P00002: ELECTRICAL AND GENERATOR PAD REVISIONS PROJECT 550-22-105 REPLACE B104 GENERATOR CON
MOD P00014 - RFP127
PROJECT 585-23-106 REPAIR PARKING LOTS: THIS MOD-3 DE-OBLIGATION SERVES AS A FUNDING CORRECTION TO MOD-2. INADVERTENTLY, MOD-2 WAS FUNDED WITH FY25 WHEN IT SHOULD HAVE BEEN FUNDED WITH FY26. A NEW MOD WILL BE ISSUED USING APPROPRIATE FUNDING.
PROJECT 585-23-106 REPAIR PARKING LOTS: MOD-4 HEREBY REPLACES MOD-2. FUNDING CORRECTION TO MOD-2. INADVERTENTLY, MOD-2 WAS FUNDED WITH FY25 WHEN IT SHOULD HAVE BEEN FUNDED WITH FY26.
MINIMUM GUARANTEE UNDER THE MULTIPLE-AWARD TASK ORDER CONTRACT (MATOC) BASE AWARD. ACTION IS BEING DE-OBLIGATED AS THE ONE MINIMUM GUARANTEE IS FULFILLED.
PROJECT NUMBER 585-23-109, RENOVATE CLC FINISHES AT THE OSCAR G. JOHNSON VAMC IN IRON MOUNTAIN, MI
PN: 568-20-102 UPGRADE MENTAL HEALTH LOCK WARD MODIFICATION P000012 - CHANGES
EMERGENCY SEWER LINE REPAIR
MULTIPLE-AWARD TASK ORDER CONTRACT (MATOC) FOR GENERAL CONSTRUCTION SERVICES AT THE OSCAR G. JOHNSON VA MEDICAL CENTER IN IRON MOUNTAIN, MI
636A8-23-102 UPGRADE DOORS & HARDWARE
636A8-23-101, UPDATE SIGNAGE & WAYFINDING
CORRECT SAFETY DEFICIENCIES B14-B22
MULTIPLE-AWARD TASK ORDER CONTRACT (MATOC) FOR GENERAL CONSTRUCTION SERVICES AT THE OSCAR G. JOHNSON VA MEDICAL CENTER IN IRON MOUNTAIN, MI
MOD P00013 - RFP125
656-19-307 REMODEL BLDG 51-1 EASTSIDE
PN: 568-20-102 UPGRADE MENTAL HEALTH LOCK WARD MODIFICATION P000011 - REA SETTLEMENT
CORRECT SAFETY DEFICIENCIES B14-B22
CORRECT SAFETY DEFICIENCIES B14-B22
CONSTRUCTION PROJECT 546-23-112 - RENOVATE INTERIOR CORRIDORS BUILDING 1, FLOORS 2-3, AT MIAMI VAMC, MIAMI, FL. THE CONTRACTOR SHALL PERFORM ALL NECESSARY CONSTRUCTION WORK PER THE STATEMENT OF WORK (SOW).
MOD P00012 - RFP117, RFP120, RFP121, RFP122, RFP123, RFP124
PN: 568-20-102 UPGRADE MENTAL HEALTH LOCK WARD MODIFICATION P00009 - DIRECTIVE CHANGE MODIFICATION FOR WITHIN-SCOPE CHANGES.
MULTIPLE-AWARD TASK ORDER CONTRACT (MATOC) FOR GENERAL CONSTRUCTION SERVICES AT THE OSCAR G. JOHNSON VA MEDICAL CENTER IN IRON MOUNTAIN, MI
PROJECT NUMBER 438-20-601 REPAIR, SIOUX FALLS VA MEDICAL CENTER
CONSTRUCT NEW CLINICAL LAB EXPANSION RICHMOND - MOD P00011 - ELECTRICAL CHANGES.
REA-003: STOCKPILING UNSUITABLE SOIL, HAULING OFF AND IMPORTING SUITABLE SOIL TO REPLACE UNACCEPTABLE MATERIAL. REA-004: RETAINING WALL FOUNDATION DEMOLITION. REA-005: ADDITIONAL ASPHALT PAVEMENT TO AN EXISTING LOW POINT.
656-400 CONSTRUCT PACT BLDG. 4 1ST FLOOR - ST. CLOUD, MN - MINOR CONSTRUCTION
MOD P00011 - RFP114 REA001, RFP119 DUCT
PN: 568-20-102 UPGRADE MENTAL HEALTH LOCK WARD MODIFICATION P00009 - DIRECTIVE CHANGE MODIFICATION FOR WITHIN-SCOPE CHANGES.
MOD P00010-- RFP118 MED GAS
PN: 568-20-102 UPGRADE MENTAL HEALTH LOCK WARD MODIFICATION P00007 - BILATERAL MODIFICATION FOR WITHIN-SCOPE CHANGES.
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT.
MOD P00009 - RFP115 AND RFP116 ADDED TO CONTRACT.
PROJECT 550-22-105 REPLACE B104 GENERATOR CON
INSTALL NEW STORM SEWER PIPING BETWEEN THE GEOTHERMAL AND LOW VOLTAGE DUCT BANKS AND CHANGE THE SLOPE OF THE STORM SEWER LINES TO ENSURE ADEQUATE CLEARANCE FOR THE GEOTHERMAL AND VOLTAGE UTILITIES LINES THAT CROSS THE STORM WATER LINES.
CONSTRUCT NEW CLINICAL LAB EXPANSION RICHMOND - MOD P00010 - ELECTRICAL CHANGES.
CONSTRUCT NEW CLINICAL LAB EXPANSION RICHMOND - MOD P00009 - ELECTRICAL CHANGES.
(REA-002) CONTAMINATED SOILS: THIS CHANGE IS BASED ON THE REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR STOCKPILING CONTAMINATED SOIL, HAULING OFF AND IMPORTING NEW SOIL TO REPLACE THE CONTAMINATED QUANTITIES.
PN#: 438-24-301 REPAIR BLDG.5 ROOF LEAKS - SIOUX FALLS, SOUTH DAKOTA MOD P00001- INCORPORATE SOW CHANGES AND INCREASE TOTAL CONTRACT VALUE.
(R-001) REMOVAL AND REPLACEMENT OF EXISTING CURB, PEDESTRIAN RAMP ON THE NORTH SIDE, ASPHALT PAVEMENT, STORM SEWER CASTING, AND ADJUSTING RINGS, BAR GRATING AND ASSOCIATE CONCRETE.
MOD P00008 - RFP111 AND RFP113 ADDED TO CONTRACT.
PN: 438-20-600, REPLACE RESEARCH HVAC (SF) 36C26319D0067 36C26322N0331 MOD P00009 - CORRECT ISSUES +$148,900.81
MINIMUM GUARANTEE UNDER THE MULTIPLE-AWARD TASK ORDER CONTRACT (MATOC) BASE AWARD. ACTION WILL BE DE-OBLIGATED ONE MINIMUM GUARANTEE IS FULFILLED.
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT.
TEMPORARILY REMOVE AND RE-INSTALL EXISTING GATE VALVE (PLUNGER) AT MH-38IN IN ORDER TO INSTALL THE CIPP. ADDITIONALLY, THE CONTRACTOR HAS TO CHANGE PIPE SIZES WHEN THE INSTALLED PIPE WAS DISCOVERED TO BE DIFFERENT SIZE THAN SPECIFIED IN PLANS.
P00002 - DE-SCOPE SPRINKLER PAINTING.
PN#: 438-24-301 REPAIR BLDG.5 ROOF LEAKS - SIOUX FALLS, SOUTH DAKOTA
656-400 CONSTRUCT PACT BLDG. 4 1ST FLOOR - ST. CLOUD, MN - MINOR CONSTRUCTION
MOD P00007 - RFP112 ADDED TO CONTRACT.
MOD P00006 - RFP 108, 109, 110 ADDED TO CONTRACT.
PN: 568-20-102 UPGRADE MENTAL HEALTH LOCK WARD MODIFICATION P00007 - BILATERAL MODIFICATION FOR WITHIN-SCOPE CHANGES.
Business Details
- UEI
- H8KMD811NZE3
- CAGE Code
- 1QPH2
- Address
- 1920 20TH AVE N
ESCANABA, MI 498299577 - Congressional District
- MI-01
- Phone
- 9067899021
Parent Company
INDUSTRIAL MAINTENANCE SERVICES INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov