G E A BUILDERS INC.
SAN DIEGO, CALIFORNIA 921141426
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $10.84M | 117 |
| 238330 | $241K | 3 |
| 561210 | $158K | 6 |
| 238140 | $111K | 1 |
| 238320 | $92K | 2 |
| 238210 | $80K | 8 |
| 238990 | $48K | 1 |
| 236210 | $35K | 2 |
| 238290 | $28K | 1 |
Contract Awards
50 awards found
THE US ATTORNEY'S OFFICE NEEDS TO HAVE ARMORED CABLES INSTALLED AT THE SCHWARTZ FEDERAL BUILDING AT 880 FRONT ST, SAN DIEGO, CA 92101.
THIS CONTRACT IS FOR THE FABRICATION AND INSTALLATION OF A CORRIDOR METAL DOOR WITH A LOCK AT THE U.S. CUSTOMS AND BORDER PROTECTION MARIPOSA PORT OF ENTRY IN NOGALES, AZ.
REMOVE VCT/REPLACE WITH POLISHED CONCRETE, AND REMOVE CARPET/REPLACE WITH CARPET SQUARES AND POLISHED CONCRETE, MARCH ARB, HANGAR 373, CA.
INCREASE THE CONTRACT BY $3,662.67 FROM $199,249.30 TO $202,911.97 AND EXTEND POP MAKING THE NEW COMPLETION DATE 11/24/2025, DUE TO A CHANGE IN THE SCOPE OF WORK. ALL WORK TO TAKE PLACE AT 2420 W. VISTA WAY, SAN DIEGO, CA
INSTALL MODULAR BUILDING AT USCG SECTOR SAN DIEGO
TO FURNISH AND REPLACE FIVE BALLISTIC RESISTANT GLASS WINDOWS AT THE CARTER KEEP US COURTHOUSE (333 W BROADWAY, SAN DIEGO, CA 92101). REFER TO PROJECT SCOPE OF WORK FOR FULL DETAILS AND REQUIREMENTS
REPLACE FLOORING LOCATED AT THE CHULA VISTA, CA BORDER PATROL STATION
PCD-901-M&R-FY25-026 RIVERSIDE NATIONAL CEMETERY COLUMBARIUM A REPAIR
THIS PROJECT IS FOR THE ROOF ASSESSMENT OF THE SAN YSIDRO LPOE
DELLUMS JANITOR CLOSET RESTORATION, DELLUMS FEDERAL BUILDING, 1301 CLAY STREET, OAKLAND, CA
THIS MODIFICATION DESCOPES THE CARD READER AND INSTALLATION FROM THE ROOM CONVERSION PROJECT LOCATED AT 610 WEST ASH STREET, SAN DIEGO, CA 92101.
THE PURPOSE OF MODIFICATION PS0001 IS TO INCREASE THE CONTRACT BY $1,905.75 FROM $197,343.55 TO $199,249.30 AND EXTEND THE CONTRACT OUT 14 DAYS. ALL WORK TO TAKE PLACE AT 2420 VISTA WAY, OCEANSIDE, CA 92054
47PK1725C0012 SAN DIEGO COURTHOUSE PERIMETER HARDENING 333 W BROADWAY SAN DIEGO CA 92101
CBP 8TH FLOOR RENOVATION - 610 W. ASH STREET, 8TH FLOOR, SAN DIEGO, CA 92101
CONTRACTOR TO PROVIDE WOOD TOUCHUPS THROUGHOUT CHAMBER SUITES IN ACCORDANCE WITH THE STATEMENT OF WORK AT THE SCHWARTZ COURTHOUSE, 880 FRONT STREET, SAN DIEGO, CA 92101.
THIS MODIFICATION IS TO CHANGE THE TYPE OF FIBER OPTIC CABLING BEING USED FOR THIS PROJECT LOCATED AT THE SCHWARTZ COURTHOUSE, 880 FRONT STREET, SAN DIEGO, CA 92101.
INSTALLATION OF VARIABLE SPEED SYSTEM TO UPGRADE EXISTING FAN SYSTEM, SDO CHILLERS REPLACEMENT, AT THE SANDRA DAY O'CONNOR FEDERAL BUILDING AND US COURTHOUSE, 401 W. WASHINGTON ST., PHOENIX, AZ 85003
THE WOOD WORK IN THE USDC SECURE CORRIDORS OF THE 2ND, 3RD, 4TH, AND 5TH FLOORS NEED TO BE REPAIRED INSIDE THE SCHWARTZ COURTHOUSE LOCATED AT 880 FRONT STREET, SAN DIEGO, CA 92101.
RENOVATE THE 12TH FLOOR SPACE LOCATED AT 610 WEST ASH STREET SAN DIEGO, CA 92101 FOR RETURN TO OFFICE EFFORTS.
CONTRACTOR TO PROVIDE ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, & SUPERVISION TO PERFORM UPGRADE ACCESS CONTROL, CAMERAS, AND INTRUDER DETECTION FOR ICE OCEANSIDE, LOCATED AT 2420 W. VISTA WAY, SAN DIEGO, CA.
CA0281ZZ USCIS ASYLUM POST OCCUPANCY PROJECT
RENOVATING THE 12TH FLOOR FOR OCC CBP AT 610 WEST ASH STREET SAN DIEGO, CA 92101.
INSTALLATION OF NEW FIBER OPTIC CABLING FOR THE COURTS AT THE SCHWARTZ FOB FACILITY LOCATED AT 880 FRONT STREET, SAN DIEGO, CA 92101.
THIS MODIFICATION IS TO CHANGE THE CONFIGURATION OF THE DATA DROPS BASED ON A REVISED DRAWING FROM THE CUSTOMER AGENCY FOR THEIR LEASED OFFICE SPACE IN SAN DIEGO, CA.
MODIFICATION TO ADD $6,264.00 PER AGENCY REQUEST, THE WORK NEEDS TO BE DONE AFTERHOURS/WEEKENDS FOR THE IRS LVT FLOORING, FRESNO, CA
THE GOAL OF THIS PROJECT IS TO INSTALL NEW MULTIMEDIA EQUIPMENT IN THE PACIFIC CONFERENCE ROOM (SUITE 7-5290) DUE TO NO AV EQUIPMENT CURRENTLY EXISTING IN THE CONFERENCE ROOM AT 450 GOLDEN GATE AVE, SF, CA 94102. SEE SOW FOR FURTHER DETAILS.
THIS MODIFICATION IS TO ADD THE INSTALLATION OF ANTI-GRAFFITI FILM TO THE WINDOWS AT THE SCHWARTZ COURTHOUSE IN SAN DIEGO, CA.
THE LETTERING INSTALLATION FROM LINE ITEM 0003: WAYFINDING SIGNAGE AT 50 UNP, SAN FRANCISCO, CA HAS BEEN DESCOPED.
REPLACE A SECTION OF SIDEWALK THAT HAS BECOME A SAFETY HAZARD AFTER BEING DAMAGED BY TREE ROOTS AT THE PECKHAM FEDERAL BUILDING, 280 S. 1ST ST., SAN JOSE, CA 95113-3002
REFRESH USDC STOREFRONT SPACE WITH PAINT AND CARPETING LOCATED AT THE SCHWARTZ COURTHOUSE, 880 FRONT STREET, SAN DIEGO, CA 92101.
TO REPAINT APPROXIMATELY 5,000 USEABLE SQUARE FEET (ALL COMMON AREAS AND ASSOCIATED TRIMS, LOBBY, RECEPTION, 2 INTERVIEW ROOMS, AND OPTIONAL STORAGE ROOM CA0309ZZ, FED BLDG & CTHOUSE, FRESNO, CA 93721-0000
CA6921ZZ IRS - SAN MARCOS CITY HALL - URGENT DOOR REPAIRS
USCIS ASYLUM POST OCCUPANCY PROJECT AT THE RONALD V DELLUMS FEDERAL BUILDING IN OAKLAND, CA -CA0281ZZ-
CONTRACTOR PROVIDED A MATERIAL RECYCLING REDUCTION IN THE AMOUNT OF $210.09 FOR CLIN 0002 ON INVOICE 01 (9/2023) WHICH DECREASED THE CONTRACT TO $46,913.91.
ANTI-SLIP FLOORING APPLICATION FOR 4200 SQ FT WOOD MILL FACILITY
IRS REMOVAL OF LVT FLOORING LOCATED AT 855 M STREET, FRESNO, CA
CONSTRUCTION CONTRACT TO INSTALL NEW CANOPY AT THE SECURITY BOOTH AT SAN LUIS II LPOE, SAN LUIS, AZ
CBP IS REQUESTING TO CONVERT A STORAGE ROOM AT 610 ASH STREET, SUITE 1005, ROOM 108, SAN DIEGO, CA 92101 INTO A SECURE MEETING ROOM.
CONSOLIDATION EFFORT AT 50 UNP, SF, CA. MOD TO ADJUST SIGNAGE LINE ITEM AND EXTEND COMPLETION DATE.
DB SDO CHILLERS REPLACEMENT AT THE SANDRA DAY O'CONNOR US COURTHOUSE & FEDERAL BUILDING, 401 W WASHINGTON ST., PHOENIX, AZ 85003
MODIFICATION FOR ADDITIONAL WINDOW FOR PROBATION PROJECT AT THE RONALD V DELLUMS FEDERAL BUILDING IN OAKLAND, CA -CA0281ZZ-
50 UNP CONSOLIDATION SERVICES - PROCESS PAINTING AND ELECTRICAL CHANGE ORDERS AND ADJUSTMENTS.
INSTALL NEW SIGNAGE IN THE RONALD V DELLUMS FEDERAL BUILDING IN OAKLAND, CA -CA0281ZZ-
SCHWARTZ 3RD FLR JOINT REPAIR/WINDOW WATER PROOFING PROJECT.
SCHWARTZ LIBRARY ENTRYWAY RENOVATION INCLUDING WOOD AND ELECTRICAL WORK REQUESTED BY THE COURTS.
CHANGE ORDER - DELLUMS SOUTH TOWER FLOOR REPAIRS
USMS SALLYPORT OVERHEAD DOOR CONTROLLER ROYBAL FB, 255 EAST TEMPLE ST., LOS ANGELES, CA.
MODIFICATION TO REMOVE SHELVING FOR PROJECT AT THE RONALD V DELLUMS FEDERAL BUILDING IN OAKLAND, CA -CA0281ZZ-
ADD FUNDS TO COVER THE CHANGE REQUEST TO INCORPORATE NEW ASTM DESIGN REQUIREMENTS. CARTER KEEP AND EDWARD SCHWARTZ COURTHOUSE, SAN DIEGO, CA 92101.
7TH FLOOR CONFERENCE ROOM CARPET AT 450 GOLDEN GATE AVE SF, CA 94102
Business Details
- UEI
- KH6BMLLAQSK8
- CAGE Code
- 86XC1
- Address
- 2002 WINNETT ST
SAN DIEGO, CA 921141426 - Congressional District
- CA-52
- Phone
- 6198620924
Parent Company
G E A BUILDERS INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov