JOHNSON, MIRMIRAN & THOMPSON, INC.
DBA: JOHNSON MIRMIRAN & THOMPSON INC
HUNT VALLEY, MARYLAND 210302059
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $25.47M | 246 |
| 541350 | $3K | 4 |
| 541310 | $2K | 5 |
Contract Awards
50 awards found
CONTRACT MODIFICATION PS10 ADDS FUNDS FOR SCHEDULE REVIEW SERVICES. ALL OTHER ITEMS REMAIN UNCHANGED.
THE PURPOSE OF THE CONTRACT MODIFICATION IS TO: 1. ADD AND FULLY FUND NEW CONTRACT LINE-ITEM NUMBER (CLIN) 00901 IN THE TOTAL OBLIGATED AMOUNT OF $158,535.77 FOR ADDITIONAL FIELD ASSESSMENT ACTIVITIES AND GEOTECHNICAL ANALYSIS IN ACCORDANCE WITH THE
THE PURPOSE OF THIS MODIFICATION IS TO ADD AND FULLY FUND NEW CONTRACTING LINE-ITEMS NUMBERS (CLIN) FOR TREE SURVEY AND ADDITIONAL ROADWAY WORK ASSOCIATED WITH THE ATTACHED STATEMENT OF WORK AS FOLLOWS: 1. ADD AND FULLY FUND CLIN 01007 IN THE TOTAL
SERVICES FOR WORK ASSOCIATED TO PROJECT NP NATR 5570-028P - A/E TASK FOR SUBSURFACE EXPLORATION, LABORATORY TESTING, AND GEOPHYSICAL SURVEY FOR THE DELIVERY OF A GEOTECHNICAL AND GEOPHYSICAL DATA REPORT.
CONTRACT MODIFICATION ADDS FUNDING TO EXTEND THE GENERATOR CX SUPPORT SERVICES TO JULY 2026 AND IS TO BE FUNDED BY BA80 RWA N3367106. ALL OTHER ITEMS REMAIN UNCHANGED.
THIS MOD PS0012 IS FOR NEPA SPECIAL STUDIES AND PROJECT MANAGEMENT ACTIVITIES FOR MULTIPLE LPOE'S
CONSTRUCTION MANAGEMENT SERVICES TIME EXTENSION FOR THE DURATION OF THE PROJECT. ALL OTHER ITEMS REMAIN UNCHANGED.
STRUCTURAL ENGINEERING SERVICES FOR THE GENERAL SERVICES ADMINISTRATION REGION 3. PHILADELPHIA, PA. OPTION PERIOD 3.
CONTRACT MODIFICATION PS04 ADDS FUNDING FOR THE CONTRACTOR TO PROVIDE SERVICES TO INSPECT AND TESTING ON STEEL BEAM. THE FUNDING SOURCE WILL BE RWA A5015760. ALL OTHER ITEMS REMAIN UNCHANGED.
SERVICES FOR WORK ASSOCIATED TO PROJECT NC ERFO FS NFNC811 2021-2(1) - A/E TASK FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS.
47PB0123F0005 NEPA MAINE LPOE'S THIS TASK ORDER IS AN REA FOR ADDITIONAL HOURS USED WHEN RESUMED WORK FROM THE STOP WORK ORDER.
ADD ESTIMATING SERVICES AND MISCELLANEOUS TASKS FOR CMA SERVICES
CONTRACT MODIFICATION PS08 ADDS FUNDING TO EXERCISE OPTION YEAR 2. THE NEW TOTAL CONTRACT VALUE IS $891,858.99 AND EXTENDS THE CONTRACT COMPLETION DATE TO 7-31-2026. ALL OTHER ITEMS REMAIN UNCHANGED.
SERVICES FOR WORK ASSOCIATED TO PROJECT MD NP CHOH BRG (1) - A/E TASK FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS.
THIS CONTRACT MODIFICATION ADDS FUNDING FOR CM SERVICES TIME EXTENSION THROUGH SEPTEMBER 30, 2025. ALL OTHER ITEMS REMAIN UNCHANGED.
CONTRACT MODIFICATION ADDS FUNDING TO EXTEND THE CONTRACTOR'S SERVICES TO 12/30/2025. ALL OTHER ITEMS REMAIN UNCHANGED.
CONSTRUCTION MANAGER AS ADVISOR (CMA) SERVICES CONTRACT IN SUPPORT OF THE NYFO CHILLER UPGRADE PROJECT
MODIFICATION TO REMOVE ALL CONSTRUCTION PHASE REQUIREMENTS.
GSA ACQUISITION PAUSE DELAY 1 MONTH OF DB AWARD & ADDITIONAL TIME SPENT IN ACQUISITION SUPPORT PHASE
ORCA 150025 IMMEDIATE STABILIZATION OF THE OREGON CAVES CHATEAU CM SERVICES
CONTRACT MODIFICATION PS0007 ADDS FUNDING IN THE AMOUNT OF $21,115.38 FOR JMT TO PROVIDE COMMISSIONING SUPPORT SERVICES FROM 1/13/2025 - 7/31/2025. ALL OTHER ITEMS REMAIN UNCHANGED.
CM AND COMMISSIONING PROCUREMENT - IRA - THIS CONTRACT IS TO PROCURE NON-SEVERABLE CONSTRUCTION MANAGEMENT SERVICES FOR THE NCR NATIONAL DEEP ENERGY RETROFIT 7-1 AND 7-2 PROJECTS (ENERGY SAVINGS PERFORMANCE CONTRACT). POP: 01/17/2025-9/15/2028.
THIS CONTRACT MODIFICATION EXTENDS THE CONTRACT COMPLETION DATE TO 4/30/2025 FOR THE AMOUNT OF $60,226.00. ALL OTHER ITEMS REMAIN UNCHANGED.
ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC)
SERVICES TO PERFORM SUBSURFACE EXPLORATION AND LABORATORY TESTING FOR THE DELIVERY OF A GEOTECHNICAL DATA REPORT. ALSO, TO PERFORM ONE (1) LANDSLIDE SITE ASSESSMENT AND DESIGN ANALYSIS FOR THE DELIVERY OF A FINAL GEOTECHNICAL DESIGN REPORT, PLANS, SP
AEP REGION 1 IDIQ MINIMUM GUARANTEE TASK ORDER
SERVICES TO PERFORM SUBSURFACE UTILITY ENGINEERING (SUE) QUALITY LEVEL A (QL-A), LOCATING, AND QUALITY LEVEL B (QL-B), DESIGNATING OF UNDERGROUND UTILITIES WITHIN LIMITS OF DISTURBANCE (LOD) IN THE PROJECT AREA FOR PROJECTS: MD NP SUIT 1(3) 2(3).
CONSTRUCTION MANAGER AS ADVISOR (CMA) SERVICES TO SUPPORT THE GSA DEGETAU PHOTOVOLTAIC (PV) PANELS PROJECT.
2200 NORTH AMERICAN STREET FBI FACILITY ENVIRONMENTAL STUDY AND REPORTING, PHILADELPHIA, PA. THIS MODIFICATION ADDS AN ADDITIONAL MEETING AND REVIEWS OF PREPARED MATERIALS.
MODIFICATION EXTENDING THE CONTRACT UNTIL 12/31/2024
CRLA 198641 THE PURPOSE OF THIS MODIFICATION P00003 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
CONSTRUCTION MANAGEMENT SERVICES FOR THE US CUSTOMS BORDER PATROL AT BALTIMORE, WASHINGTON INTERNATIONAL AIRPORT, BALTIMORE, MD.
THE PURPOSE OF THIS MODIFICATION IS TO: 1. ADD AND FULLY FUND NEW CONTRACT LINE-ITEM NUMBERS (CLINS) TO INCREASE THE TOTAL OBLIGATED AMOUNT FROM $1,667,675.24 BY $179,081.80 TO $1,846,757.04 FOR WORK ASSOCIATED WITH SAFETY IMPROVEMENTS AS FOLLOWS:
THIS MODIFICATION MOD PS0006 INCLUDES ADDITIONAL STUDIES RELATED TO THE MAINE LPOES.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ALL LEVEL OF EFFORT NEEDED TO TESTFIT UPDATES ADD 11TH FLOOR AND MODIFY THE 10TH FLOOR TO THE USACE WORKPLACE ENGAGEMENT STUDY.
VETERANS ADMINISTRATION PHILADELPHIA INFORMATION TECHNOLOGY CENTER CONSTRUCTION MANAGEMENT SERVICES, PHILADELPHIA, PA. THIS MODIFICATION EXERCISES OPTION YEAR 1 FOR ADDITIONAL CM SERVICES.
FEDERAL BUREAU OF INVESTIGATION ENVIRONMENTAL REMEDIATION REVIEW, 2200 N. AMERICAN DR., PHILADELPHIA, PA. THIS TASK ORDER IS A REMEDIATION REVIEW.
INCORPORATING COSTS FOR AN EXTENSION OF SERVICE UNTIL 7/31/2024
THE PURPOSE MODIFICATION PO0003 IS TO TERMINATE FOR CONVENIENCE OF THE GOVERNMENT THE CMA HR ANNEX CONTRACT, HATO REY, PR.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ALL EFFORT AS DESCRIBED IN RFP 005-ADDITIONAL PLANNING AND TEST FITS. IN ADDITION, A TIME EXTENSION WAS INCLUDED THAT PUSHES THE CONTRACT COMPLETION DATE TO JUNE 21, 2024.
THIS MODIFICATION IS FOR ADDITIONAL SERVICES FOR THE BUILDING EVALUATION REPORT TO BUILDING ASSESSMENT TOOL SERVICES AT THE THOMAS F EAGLETON UNITED STATES COURTHOUSE LOCATED AT 111 S 10TH STREET, ST. LOUIS, MISSOURI 63102.
THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD ADDITIONAL FUNDING FOR TASK 10 (CLIN 5), EXTEND THE PERIOD OF PERFORMANCE, AND REVISE THE DELIVERABLE DATES.
FODO 253278 - CMR SERVICES THE PURPOSE OF MODIFICATION P00001 IS TO EXTEND THE PERIOD OF PERFORMANCE FROM APRIL 30, 2024 THROUGH AUGUST 30, 2024.
VETERANS ADMINISTRATION PHILADELPHIA INFORMATION TECHNOLOGY CENTER CONSTRUCTION MANAGEMENT SERVICES, PHILADELPHIA, PA. THIS MODIFICATION INCORPORATES ADDITIONAL CM SERVICES FOR RFP 04.
THE PURPOSE OF THIS MODIFICATION P00003 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
THE PURPOSE OF THIS MODIFICATION IS TO DECREASE THE TOTAL OBLIGATED AMOUNT FOR THIS TASK ORDER FROM $288,991.09 BY $69,859.77 AND FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER IN ITS ENTIRETY IN THE AMOUNT OF $219,131.32 AS FOLLOWS: 1. DECREAS
CONSTRUCTION MANAGER AS AGENT AND COMMISSIONING AGENT SERVICES FOR THE MIKE MANSFIELD FEDERAL BUILDING AND US COURTHOUSE SEISMIC RETROFIT PROJECT LOCATED AT 400 N MAIN STREET BUTTE, MONTANA.
THE PURPOSE OF THIS MODIFICATION P00002 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
THE PURPOSE OF THIS MODIFICATION P00005 IS TO DEOBLIGATE EXCESS FUNDS AND CLOSE OUT THE CONTRACT.
THE PURPOSE OF THIS MODIFICATION IS TO ADD AND FULLY FUND NEW CONTRACT LINE ITEMS (CLIN) ASSOCIATED WITH DOEE STORMWATER MANAGEMENT PLAN REVIEW AND DOEE SOIL EROSION AND SEDIMENT CONTROL PLAN REVIEW PERMITS AS FOLLOWS: 1. ADD AND FULLY FUND CLIN 008
Business Details
- UEI
- QGC7CHWHPT51
- CAGE Code
- 1B2K5
- Address
- 40 WIGHT AVE
HUNT VALLEY, MD 210302059 - Congressional District
- MD-02
- Phone
- 4103293100
Parent Company
JOHNSON, MIRMIRAN & THOMPSON, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov