ECLIPSE COMPANIES, LLC
CHAGRIN FALLS, OHIO 440239213
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $62.55M | 105 |
| 237990 | $1.66M | 5 |
Contract Awards
50 awards found
PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL
AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLAC
NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACT
PROJECT: PA ERFO FW CHV 2020-1(1) CONTRACT MODIFICATION #1 1. TO DECREASE CONTRACT AMOUNT BY $37,071.91 2. TO EXTEND CONTRACT BY 51 CALENDAR DAY 3. TO ADDRESS THE ADDITION OF ASPHALT CONCRETE PAVEMENT IN SCHEDULE B. 4. TO ADDRESS OVERRUNS AND UND
KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, A
NC ERFO NP-BLRI 2024-1(4) 693C7320D000016/693C7325F00037N CM #3 DECREASE CONTRACT AMOUNT BY -$0.52 EXTEND CONTRACT TIME BY 15 CALENDAR DAYS
KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN
MS NP NATR 3P28 693C7320D000007/693C7325F00006N CM #1 DECREASE CONTRACT AMOUNT BY $5,831.61 EXTEND CONTRACT TIME BY 54 CALENDAR DAYS
THE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE B
TN ERFO FS CHRKE804 2020-1(1) 693C7320D000007/693C7325F00044N CM #1 INCREASE CONTRACT AMOUNT BY $58,327.50 NO CHANGE TO CONTRACT TIME
PROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULD
LA NP JELA BR 7530-001P 693C7320D000007/693C7325F00005N CM #2 DECREASE CONTRACT AMOUNT BY $1,950.00 NO CHANGE TO CONTRACT TIME FINALIZE THE EXISTING QUANTITIES
NC ERFO NP-BLRI 2024-1(4) 693C7320D000016/693C7325F00037N CM #2 INCREASE CONTRACT AMOUNT BY $288,137.60 EXTEND CONTRACT TIME BY 40 CALENDAR DAYS
PROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE REHABILITATION OF SIX SITES, INVOLVING SLOPE REPAIRS, DEEP PATCHING, RO
NC ERFO NP-BLRI 2024-1(4) 693C7320D000016/693C7325F00037N CM #1 INCREASE CONTRACT AMOUNT BY $499,997.45 NO CHANGE TO CONTRACT TIME
NC NP-BLRI 2F12 693C7320D000016/693C7324F00004N CM #3 DECREASE CONTRACT AMOUNT BY $11,325.92 NO CHANGE TO CONTRACT TIME FINALIZE EXISTING QUANTITIES
LA NP JELA 7530-001P CM #1 INCREASE CONTRACT AMOUNT BY $8,600.00 NO CHANGE TO CONTRACT TIME
PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.
PROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPA
PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN
PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND
PROJECT ME NP ACAD BRG(1): THE PURPOSE OF THIS MODIFICATION IS TO DECREASE CONTRACT AMOUNT BY $313,960.11.
PROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK.
PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR
MS NP NATR BMS FY23(1) 693C7320D000007/693C7324F00062N CM #2 INCREASE CONTRACT AMOUNT BY $100,000.00 NO CHANGE TO CONTRACT TIME
MDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES.
TX FTFW SAMA 10(1)_2 693C7320D000023/693C7323F00043N CM #3 INCREASE CONTRACT AMOUNT BY $943.55 EXTEND CONTRACT TIME BY 97 CALENDAR DAYS FINALIZE EXISTING QUANTITIES
NP-NATR 3O22 693C7320D000007/693C7323F00026N CM #5 DECREASE CONTRACT AMOUNT BY $13,597.30 NO CHANGE TO CONTRACT TIME FINALIZE EXISTING QUANTITIES
PROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING. THE WORK INCLUDES GRADING, DRAINAGE, AGGREGATE SURFACE COURSE, CONCRET
PROJECT NP NATR 3N16, 3H25, ETC, TO INITIALLY AUTHORIZE GAOA FUNDS FOR DESIGN-BUILD SOLICITATION AND RELEASE OF THE /RFQ/ RFP
IDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-NORTH ZONE
PROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP
IDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-WEST ZONE
NP-CHAT 102(1), 906(1), 907(1), 908(1) 693C7320D000016/693C7323F00012N CM #3 INCREASE CONTRACT AMOUNT BY $146,175.00 EXTEND CONTRACT TIME BY 87 CALENDAR DAYS
FW-GRCO TRL(1) 693C7320D000007/693C7323F00031N CM #2 DECREASE CONTRACT AMOUNT BY $22,364.30 NO CHANGE TO CONTRACT TIME FINALIZE THE EXISTING QUANTITIES
NC NP BLRI 2F12 693C7320D000016/693C7324F00004N CM #2 INCREASE CONTRACT AMOUNT BY $91,413.00 EXTEND CONTRACT TIME BY 5 CALENDAR DAYS
PROJECT ME NP ACAD BRG(1): THE PURPOSE OF THIS MODIFICATION IS TO: 1. EXERCISE SCHEDULE B (GOVERNMENT OPTION 1) AND FUND CLIN 10101 IN THE AMOUNT OF $1,116,357.45. 2. CONTRACT AMOUNT IS INCREASED FROM $1,133,642.05 BY $1,116,357.45 TO $2,249,999.
NP-NATR 3O22 693C7320D000007/693C7323F00026N CM #4 INCREASE CONTRACT AMOUNT BY $27,000.00 NO CHANGE TO CONTRACT TIME
NP-CHAT 102(1), 906(1), 907(1), 908(1) 693C7320D000016/693C7323F00012N CM #2 DECREASE CONTRACT AMOUNT BY $94.40 EXTEND CONTRACT TIME BY 45 CALENDAR DAYS
TX FTFW SAMA 10(1)_2 693C7220D000023/693C7323F00043N CM #2 INCREASE CONTRACT AMOUNT BY $10,863.32 EXTEND CONTRACT TIME BY 60 CALENDAR DAYS
PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION RE
PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WO
NP-GREE 11(1) 693C7319C000006 CM #15 INCREASE CONTRACT AMOUNT BY $25,434.51 NO CHANGE TO CONTRACT TIME FINALIZE EXISTING QUANTITIES THE TOTAL AMOUNT OF THE CONTRACT IS HEREBY INCREASED BY $25,434.51 FROM $6,456,963.40 TO $6,482,397.91.
NP-NATR 3O22 693C7320D000007/693C7323F00026N CM #2 INCREASE CONTRACT AMOUNT BY $985,000.00 EXTEND CONTRACT TIME BY 30 CALENDAR DAYS
PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.
PROJECT FW-GRCO TRL(1): THE PROJECT CONSISTS OF REPLACING THE DAMAGED BOARDWALK ON HEADQUARTERS BOARDWALK TRAIL. THE WORK INCLUDES DESIGN SERVICES, TIMBER PILE AND TIMBER BOARDWALK CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.
PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA
IN NP INDU 0945(2) 693C7320D000023/693C7322F00067N CM #2 DECREASE CONTRACT AMOUNT BY $2,300.50 NO CHANGE TO CONTRACT TIME FINALIZE EXISTING QUANTITIES
THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.
MO ERFO FS 2017-1(1) 693C7320D000023/693C7320F000077 CM #5 DECREASE CONTRACT AMOUNT BY $2,993.54 INCREASE CONTRACT TIME BY 278 CALENDAR DAYS
Business Details
- UEI
- RMCMTCKHMFH9
- CAGE Code
- 7UMN9
- Address
- 11554 WASHINGTON ST
CHAGRIN FALLS, OH 440239213 - Congressional District
- OH-14
- Phone
- 4405433493
Parent Company
ECLIPSE COMPANIES, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov