E CORP
LAYTON, UTAH 840415871
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $80.53M | 184 |
| 238220 | $33K | 5 |
| 237130 | $-408,004.17 | 4 |
Contract Awards
50 awards found
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
SAN ANTONIO, TX ENVELOPE PROJECT
CHANGE ORDER 6
LCH ATCT ELECTRICAL UPGRADE
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
ADD FUNDING FOR ADDITIONAL STAIRCASE FOR SCAFFOLDING
SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC
MECHANICAL-ELECTRICAL MODERNIZATION AT MSP ATCT (MINNEAPOLIS, MN)
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
MECHANICAL-ELECTRICAL MODERNIZATION AT MSP ATCT (MINNEAPOLIS, MN)
1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS) AND ASSURE IT IS SMOOTHLY OPERATING, CONTROL, AND MODULATE EXISTING 21 VA
CHANGE ORDER #5
ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL & CAVE EXPERIENCE - THE WORK INCLUDES BUT IS NOT LIMITED TO: CONSTRUCTING .75 MILE IMPROVEMENTS ON EXISTING EL CALDERON TRAIL AND CONSTRUCTION OF A NEW TRAIL TO THE EXISTING VAULT RESTROOM FROM THE PARKING
MECHANICAL-ELECTRICAL MODERNIZATION AT MSP ATCT (MINNEAPOLIS, MN)
MECHANICAL-ELECTRICAL MODERNIZATION AT MSP ATCT (MINNEAPOLIS, MN)
RVS: REPLACE ATCT ELECTRICAL SYSTEM, REPLACE DOMESTIC AND SEWER PIPE, AND RESEAL ATCT TO PREVENT WATER INFILTRATION. LINE 1: 803971: REPLACE ELECTRICAL SYSTEM. LINE 2: 909316: REPLACE DOMESTIC & SEWER PIPE PLUMBING THROUGHOUT BUILDING. LI
A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER (
CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS.
DE-OBLIGATE EXCESS FUNDS, RELEASE OF CLAIMS, AND CLOSEOUT
AIRPORT TRAFFIC CONTROL TOWER AND CAB MODERNIZATION MINNEAPOLIS-SAINT PAUL INTERNATIONAL AIRPORT (MSP), MINNEAPOLIS, MN BIPARTISAN INFRASTRUCTURE LAW FUNDING
1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS) AND ASSURE IT IS SMOOTHLY OPERATING, CONTROL, AND MODULATE EXISTING 21 VA
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO, INSTALL A NEW CABLE TRAY SYSTEM AND CONDUITS FOR FENS COMMUNICATION, INSTALL
REA 1
PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY RENOVATE ENTIRE MENS AND WOMENS MAIN FACILITY RESTROOMS AT ZOA, OAKLAND, CA. T
CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS.
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO, INSTALL A NEW CABLE TRAY SYSTEM AND CONDUITS FOR FENS COMMUNICATION, INSTALL
AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA
CHANGE ORDER 4
PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY RENOVATE ENTIRE MENS AND WOMENS MAIN FACILITY RESTROOMS AT ZOA, OAKLAND, CA. T
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION AND SUPERVISION TO REFURBISH AIR HANDLING UNITS AND REPLACE HUMIDIFIERS FOR THE DSR AREA AT THE OAKLAND (ZOA) AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) IN FREMONT, CA.
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
DESIGN BUILD COMBAT RESCUE HELICOPTER (CRH) SIMULATOR
A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER (
DEOB FUNDS FOR SURGE PROTECTION DEVICES
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO, INSTALL A NEW CABLE TRAY SYSTEM AND CONDUITS FOR FENS COMMUNICATION, INSTALL
1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS) AND ASSURE IT IS SMOOTHLY OPERATING, CONTROL, AND MODULATE EXISTING 21 VA
AIRPORT TRAFFIC CONTROL TOWER AND CAB MODERNIZATION MINNEAPOLIS-SAINT PAUL INTERNATIONAL AIRPORT (MSP), MINNEAPOLIS, MN BIPARTISAN INFRASTRUCTURE LAW FUNDING
AHU-700 COOLING COOL CHANGE IN SCOPE
PCO-5 HVAC ACTUATORS & VFD REPLACEMENT & PCO-6 HVAC VFD MONITORING
A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER (
CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS.
LCH ATCT ELECTRICAL UPGRADE
REMOVE AND REPLACE ALL EXTERIOR CAULKING OF BASE BUILDING & TOWER OF ATCT. REPAIR AND INSTALL METAL FRAMING AND DRYWALL FROM THE FIRST LEVEL TO TENTH LEVEL OF ATCT.
THE CONTRACTOR SHALL ATTEND A GOVT-LED KICK OFF MEETING FOR THE HOLLOMAN MACC. THIS TASK ORDER SATISFIES THE CONTRACT MINIMUM AWARD AMOUNT.
EO14042 THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW VISITOR CONTACT STATION AS A CENTRAL POINT OF SERVICES FOR PARK VISITORS.
NR MABO MATOC - MIN GUARANTEE - E-CORP
ADD FUNDING TO CHANGE COATING PRODUCT FOR CONCRETE AND METAL SURFACES.
ADD FUNDING TO CHANGE COATING PRODUCT FOR CONCRETE AND METAL SURFACES.
PCO-4 ENTERPRISE SERVER REPLACEMENT
Business Details
- UEI
- CWVJEB454CR7
- CAGE Code
- 3F3Q3
- Address
- 1598 N HILL FIELD RD STE B
STE B
LAYTON, UT 840415871 - Congressional District
- UT-01
- Phone
- 8017710933
Parent Company
E CORP
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov