THE CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO OPERATE AIR HANDLING UNITS NEEDED AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.
FUND LINE-ITEM PRICING FOR OVERTIME UTILITIES MECHANIC AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
REPLACE SHRUBBERY, ADJUST MULCH, PURCHASE AND INSTALL 8 NEW SPIRAEA BUSHES, TRIM ROUGHLY 30 TREES, AND REMOVE 4 TREES AND REPLACE WITH BLACK GUM TREES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
REMOVAL OF FURNITURE AND MATERIALS IN OFFICE THAT HAVE BEEN IMPACTED BY MOLD DUE TO THE RECENT SPRINKLER BREAK AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
REMOVE ADDITIONAL WATER DAMAGED MATERIALS FROM APPROXIMATELY 14,000 SF OF ON 1M, 2ND FLOOR, 3RD FLOOR, AND 4TH FLOOR DUE TO DAMAGE FROM A BROKEN SPRINKLER HEAD AT THE THOMAS EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, THE 2 OVERHEAD GARAGE DOORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
MANAGE FLOOD DAMAGE FROM A BROKEN SPRINKLER HEAD ON FLOORS: FOUR, THREE AND TWO AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
PROVIDE LABOR & MATERIAL TO REPAIR DAMAGE CAUSED BY AMEREN IN A-SIDE PRIMARY SWITCHGEAR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
MANAGE FLOOD DAMAGE FROM A BROKEN SPRINKLER HEAD ON FLOORS: FOUR, THREE, TWO AND ONE MEZZANINE AT THE THOMAS EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125 AS WELL AS MOLD TESTING.
THIS IS A GENERAL SERVICE ADMINISTRATION REQUIREMENT TO REPLACE GARAGE BARRIERS AT THE THOMAS F EAGLETON UNITED STATES COURTHOUSE AT 111 S 10TH STREET, ST. LOUIS, MISSOURI 63102.
THE CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO OPERATE AIR HANDLING UNITS NEEDED AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.
REPLACE MAN DOOR AT GARAGE ENTRANCE, PUBLIC DRINKING FOUNTAINS WITH FOUNTAIN/BOTTLE FILLER ON THE 5TH FLOOR, AND INSTALL CARBON STEEL STAIRS WHERE EXISTING LADDER IS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REBUILD CONDENSER WATER PUMP 3 AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
PROVIDE OFF HOUR HEATING AND AIR-CONDITIONING MONITORING AND REPAIRS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO FURNISH AND REPLACE THE CONTROLLER FOR THE EMERGENCY GENERATORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE TWO 2 DUCT DETECTORS AND ONE FIRE ALARM SYSTEM RELAY AT THE THOMAS F. EAGLETON U.S. COURTHOUSE ,111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REMOVE WALL COVERING AND PAINT WALLS IN EMPLOYEE HEALTH UNIT AT THE THOMAS F. EAGLETON U.S. COURTHOUSE , 111 S. 10TH STREET ST. LOUIS, MO 63102-1125.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REBUILD CONDENSER WATER PUMP 3 AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PERFORM REPAIRS TO THE EAST MAIN LOBBY ENTRANCE ROTATING DOOR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROGRAM NEW PHONE LINES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
REPACK SEALS ON FIRE PUMP 3, REPLACE THE BACKFLOW PREVENTER, REPAIR DAMAGED FENCING, AND REPAIR LEAKING HEAT EXCHANGER AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REMOVE AND REPLACE SHRUBBERY ON THE EAST SIDE AND ADJUST MULCH, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR AND REPLACE MULTIPLE GARAGE LIGHTS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.
REPLACE, THE PUBLIC DRINKING FOUNTAINS WITH COMBINATION DRINKING FOUNTAIN/BOTTLE FILLER ON THE 15TH FLOOR LOBBY AREA AND OPTION FOR 5TH FLOOR LOBBY AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, REPLACE CHILLED WATER PUMP 3, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR THE FIRE ALARM SYSTEM AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
EAGLETON U.S. COURTHOUSE O&M SERVICES OPTION IX 111 10TH ST, ST. LOUIS, MO (GENERAL SERVICES ADMINISTRATION)
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROVIDE AN LED LIGHTING UPGRADE IN PUBLIC CORRIDORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.
INSTALL AUDIO/VISUAL SYSTEM IN THE 24TH FLOOR GENERAL SERVICES ADMINISTRATION CONFERENCE ROOM AT THE THOMAS F. EAGLETON U.S. COURTHOUSE111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
PROVIDE OVERTIME MECHANIC FOR CHILLER OPERATION AND MAINTENANCE AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
REPLACE SINKS IN THE FIRST FLOOR RESTROOMS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
TRANSPORTATION SERVICES CLOSE OUT ORDER
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, REPLACE CHILLED WATER PUMP, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
REMOVE EXISTING OVERSIZED CUSTOM DOOR, FRAME AND HARDWARE/REPLACE. NEW HARDWARE WILL INCLUDE DELAY EGRESS DETEX EXIT DEVICE, ELECTRIC STRIKE AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102
REMOVE/REPLACE EXISTING OVERSIZED CUSTOM DOOR, FRAME AND HARDWARE. NEW HARDWARE WILL INCLUDE DELAY EGRESS DETEX EXIT DEVICE, ELECTRIC STRIKE, AND ALL OTHER HARDWARE NEEDED FOR NEW INSTALL AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROGRAM NEW PHONE LINES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, ALL THE LIGHTS IN THE CONFERENCE ROOM ON THE 24TH FLOOR AND 2 DIMMING SWITCHES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.
TRANSPORTATION SERVICES OBLIGATION OF FY2023 FUNDING
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REMOVE AND REPLACE 1 WINDOWPANE ON THE 24TH FLOOR, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO MAKE REPAIRS TO INSTALL CANE SENSORS, VARIABLE FREQUENCY DRIVERS, DOME LIGHTS AND REPAIR FLOOR DRAINS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH ST.
TRANSPORTATION SERVICES DEOBLIGATION OF EXCESS FY2022 FUNDING
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROVIDE AND REPLACE SIX (6) TREE RINGS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.
TRANSPORTATION SERVICES PARTIAL OBLIGATION OF FY2023 FUNDING
TRANSPORTATION SERVICES PARTIAL OBLIGATION OF FY2023 FUNDING
MODIFICATION PS0003 IS HEREBY ISSUED TO DEOBLIGATE $13,204.22 IN EXCESS FUNDING AND CLOSE OUT THE TASK ORDER. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROVIDING THE CLEANING, PREVENTIVE MAINTENANCE AND TESTING SERVICES OF THE TFE INDOOR FIRE RANGE.
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE THE SALLY PORT OVERSIZED MAN DOOR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
REPLACE BROKEN MAIN IRRIGATION PIPE AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.
TRANSPORTATION SERVICES DECREASE TRANSPORTATION HOURS LINES
THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO ADD ADDITIONAL LED LIGHTING FOR FY22 PHASE 2 AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.
Business Details
- UEI
- QNJCSBDMZCY5
- CAGE Code
- 68EN3
- Address
- 4461 COX ROAD SUITE 115
GLEN ALLEN, VA 230603331 - Congressional District
- VA-01
- Phone
- 8049684311
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov