HENSEL PHELPS CONSTRUCTION CO
TYSONS CORNER, VIRGINIA 221024872
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $941.43M | 309 |
Contract Awards
50 awards found
C103157 THIS MOD INCORPORATES CUSTOMER REQUESTED DESIGN CHANGES TO CLINICAL AND HOSPITAL SPACES. WITHOUT THESE MODS THE SPACE WOULD BE INCOMPLETE RENDERING THE BUILDING UNOCCUPIABLE.
C103157 THIS MOD INCORPORATES RF, MAGNETIC, AND EMI SHIELDING FOR MRI SPACES. WITHOUT THESE MODS THE SPACE WOULD BE INCOMPLETE RENDERING THE BUILDING UNOCCUPIABLE.
C103157 THIS MOD IS UNILATERAL ACTION TO INCORPORATE CONSTRUCTION OF REVISED DESIGN MODIFICATIONS FOR LAB MODS, FLOOR FINISHES, AND REPURPOSE SPACES. WITHOUT THESE MODS THE SPACE WOULD BE INCOMPLETE RENDERING THE BUILDING UNOCCUPIABLE.
C103754 - THE REASON FOR THIS MOD IS TO INCORPORATE VARIOUS DESIGN REVISIONS AND WORK TO COMPLETE THE CONSTRUCTION OF BLDG. 40A. WITHOUT IT, THE PROJECT CAN'T BE COMPLETED TO SUPPORT THE MISSION.
C107641 -THE REASON FOR THIS MODIFICATION IS TO INCORPORATE CHANGE ORDERS RELATED TO THE DESIGN OF THE NEW POOLESVILLE A AND B WINGS. WITHOUT THIS MODIFICATION THIS FACILITY WILL NOT BE COMPLIANT WITH CODE AND WILL BE UN-USABLE.
C103696 THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE THE REMAINING IC FUNDING FOR SPECIAL PURPOSE EQUIPMENT, ACTIVATION, FURNITURE, CIT, AND AVIT FOR WO C103696 RML BLDG. J (31A).
C103754 - THE REASON FOR THIS MOD IS TO PROVIDE FURNITURE FOR TURNKEY OF THE BUILDING 40A NORTH TOWER VRC LABORATORY EXPANSION PROJECT. WITHOUT IT, THE PROJECT CAN'T BE COMPLETED TO SUPPORT THE MISSION.
C106418 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESIGN BULLETINS AND RFI RESPONSES INTO CONSTRUCTION ACTIVITIES. WITHOUT THIS MODIFICATION THE GENERATORS WILL BE INCOMPLETE AND NON-USEABLE.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AND FUND THE ADDITIONAL CONTRACTUAL REQUIREMENTS AS PART OF THE CONSTRUCTION OF THE BLDG. 28 CHILLER PLANT C115241.
C107641 -THE REASON FOR THIS MODIFICATION IS TO INCORPORATE CHANGE ORDERS RELATED TO THE DESIGN OF THE NEW POOLESVILLE A AND B WINGS. WITHOUT THIS MODIFICATION THIS FACILITY WILL NOT BE COMPLIANT WITH CODE AND WILL BE UN-USABLE.
C103754 - THE REASON FOR THIS MOD IS TO INSTALL DEMOUNTABLE PARTITIONS AND LABORATORY EQUIPMENT TO PROVIDE A USABLE SPACE. WITHOUT IT, THE PROJECT CAN'T BE COMPLETED TO SUPPORT THE MISSION.
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER. THE REASON FOR THIS MODIFICATION IS TO INCLUDE THE COST INCURRED BY TRADE PARTNERS FOR UNFORESEEN CONDITIONS AND DESIGN ERRORS THAT HAVE EXTENDED THE DURATION OF THE CONSTRUCTION OF THE BUILDING.
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO FURNISH AND INSTALL A NEW THERMOFISHER KRIOS 5 (VRC) FOR THE RML BLDG. J PROJECT IN SUPPORT OF WO#C103696.
CHANGE BG, BN, BR, BU
DESIGN AND CONSTRUCTION RCR & MCF
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING IN SUPPORT OF THE BLDG. 28 CHILLER PLANT.
P00004
THE REASON FOR THIS MODIFICATION IS TO INCLUDE VARIOUS CONSTRUCTION CHANGES DUE TO UNFORESEEN CONDITIONS, CUSTOMER REQUESTED CHANGES, AND DESIGN DEFICIENCIES. A NO COST TIME EXTENSION IS INCLUDED FOR WEATHER AND ADMIN.
CHANGE BF
CHANGES BK, BO, BS, BT
THIS AWARD INCLUDES ALL DOCUMENTS INCLUDED IN THE TASK ORDER REQUEST FOR PROPOSAL #C103969, TO INCLUDE ALL AMENDMENTS (1-2) AND AMENDMENT INCORPORATED DOCUMENTATION, THE REVISED CONSTRUCTION WAGE RATES GENERAL DECISION NUMBER MT20240060 DATED 06/28/2
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER. THE REASON FOR THIS MODIFICATION IS TO COVER THE COST INCURRED BY TRADE PARTNERS FOR UNFORESEEN CONDITIONS AND DESIGN ERRORS THAT HAVE EXTENDED THE DURATION OF THE CONSTRUCTION OF THE BUILDING.
CHANGES DN, EN, FA
CHANGES ES, EW, EY, FB
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER. THE REASON FOR THIS MODIFICATION IS TO PROVIDE BIM COORDINATION, DOAS UNIT PIPING AND MECHANICAL PLATFORM COORDINATION, DOOR SCHEDULE CLARIFICATIONS, FLOOD TESTING, AND DELINEATION OF BLDG.40/40A OF
CHANGES BE BM BP BV
THE REASON FOR THIS ADMINISTRATIVE MODIFICATION IS TO REPLACE A LINE OF ACCOUNTING (LOA) WHICH WAS REMOVED IN MODIFICATION P00003. THE VALUE OF THE CONTRACT REMAINS UNCHANGED. ALL TERMS AND CONDITIONS REMAIN UNCHANGED.
THE CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
THE CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
DESIGN AND CONSTRUCTION RCR & MCF
CHANGES DY, EO, EX, EZ
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER. THE REASON FOR THIS MODIFICATION IS FOR A CONTRACT SCHEDULE EXTENSION THAT COVERS UNFORESEEN CONDITIONS AND DESIGN ERRORS THAT HAVE EXTENDED THE DURATION OF THE CONSTRUCTION OF THE BUILDING.
THE REASON FOR THIS MODIFICATION IS TO PROVIDE BIM COORDINATION AND ADDITIONAL LABOR TO REMOVE DEBRIS AS WELL AS TO FURNISH AND INSTALL THE INTERSTITIAL FLOOR SURFACE AND NEW PUMP IMPELLERS IN THE CHILLED WATER PUMPS 4 AND 5.
THIS CONTRACT ACTION IS ESSENTIAL TO ENSURE CONSTRUCTION ACTIVITIES CONTINUE TO PROGRESS AND REMAIN COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS TO ENSURE THE FACILITY COMPLIES WITH THE HIGHEST INDUSTRY STANDARDS.
PROJECT C104385 FUNDS THE CARES ACT-SUPPORTED CONSTRUCTION OF BUILDING B VIVARIUM (RCMC) AT NIH/RML. THIS FINAL MODIFICATION INCORPORATES AND FUNDS CHANGES FROM RFIS THROUGH RFI 833 AND ACTIVATION, FINALIZING ALL PREVIOUS MODIFICATIONS
X001 P-3002 RELOCATE HAZARDOUS CARGO PAD AND EOD PROFICIENCY RANG
CHANGES EP, ER, & ET
CHANGE BL
SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
MOD TO DE-OBLIGATE FUNDS AND ADD ADDITIONAL WORK
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER, BETHESDA
ADDITIONAL FUNDS TO REQ #7011484 - C107641 POOLESVILLE A&B CONVERSION DESIGN-BUILD CONTRACT, BLDG 102, JOSE MOREL LOPEZ [24-005745]
CHANGE AU
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER, BETHESDA
SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION ELECTRICAL SWITCHING STATION AND EMERGENCY GENERATORS (ESSEG)
CHANGE BJ INTERIOR DOMESTIC WATER METER
CHANGE BH
CHANGE EF DESCOPE BARRIER ARMS
CHANGE CD DOOR HARDWARE
VRC LABORATORY EXPANSION, BUILDING 40A NORTH TOWER, BETHESDA
Business Details
- UEI
- GPYDJ1NKULS8
- CAGE Code
- 1QZ19
- Address
- 1600 TYSONS BLVD STE 800
TYSONS CORNER, VA 221024872 - Congressional District
- VA-11
- Phone
- 7038283202
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov