUSTMENT FOR EXTENDED M&I SERVICES
TO INCORPORATE CLIN 0015 FOR NAZARIO COURTHOUSE STRUCTURAL STUDY FOR THE SEISMIC ANALYSIS AT DEGETAU FOB IN HATO REY, PR.
STRUCTURAL PROBES AS PART OF THE DESIGN OF THIS PROJECT.
HOLDING CELL ADJUSTMENT
ASR 04 - STUDY EXPLORING FEASIBILITY OF LOCATING NEW LPOE SOUTH OR ALONG ROUTE 27
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE BUDGET ALIGNMENT SERVICES FOR THE NORTON, VT LPOE AS SPECIFIED IN CLIN 0010, "ESTIMATING SERVICES." THE TOTAL AMOUNT OF THIS MODIFICATION IS $57,280.17.
THIS IS AN A/E TASK ORDER AWARD FOR ADDITIONAL STUDY AND MASTER PLANNING AND TRAFFIC DESIGN.
DE-OBLIGATE REMAINING BALANCE TO CLOSE OUT CONTRACT.
THIS IS AN A/E TASK ORDER AWARD FOR ADDITIONAL WETLANDS DELINEATION STUDY AND FEASIBILITY ANALYSIS.
A/E SERVICES TO STUDY HVAC MODERNIZATION EFFORTS AT JAVITS FEDERAL BUILDING, 26 FEDERAL PLAZA, NEW YORK NY 10278
EXTENSION OF AE CONSTRUCTION ADMINISTRATION AND CLOSEOUT & OCCUPANCY SERVICES.
INCORPORATE ADDITIONAL CLINS FOR ADDITIONAL AE AND M&I SERVICES FOR THE PROBATION REDUCTION SPACE PROJECT AT D'AMATO FEDERAL COURTHOUSE IN JAMAICA, NEW YORK.
TO INCORPORATE AE M&I AND AS-BUILT SERVICES FOR THE BI-FOLD & DROP ARM GATE STUDY-DESIGN FOR THE ADDABBO BUILDING IN JAMAICA, NY.
TO INCORPORATE CLIN 0013 FOR DEGETAU NAZARIO USCH TESTING & CLIN 0014 FOR STRUCTURAL HEALTH MONITORING FOR THE SEISMIC ANALYSIS AT FEDERICO DEGETAU COMPLEX IN HATO REY, PR.
TO INCORPORATE CLIN 0011 TO PERFORM A SITE-SPECIFIC PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR $142,365.73, AND CLIN 0012 TO INCORPORATE THE RESULTS INTO PHASE 2 BUILDING EVALUATION REPORT OF THE FEDERICO DEGETAU FB FOR $16,538.28.
47PB0023F0138, A/E DESIGN AT COBURN GORE LPOE IS HEREBY MODIFIED IN ACCORDANCE TO THE ATTACHED SCHEDULE. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT PRICE IS INCREASED BY $189,629.93 FROM $761,350.80 TO $950,980.73.
EXECUTES WITHIN SCOPE LAND SURVEY AND OTHER NO COST POP EXTENSIONS.
MODIFICATION TO INCLUDE AN ELECTRICAL BUILDING LOAD ANALYSIS
MOD TO INCORPORATE CLIN 0010: PERFORM TIER 1 SCREENING SERVICES ON STRUCTURAL CONDITIONS OF THE RAINFOREST CHILD CARE IN THE AMOUNT OF $27,256.59. DEGETAU SEISMIC STUDY IN HATO REY, PR
Business Details
- UEI
- GB25L936WC44
- CAGE Code
- 3JYM5
- Address
- 1385 BROADWAY # 15
NEW YORK, NY 100186015 - Congressional District
- NY-12
- Phone
- 2122472660
Parent Company
DATTNER ARCHITECTS DPC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov