EVERSON CONSTRUCTION GROUP, LLC
GAINESVILLE, FLORIDA 326080219
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $6.06M | 21 |
| 238220 | $2.76M | 5 |
| 221310 | $476K | 3 |
| 238210 | $276K | 2 |
| 236210 | $262K | 2 |
Contract Awards
24 awards found
THIS IS A CONSTRUCTION PROJECT INTENDED TO PROVIDE A DESIGN AND CONSTRUCTION TO COMPLETELY REMOVE AND REPLACE THE AIRFIELD ROTATING BEACON AT B145.
THE BUILDING 14 BOILER CONTROL SYSTEM IS OVER 20 YEARS OLD AND APPROACHING END OF LIFE OF SOME OF THE COMPONENTS, HARDWARE AND SOFTWARE. TO ENSURE CONTINUITY OF OPERATION AND TO ENSURE RELIABILITY TO SUPPLY STEAM CAMPUS-WIDE THE BUILDING 14 BOILER CO
THIS IS A CONSTRUCTION PROJECT INTENDED TO REPLACE APPROXIMATELY 40 LINEAR FEET OF 6 INCH ASBESTOS CEMENT PIPE AT 867 ENGLAND STREET AND REPLACE WITH 6 INCH PVC (SCHEDULE 80) LINE.
ENGLAND STREET PIPING
THE EXISTING BUILDING 18 STEAM CONDENSATE PUMPS AND THE CONTROL/STARTER PANEL FOR THE CONDENSATE PUMPS ARE A SOURCE OF CONTINUOUS MAINTENANCE IN BUILDING 18. THE PUMP SEALS FREQUENTLY FAIL BECAUSE THEY DO NOT PERFORM WELL AT HIGH TEMPERATURES. THE PU
THE BUILDING 14 BOILER CONTROL SYSTEM IS OVER 20 YEARS OLD AND APPROACHING END OF LIFE OF SOME OF THE COMPONENTS, HARDWARE AND SOFTWARE. TO ENSURE CONTINUITY OF OPERATION AND TO ENSURE RELIABILITY TO SUPPLY STEAM CAMPUS-WIDE THE BUILDING 14 BOILER CO
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING DOMESTIC WATER BOOSTER PUMP SYSTEM DURING A COORDINATED AFTER-HOURS OUTAGE TO REDUCE THE IMPACT TO ONGOING OPERATIONS IN BUILDING 18. THE NEW TRI-PLEX SYSTEM WILL ALLOW FOR VARIABLE SPEED PUMP TO
X002 DEMOLISH B118 BOOM SHED AND 37T FUEL TANK AT DFSP HECKSCHER
H1000 PAINT HANGAR FLOOR SEGMENT 3
X001 MPO FACILITY 262 GENERATOR
FCC COLEMAN - REPLACE COOLING TOWERS - 24Z3AY4
REPLACE LIGHTS
2ND BN PT FIELD LIGHTING
FCC COLEMAN - REPLACE COOLING TOWERS - 24Z3AY4
ANFPN-68A PAR INSTALLATION
ROUND 2 OF UPGRADING WATER FOUNTAINS TO REFILLABLE WATER BOTTLE STATIONS.
B103 & B272 DESIGN AND CONSTRUCT WATER WELLS, FEDERAL LAW ENFORCEMENT TRAINING CENTER, GLYNCO GA
H1000 PAINT SEQMENT #3 VP-62
2ND BN PT FIELD LIGHTING
MODIFY BLDG.2148 HAZWASTE 60-DAY STORAGE, NAVAL STATION MAYPORT, FL
LIGHTING
REPLEACE BARRACKS STAIRWELLS
B221: REPLACEMENT OF LOW TEMPERATURE HOT WATER SUPPLY AND RETURN PIPING, VALVES, CIRCUIT SETTERS, PRESSURE/TEMPERATURE TEST PORTS AND FITTINGS.
THE PURPOSE OF THIS MODIFICATION IS FOR IN-SCOPE CHANGES AND TO EXTEND THE PERIOD OF PERFORMANCE OF THE CONTRACT. CONTRACT LINE ITEM NUMBER (CLIN) 00020 IS ADDED TO THE CONTRACT FOR FUNDING PURPOSES IN THE AMOUNT OF $12,032.00. THE TOTAL COST O
Business Details
- UEI
- MNRUA9KKC5A3
- CAGE Code
- 89DT9
- Address
- 4440 SW ARCHER RD APT 2324
GAINESVILLE, FL 326080219 - Congressional District
- FL-05
- Phone
- 3522149905
Parent Company
EVERSON CONSTRUCTION GROUP, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov