ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
DBA: ERRG
MARTINEZ, CALIFORNIA 945532228
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 562910 | $44.29M | 233 |
| 541620 | $98K | 9 |
| 237990 | $0 | 1 |
Contract Awards
50 awards found
TEST AND REMOVE LEAD-BASED PAINT AND PERFORM SIDING AND TRIM REPAIR ON BUILDINGS AT ZIGZAG RANGER STATION
STABILIZATION AND ONSITE CONTAINMENT OF HAZARDOUS WASTE DEBRIS AT FOREST SERVICE OWNED AND PRIVATELY OWNED STRUCTURES BURNED DURING THE EATON FIRE.
X:NOGRN, HAZARDOUS MATERIALS CLEANING AND SOIL SAMPLING SERVICES AT BLDG. T1111, FORT CRONKHITE, SAUSALITO, CA.
CONDUCT A REMOVAL ACTION UNDER CERCLA OF CONTAMINATED SOIL AND SEDIMENT AT CANEEL BAY RESORT IN VIRGIN ISLANDS NATIONAL PARK. MOD 2 ORDERS ADDITIONAL QUANTITIES OF NON-RCRA HAZARDOUS SOIL REMOVAL AND BACKFILL.
NON-TIME CRITICAL REMOVAL ACTION UNDER CERCLA AT EL CAPITAN FORMER WASTE DUMP IN YOSEMITE NP. MOD 9 ADDS RESOURCE PROTECTION REQUIREMENTS AND EXERCISES MORE OF OPTION B, CONFIRMATION SAMPLES.
MODIFICATION FOR REQUEST FOR EQUITABLE ADJUSTMENT FOR REA FOR NTCRA AT RDA, INCLUDING POP EXTENSION. THE PURPOSE OF THIS MODIFICATION IS TO FUND A REQUEST FOR EQUITABLE ADJUSTMENT, AND EXTEND THE COMPLETION DATE OF THE TASK ORDER.
LOS PADRES NF, CA. THE PURPOSE OF MODIFICATION P00005 PROVIDES FUNDING FOR SOIL SAMPLING (X-RAY FLUORESCENCE SURVEY) TO DETERMINE VERTICAL EXTENT OF LEAD CONTAMINATED SOIL AT MERLE RANCH. MODIFICATION OF EXISTING CONTRACT 12970223D0007/127EAT24F0019
REIMBURSEMENT REQUEST.
127EAV23D0005/127EAV25F0021 MINERAL CREEK MINES POTENTIALLY RESPONSIBLE PARTY (PRP) GILA NATIONAL FOREST GLENWOOD RANGER DISTRICT, NEW MEXICO
B763 ASBESTOS REMOVAL
K503 RIFLE RANGE AND TACTICAL LANDING ZONE PARROT OPERATIONAL RANGE CLEARANCE FOR MARINE CORPS BASE CAMP LEJEUNE NORTH CAROLINA
REQUEST FOR EQUITABLE ADJUSTMENT DUE TO IRRIGATION FLOODING
K503 RIFLE RANGE AND TACTICAL LANDING ZONE PARROT OPERATIONAL RANGE CLEARANCE FOR MARINE CORPS BASE CAMP LEJEUNE NORTH CAROLINA
MCRD PARRIS ISLAND INCHON KD-RR BERM CLEARANCE AND RESTORATION
PROJECTILE RECLAMATION AND MAINTENANCE OF EDSON PISTOL AND RIFLE RANGES LOCATED ON MARINE CORPS BASE CAMP PENDLETON OCEANSIDE, CALIFORNIA
COMPLETION OF PHASE 1 (MODIFIED) AND PHASE 2 WORK AND ONSITE CONTAINMENT OF DEBRIS AT FOREST SERVICE OWNED STRUCTURES BURNED DURING THE AIRPORT FIRE.
ADD CLIN 0006 - DECOMMISSIONING
NACIMIENTO MINE GROUNDWATER REMEDIATION
ASPHALT PATCHING, HAZARDOUS WASTE DISPOS
MODIFICATION TO FUND REQUEST FOR EQUITABLE ADJUSTMENT. X021 OPERATION, MAINTENANCE, MONITORING, AND OPTIMIZATION OF THE
NON-TIME CRITICAL REMOVAL ACTION UNDER CERCLA AT EL CAPITAN FORMER WASTE DUMP IN YOSEMITE NP. MOD 7 ADDS A NEW WASTE CATEGORY, NORM NON-HAZARDOUS WASTE; ADJUSTS QUANTITIES; AND ADDS "HOT SPOT" AND CONFIRMATION SAMPLES (OPTION B).
MCAS MIRAMAR RANGE RECLAMATION
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) WOMEN OWNED SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC)
THE PRIMARY ACTIVITIES PLANNED UNDER THIS TASK ORDER ARE FOR IMPLEMENTATION OF THE REDESIGN OF THE WESTERN COVER SYSTEM EDGE AT MEYERS LANDFILL SITE OPERABLE UNIT (OU)-1 (SITE) ON THE LAKE TAHOE BASIN MANAGEMENT UNIT (LTBMU) IN EL DORADO COUNTY, CALI
PENTLAND MINE REMEDIATION
LAND FARMING OPERATIONS AT THE U.S. ARMY GARRISON - KWAJALEIN ATOLL (USAG-KA) KWAJALEIN AND ROI NAMUR
THE PHASE I & II HAZARDOUS WASTE REMOVAL AND DISPOSAL IS A TASK ORDER UNDER THE R5 NON-CERCLA ENVIRONMENTAL SITE INVESTIGATION AND CLEAN-UP IDIQ, ACTIVITY II - POST NATURAL DISASTER HAZARDOUS MATERIAL AND DEBRIS CLEAN-UP AND REMOVAL IDIQ (MAS: 12
NON-TIME CRITICAL REMOVAL ACTION UNDER CERCLA AT EL CAPITAN FORMER WASTE DUMP IN YOSEMITE NP. MOD 5 ADDS BACKGROUND RADIOLOGICAL SURVEY FOR THE SITE AND ROUND-TRIP TRANSPORTATION FOR TRUCKLOADS REJECTED BY LANDFILL DUE TO RADIATION DETECTION.
CONDUCT A REMOVAL ACTION UNDER CERCLA OF CONTAMINATED SOIL AND SEDIMENT AT CANEEL BAY RESORT IN VIRGIN ISLANDS NATIONAL PARK. OBLIGATION USES ESTIMATED QUANTITIES OF UNIT-PRICED ITEMS; TOTAL VALUE INCLUDES LIMITED ADDITIONAL QUANTITIES.
COMPLETION OF PHASE 1 (MODIFIED) AND PHASE 2 WORK AT FOREST SERVICE OWNED STRUCTURES DAMAGED OR DESTROYED IN THE DOLAN FIRE. PHASE 1 EFFORTS WILL BE BROKEN INTO TWO PARTS. PHASE 1 PART A WILL CONSIST OF THE REMOVAL OF HOUSEHOLD HAZARDOUS WASTE (HHW),
AMEND BIG BLUE OPERABLE UNITS 1 AND 2 EE/CA TO INCLUDE 3 PRIMARY TASKS: EVALUATION AND ASSESSMENT OF THE RECENT FLOODING EVENTS ON THE TAILINGS IN OU1 AND OU2; AMEND OU1 AND OU2 TO IDENTIFY VALID REPOSITORY LOCATION FOR SOILS EXCAVATED IN OU1 AND OU
PREPARATION OF CERCLA ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) FOR THE MAMMOTH MILL SITE ON THE INYO NF. TASK ORDER TO BE ISSUED UNDER ACTIVITY II TASK 2 OF THE REGION 5 CERCLA ENVIRONMENTAL RESPONSE MULTIPLE AWARD IDIQ CONTRACT (# 12970223D0018
REMOVAL AND DISPOSAL OF THE STRUCTURE RELATED HAZARDOUS WASTE AND DEBRIS GENERATED AS A RESULT OF THE FAIRVIEW WILDFIRE. PROJECT TO BE COMPLETED IN ACCORDANCE WITH PHASE 2 (REMOVAL AND DISPOSAL OF DEBRIS, ASH, AND CONTAMINATED SOIL) FOLLOWING THE WIL
NON-TIME CRITICAL REMOVAL ACTION UNDER CERCLA AT EL CAPITAN FORMER WASTE DUMP IN YOSEMITE NP. MOD 4 ADJUSTS ESTIMATED QUANTITIES, IMPLEMENTS STOCKPILE WASTE CHARACTERIZATION, AND EXTENDS REMOVAL ACTION INTO SUMMER 2025.
NEW LIGHT AND COPPER GLANCE ADIT CLOSURES, HAZMAT SERVICES BPA FOR REGION 6 & 10 (AP# 689175)
ORC WTBN RANGE 2 MCBQ
ADDING ARCHEOLOGY SERVICES CLIN 0009 CULTURAL RESOURCE PLAN, 0010 CULTURAL RESOURCE MONITORING, 0011 CULTURAL RESOURCE FIELDWORK REPORT (CRFWR), AND DESCOPES THE SITE SPECIFY FINAL REPORT AND ADDS A REMEDIAL ACTION COMPLETION REPORT.
OPERATION AND MAINTENANCE OF GROUNDWATER REMEDIAL ACTIONS AT
NON-TIME CRITICAL REMOVAL ACTION UNDER CERCLA AT EL CAPITAN FORMER WASTE DUMP IN YOSEMITE NP. MOD 3 ADDS TESTING OF IMPORTED BACKFILL TO IMPLEMENT NPS' CLEAN FILL PROTOCOL.
NACIMIENTO MINE REMEDIAL ACTION
X008 VFA 113 F-18 TRONA MISHAP RESPONSE
EXERCISE OPTIONAL SUBTASK 2.7 (CLIN 0207) AND TASK 5.3 (CLIN 0501)
THIS PROJECT IS A COMPETITIVE TASK ORDER UNDER THE REGION 5 (R5) ENVIRONMENTAL SITE INVESTIGATION & CLEANUP INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT. WORK INCLUDES ASSESSMENT AND REMOVAL OF HAZARDOUS WASTE AND EASILY IDENTIFIABLE
CONDUCT A HAZARDOUS MATERIALS SURVEY AND IDENTIFY ALL HAZARDOUS MATERIALS THAT ARE REQUIRED TO BE REMOVED PRIOR TO DEMOLITION OF THE STRUCTURES LOCATED AT THE LITTLE RECREATION AREA SITE. PREPARE A PRE-DEMOLITION HAZMAT SURVEY REPORT THAT DOCUMENT T
DATA GAP ANALYSIS - MODIFICATION TO DESCOPE ELEMENTS THAT ARE NO LONGER REQUIRED.
INSTITUTIONAL CONTROLS & EDUCATION OUTREACH FOR WAIKALOA MANEUVER AREA (WMA), FUDS
CONDUCT SMALL ARMS PROJECTILE REMOVAL AT R-103 AND 21
PHASE I ESA - UPPER VERDE YAVAPAI
X019 RANGE SUSTAINMENT SERVICES - NAF EL CENTRO FY24/FY25 (CS IS
Business Details
- UEI
- M4WJHLJG6QB9
- CAGE Code
- 1P9Q7
- Address
- 4585 PACHECO BLVD STE 200
MARTINEZ, CA 945532228 - Congressional District
- CA-10
- Phone
- 9259690750
Parent Company
ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov