GENERAL DYNAMICS OTS (WILKES BARRE), LLC
DBA: MEDICO INDUSTRIES
WILKES BARRE, PENNSYLVANIA 187027005
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 561210 | $1.02B | 118 |
| 332993 | $680.99M | 162 |
Contract Awards
50 awards found
DELIVERY ORDER FOR 68,083 60MM HIGH EXPLOSIVE (HE) HIGH FRAGMENTATION (HF) 1 SHELL BODIES AND 51,603 81MM HE HF-1 SHELL BODIES
FINALIZE ECONOMIC PRICE ADJUSTMENT FOR 2023 120MM DELIVERIES.
FINALIZE ECONOMIC PRICE ADJUSTMENT FOR 2023 120MM DELIVERIES.
SCRANTON ARMY AMMUNITION PLANT (SCAAP) DIRECT FUNDING OF PWS FOR MIF, STRATEGIES, PLANNING AND FACILITIES, AND ON-SITE STAFF SUPPORT.
SCAAP CAPACITY EXPANSION TO 35K PER MONTH ADDITIONAL FUNDING FOR THE BASE TASK WITHIN EXISTING CEILING.
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR OPERATING COSTS OF THE SCRANTON ARMY AMMUNITION PLANT PROPERTY, A GOVERNMENT OWNED, CONTRACTOR OPERATED FACILITY FOR DELIVERIES OF M795 METAL PARTS FROM 31 JULY 2024 - 30 JULY 2025.
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE OPERATING COSTS OF SCRANTON ARMY AMMUNITION PLANT, A GOVERNMENT OWNED, CONTRACTOR OPERATED FACILITY FOR DELIVERIES OF M795 METAL PARTS FROM 31 JULY 2025 - 28 FEBRUARY 2026.
UCA DEFINITIZATION MOD FOR SCAAP ELECTRICAL SYSTEM UPGRADES PHASE 1. INCREASE FUNDING TO NEGOTIATED AMOUNT.
UCA PBS PROJECT FOR SCAAP ELECTRICAL SYSTEM UPGRADES PHASE 1 FUNDING INCREASE TO 75% OF NTE CEILING VALUE.
ESTABLISH CONTRACT LINE-ITEM NUMBER (CLIN) 9000AA TO OBLIGATE ECONOMIC PRICE ADJUSTMENT (EPA) FUNDS FOR CALENDAR YEAR 2025.
ESTABLISH CONTRACT LINE-ITEM NUMBER (CLIN) 9000AC TO OBLIGATE ECONOMIC PRICE ADJUSTMENT (EPA) FUNDS FOR CALENDAR YEAR 2025.
ESTABLISH CONTRACT LINE-ITEM NUMBER (CLIN) 9000AE TO OBLIGATE ECONOMIC PRICE ADJUSTMENT (EPA) FUNDS FOR CALENDAR YEAR 2025 FOR PRODUCTION DELIVERIES.
ESTABLISH CONTRACT LINE-ITEM NUMBER (CLIN) 9000AC TO OBLIGATE ECONOMIC PRICE ADJUSTMENT (EPA) FUNDS FOR CALENDAR YEAR 2025.
TRANSFER EQUIPMENT, INCREASE NTE CEILING, REVISE PAY OFFICE CODE, REVISED POP END DATE, AND DELETE ATTACHMENT 0002.
SCAAP UAPL 1 UNILATERAL DEFINITIZATION
SCRANTON ARMY AMMUNITION PLANT GAS HEATERS PRODUCTION BASE SUPPORT PROJECT
SCAAP CAPACITY EXPANSION TO 35K PER MONTH EXERCISE OF OPTIONS 2&5 DESCOPE OF OPTION 4.
UCA PBS PROJECT FOR SCAAP EQUIPMENT EXCESS SOW REVISION AND NTE CEILING/FUNDING INCREASE.
SCAAP FACILITY LIGHTING PBS PROJECT
M1128 TO M795 CONVERSION MOD UCA
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS.
PRESS PIT PUMPS TO WASTEWATER UPGRADES AT SCAAP, FUNDING INCREASE TO 75% OF CEILING VALUE OF THE UCA
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS IN PREPARATION OF CONTRACT CLOSEOUT.
MANUFACTURE, ASSEMBLY, INSPECTION, PACKAGE, AND DELIVERY OF THE 155MM ARTILLERY M795 PROJECTILE BODY ASSEMBLY IN SUPPORT OF UKRAINE.
SCAAP CAPACITY EXPANSION TO 35K PER MONTH BASE TASK FUNDING INCREASE PER PROPOSAL.
DELIVERY ORDER #2 60/81MM MORTAR SHELL BODIES
THE PURPOSE IS TO OBLIGATE FUNDING FOR ECONOMIC PRICE ADJUSTMENTS FOR COPPER AND STEEL, REVISE THE DELIVERY SCHEDULE TO INCLUDE TWO ADDITIONAL SHIPPING DESTINATIONS AND INCORPORATE CONSIDERATION FOR AUTHORIZING SUPPORT OF A DIRECT COMMERCIAL SALE.
ADDITION OF DRY FIRE SUPPRESSION SYSTEM TO HEAT TREAT FILTER TOWER PROJECT
SCAAP STEAM AND WATER PIPING UPGRADES
OBLIGATE FUNDS FOR AN ECONOMIC PRICE ADJUSTMENT
OBLIGATE FUNDS FOR AN ECONOMIC PRICE ADJUSTMENT
OBLIGATE FUNDS FOR AN ECONOMIC PRICE ADJUSTMENT
SCAAP ELECTRICAL SYSTEM UPGRADES PHASE 1 UCA.
DE-OBLIGATE FUNDS UNDER CONTRACT LINE-ITEM NUMBER AS A FIRST ARTICLE TEST WAS NOT REQUIRED.
THE PURPOSE OF THIS ORDER IS TO SATISFY THE MINIMUM GUARANTEE FOR W15QKN-24-D-0030 FOR THE MANUFACTURE, PRODUCE AND DELIVER 2,413 81MM HE NON-IM SHELL BODIES.
UCA PBS PROJECT FOR SCAAP EQUIPMENT EXCESS SOW REVISION & NTE CEILING INCREASE
FUNDING INCREASE FOR PRODUCTION BASE SUPPORT PROJECT FOR UNIVERSAL ARTILLERY PROJECTILE LINE 3
SCAAP FORGE SHOP EMERGENCY WATER VALVE REPLACEMENT
PRODUCTION SHOP CEILING TASK 3 FUNDING & SOW REVISION
SCAAP ORDERING PERIOD ONE OF THE FIRST FIVE-YEAR OPTION FOR SCAAP FACILITY PLANS, STRATEGIES & ANALYSES, SUPPORT OF ON-SITE GOVERNMENT STAFF, MAINTENANCE OF INACTIVE FACILITIES (MIF)
PRESS PIT PUMPS TO WASTEWATER UPGRADES AT SCAAP.
FUNDING INCREASE FOR XM1128 DESCALER ADDITIONAL IN SCOPE WORK
SCAAP 155MM CAPACITY EXPANSION OF METAL PARTS TO 35K CEILING INCREASE. INCREASE CEILING AND FUNDED VALUE TO ACCOUNT FOR OPTION 4 AND 7 FROM SOW BEING EXERCISED
PRODUCTION BASE SUPPORT PROJECT FOR UNIVERSAL ARTILLERY PROJECTILE LINE
OBLIGATE FUNDS FOR AN ECONOMIC PRICE ADJUSTMENT AND ACKNOWLEDGE ACO MOD ARZ999 AWARDED ON 25 APRIL 2024, WHICH REVISED THE ADMINISTERED BY DODAAC TO S2404A "DCMA MID-ATLANTIC" FROM S4201A AND THE PAY OFFICE DODAAC TO HQ0338 FROM HQ0337.
OBLIGATE FUNDS FOR ECONOMIC PRICE ADJUSTMENT ACKNOWLEDGE ACO MOD ARZ999 AWARDED ON 25 APRIL 2024, WHICH REVISED THE ADMINISTERED BY DODAAC TO S2404A "DCMA MID-ATLANTIC" FROM S4201A AND THE PAY OFFICE DODAAC TO HQ0338 FROM HQ0337.
OBLIGATE FUNDS FOR ECONOMIC PRICE ADJUSTMENTS AND ACKNOWLEDGE ACO MOD ARZ999 AWARDED ON 25 APRIL 2024, WHICH REVISED THE ADMINISTERED BY DODAAC TO S2404A "DCMA MID-ATLANTIC" FROM S4201A AND THE PAY OFFICE DODAAC TO HQ0338 FROM HQ0337.
OBLIGATE FUNDS FOR AN ECONOMIC PRICE ADJUSTMENT AND ACKNOWLEDGE ACO MOD ARZ999 AWARDED ON 25 APRIL 2024, WHICH REVISED THE ADMINISTERED BY DODAAC TO S2404A "DCMA MID-ATLANTIC" FROM S4201A AND THE PAY OFFICE DODAAC TO HQ0338 FROM HQ0337.
FUND ECONOMIC PRICE ADJUSTMENT AND ACKNOWLEDGE ACO MOD ARZ999 AWARDED ON 25 APRIL 2024, WHICH REVISED THE ADMINISTERED BY DODAAC TO S2404A "DCMA MID-ATLANTIC" FROM S4201A AND THE PAY OFFICE DODAAC TO HQ0338 FROM HQ0337.
Business Details
- UEI
- V1TVADBWD4E9
- CAGE Code
- 99938
- Address
- 1500 HIGHWAY 315 BLVD
WILKES BARRE, PA 187027005 - Congressional District
- PA-08
- Phone
- 5709087047
Parent Company
GENERAL DYNAMICS CORP
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov