DOWL, LLC
REDMOND, WASHINGTON 980526478
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $3.53M | 69 |
Contract Awards
33 awards found
THIS MODIFICATION IS FOR PRELIMINARY DESIGN (30% PHASE) FOR BRIDGES AND STRUCTURES AND GEOTECHNICAL.
FINAL DESIGN PHASE FOR OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES.
WA ERFO FS GIFPN603 2022-1(1) GIFFORD PINCHOT ERFO REPAIRS 2022 FINAL DESIGN
OREGON FEDERAL LANDS ACCESS PROGRAM SCOPING
A/E GEOTECHNICAL SUBSURFACE INVESTIGATION AND PRELIMINARY ENGINEERING FOR WA PWRO 2010(1) BACKBONE RIDGE VIADUCT #1
A/E DESIGN FOR WA ERFO NPS MORA 2022-2(2) MOUNT RAINIER ERFO REPAIRS PHASE 2
MT DAR MALM 2025(2), ULM BRIDGE REPLACEMENT MOD FOR COMPLETION OF BNSF RAILWAY RAILROAD SAFETY TRAINING, PREPARE SAFETY ACTION PLAN, AND OBTAIN ENCROACHMENT AND ACCESS PERMIT FROM BNSF.
ID BLM IFD 01000(1), CONANT BANK STABILIZATION DEOBLIGATION AND CLOSEOUT.
MASTERWORKS/EEBACS CONVERSION, DESIGN SUPPORT
WFL RESEARCH 2024(2), ANCSA 17B GUIDEBOOK DEVELOPMENT ADDS DATA COLLECTION
MT DAR MALM 2025(2), ULM BRIDGE REPLACEMENT INTERMEDIATE DESIGN PHASES
OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES INTERMEDIATE THROUGH FINAL DESIGN PHASES
MT DAR MALM 2025(2), ULM BRIDGE REPLACEMENT PLANNING TASKS
WFL RESEARCH 2024(2), ANCSA 17B GUIDEBOOK DEVELOPMENT PLANNING TASKS
OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES HYDRAULICS AND PRELIMINARY DESIGN
OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS INTERMEDIATE THROUGH FINAL DESIGN PHASES
OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES 30% PRELIMINARY ENGINEERING FOR MT. HOOD DRAINAGE STRUCTURES
ID FLAP KOOTEN 8450(1), YELLOWSTONE TRAIL ROAD, SEGMENT 1 DELETES THE SECOND MEETING LISTED UNDER V.A.5.B AND EXTENDS THE FIXED COMPLETION DATE
AK FLAP DOT 1(2), TURNAGAIN PASS MASTER PLAN PLANNING STUDY SERVICES
ID BLM IFD 01000(1), CONANT BANK STABILIZATION ENVIRONMENTAL STUDY
AK SEWARD 2019(1), LOWELL POINT ROAD PREPARATION OF SCOPING REPORT FOR SUBJECT PROJECT
OR FS ERFO 2020(1)-14(1), WALLA WALLA SOUTH - UMATILLA REPAIRS 2020, PHASE 1 WETLAND DELINEATION REPORTS
WA FLAP PACIFI 12800(2), 67TH PLACE PUBLIC ENHANCEMENT TO WILLAPA NWR INTERMEDIATE DESIGN PHASES
FLPP OR IP 2022(1), OREGON INTEGRATED PLANNING FLAP NEEDS ASSESSMENT PLANNING TASKS
OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS NEPA TASKS
ID FLAP KOOTEN 8450(1), YELLOWSTONE TRAIL ROAD, SEGMENT 1 INDEPENDENT EXPERT REVIEW AND EVALUATION OF THE GEOTECHNICAL DESIGN RECOMMENDATIONS
WA ERFO FS GIFPN603 2020-1(1), GIFFORD PINCHOT REPAIRS 2020, PHASE 1 ENVIRONMENTAL TASKS
ID BLM IFD 01000(1), CONANT BANK STABILIZATION ENVIRONMENTAL COMPLIANCE SUPPORT TASKS
OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS INTERMEDIATE THROUGH FINAL DESIGN PHASES
AK FLAP DOT 1(2), TURNAGAIN PASS MASTER PLAN PLANNING SERVICES TASKS
ID BLM IFD 01000(1), CONANT BANK STABILIZATION ENVIRONMENTAL COMPLIANCE SERVICES TASKS
ID FLAP IDAHO NF17(1), MT. IDAHO GRADE ROAD REHABILITATION ENVIRONMENTAL ASSESSMENT
OR FS ERFO 2020(1)-14(1), WALLA WALLA SOUTH - UMATILLA REPAIRS 2020, PHASE 1 ADDS INFORMATION REQUIRED BY CONFEDERATED TRIBES OF UMATILLA TO ENSURE PROTECTION OF SPECIES, TO INCLUDE VARIOUS BIOLOGICAL REQUIREMENTS
Business Details
- UEI
- G51EQ3EJ89A4
- CAGE Code
- 3WYU1
- Address
- 8410 154TH AVE NE STE 120
REDMOND, WA 980526478 - Congressional District
- WA-01
- Phone
- 9075622000
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov