K.F. DAVIS ENGINEERING, INC
DANVILLE, CALIFORNIA 945261727
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $8.23M | 69 |
| 541310 | $1.21M | 45 |
Contract Awards
50 awards found
MOD P000011 EXTEND POP TO DECEMBER 31, 2025 AND ADD AN ADDITIONAL SITE VISIT FOR FINAL INSPECTION.
TITLE I PRELIMINARY DESIGN - SCHEMATIC DESIGN SERVICES - CAPEHART HIGH VOLTAGE SYSTEM UPGRADE - PMIS #349940 - GOLDEN GATE NATIONAL RECREATION AREA, CA
PPS NWZ ARCHITECTURE AND ENGINEERING (AE) IDIQ
AE DESIGN REPLACE PRIMARY SUBSTATION TRANSFORMER AND DUAL PRIMARY
UPGRADE CHILLER AND BMS PROJECT (24Z6AW2) AT FCI SHERIDAN, IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. MODIFICATION 1.
PUHO TITLE II DESIGN REPAIR CONCRETE CRACKS
TITLE II DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENTS SERVICES FOR REPLACE HVAC EQUIPMENT AT CAPEHART HOUSING AREA - GOLDEN GATE NATIONAL RECREATION AREA - SAN FRANCISCO, CA
TITLE II DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENTS SERVICES, FORT CRONKHITE HVAC AND WATER HEATER REPLACEMENT, GOLDEN GATE NATIONAL RECREATION AREA
AMME TITLE II DESIGN - REHABILITATE DRAINAGE AT VC
A&E SERVICES FOR THE DIE POLISH AREA PRIOR AT THE UNITED STATES MINT - SAN FRANCISCO. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER.
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING REMAINING ON THIS ORDER.
AE DESIGN REPLACE PRIMARY SUBSTATION TRANSFORMER AND DUAL PRIMARY
CALIFORNIA AREA FACILITY CONDITION ASSESSMENTS
CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS AND TRANSPORTATION TO CONCEPTUALIZE, DESIGN FOR CONSTRUCTION AND PROVIDE DESIGN SUPPORT SERVICES FOR A TOTAL OF 7,000 NEW SQUARE FEET, RENOVATE AND ADDITIONAL 4,200 SF IN BUILDING 19 OUTPATIENT CLINIC AND BUILDING 20, THE COMMUNITY LIVING CENTER. KEY ELEMENTS OF THIS PROJECT INCLUDE: NEW HEMODIALYSIS CAPABILITY FOR LONG TERM RESIDENTS AND OUTPATIENTS, ESTABLISHMENT OF SLEEP STUDY PROGRAM, NEW RETAIL SERVICE, EXPANSION OF INPATIENT PHARMACY AND CANTEEN. PROJECT ALSO RELOCATES STAFF, AND DEMOLISHES BUILDING AB-2 A 4,304 SQUARE FOOT TEMPORARY STRUCTURE, AND BACKFILLS WITH 12 PARKING SPACES. A/E SERVICES SHALL BE PROVIDED IN ACCORDANCE WITH THE SCOPE OF WORK FOR THE VA MARTINEZ OUTPATIENT CLINIC.
MODIFICATION 1_ UPGRADE FIRE PUMP AT FCC TUCSON, K2103
J. HERBERT STONE NURSERY MODIFICATION P00001 FOR ELECTRICAL AND HVAC DESIGN SERVICES
A&E SERVICE MIDWAY OWNER'S REPRESENTATIVE
CONTRACTOR SHALL PROVIDE ALL DESIGN SERVICES TO SUCCESSFULLY PERFORM ALL DESIGN ACTIVITIES FOR THE BELCOURT USP 795 797 800 PHARMACY RENOVATION DESIGN
REPLACE CHILLERS, COOLING TOWERS, AND BMS AT USP ATWATER PROJECT 25Z6AC8 IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK.
MOD TO DE-OBLIGATE AE CPS FUNDS DUE TO EXPIRED MATOC.
UPGRADE CHILLER AND BMS PROJECT (24Z6AW2) AT FCI SHERIDAN, IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK.
FOR ADDITIONAL FLOW INVESTIGATION AND INCREASED ECC AMOUNT.
A/E_ USP ATWATER_ LOAD SHED STUDY_ 24Z6AU9
MOD TO ADD REVISED SOW. ARCHITECTURE AND ENGINEERING SERVICES
MOD P00008 EXTEND POP TO JANUARY 3, 2025 AND INCORPORATE ADDITIONAL SITE VISIT.
HHCC CAMPUS PROJECTS
CALIFORNIA AREA FACILITY CONDITION ASSESSMENTS
TITLE I PRELIMINARY AND SCHEMATIC DESIGN SERVICES, FORT CRONKHITE HVAC AND WATER HEATER REPLACEMENT, GOLDEN GATE NATIONAL RECREATION AREA, CALIFORNIA
MOD 2 TO ADD SCHEMATIC DESIGN FOR RE-LOCATION OF ELEVATOR.
A&E UPGRADE COOLING TOWER AT FCC TUCSON - 23Z6AL7
THIS PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL SERVICES IN ACCORDANCE PROPOSAL DATED 28 JUNE 2024.
CALIFORNIA AREA FACILITY CONDITION ASSESSMENTS
CALIFORNIA AREA FACILITY CONDITION ASSESSMENTS
DE-OBLIGATE EXCESS FUNDING FOR CLOSEOUT
THE PURPOSE OF THIS MODIFICATION IS TO ADD COMMISSIONING SERVICES TO THE TASK ORDER.
CALIFORNIA AREA FACILITY CONDITION ASSESSMENTS
CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS AND TRANSPORTATION TO CONCEPTUALIZE, DESIGN FOR CONSTRUCTION AND PROVIDE DESIGN SUPPORT SERVICES FOR A TOTAL OF 7,000 NEW SQUARE FEET, RENOVATE AND ADDITIONAL 4,200 SF IN BUILDING 19 OUTPATIENT CLINIC AND BUILDING 20, THE COMMUNITY LIVING CENTER. KEY ELEMENTS OF THIS PROJECT INCLUDE: NEW HEMODIALYSIS CAPABILITY FOR LONG TERM RESIDENTS AND OUTPATIENTS, ESTABLISHMENT OF SLEEP STUDY PROGRAM, NEW RETAIL SERVICE, EXPANSION OF INPATIENT PHARMACY AND CANTEEN. PROJECT ALSO RELOCATES STAFF, AND DEMOLISHES BUILDING AB-2 A 4,304 SQUARE FOOT TEMPORARY STRUCTURE, AND BACKFILLS WITH 12 PARKING SPACES. A/E SERVICES SHALL BE PROVIDED IN ACCORDANCE WITH THE SCOPE OF WORK FOR THE VA MARTINEZ OUTPATIENT CLINIC.
PARKER ENERGY RENO DESIGN
HHCC CAMPUS PROJECTS
HVAC MODERNIZATION & SUSTAINABILITY DESIGN: IMPROVE THE ANM-JRD COMPOUND AND KETCHIKAN BUNKHOUSE HVAC SYSTEMS.
HVAC MODERNIZATION & SUSTAINABILITY DESIGN: IMPROVE THE ANM-JRD COMPOUND AND KETCHIKAN BUNKHOUSE HVAC SYSTEMS.
ARCHITECTURE AND ENGINEERING SERVICES FOR BUILDING 164 USP PHARMACY COMPLIANCE- HVAC LOCATION DESIGN CHANGE
A&E UPGRADE COOLING TOWER AT FCC TUCSON - 23Z6AL7
TASK ORDER 2031JG19D00014/2031JG23F00304-A&E SERVICES FOR ELEVATORS 3, 5 AND 6 RENOVATIONS AT UNITED STATES MINT-SAN FRANCISCO
FORT WASHAKIE HEALTH CENTER EXPANSION AND RENOVATION DESIGN (PROJECT# BI22WR400C10)
J. HERBERT STONE NURSERY, BUILDING 2863 AE SERVICES
A&E UPGRADE COOLING TOWER AT FCC TUCSON - 23Z6AL7
TASK ORDER 2031JG19D00014-2031JG23F00230-ADDITIONAL SERVICES AND SPECIAL INSPECTION AND TESTING-EXTERIOR FENCE AND TURNSTILE-UNITED STATES MINT-SAN FRANCISCO
MOD TO INCORPORATE REVISED SOW AND EXTEND POP: ARCHITECTURE AND ENGINEERING SERVICES
WRSU OPERATING ROOM UPS DESIGN (PROJECT# PH21WR01H8)
Business Details
- UEI
- XKL5LVP7YGE3
- CAGE Code
- 0D6Z0
- Address
- 530 LA GONDA WAY STE E
DANVILLE, CA 945261727 - Congressional District
- CA-10
- Phone
- 9257438884
Parent Company
K.F. DAVIS ENGINEERING, INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov