KMN CONSTRUCTION, INC.
DBA: KMN CONSTRUCTION INC
LOA, UTAH 84747
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $5.48M | 39 |
| 237110 | $242K | 2 |
| 236118 | $45K | 3 |
| 238110 | $19K | 2 |
| 238990 | $17K | 1 |
| 321992 | $11K | 1 |
| 237310 | $0 | 1 |
Contract Awards
38 awards found
FOREST WIDE TABLE REPLACEMENT & SIGN INSTALLATION
ESCALANTE EMERGENCY FLOOD CLEAN UP AND MITIGATION AFTER 5 TO 6 INCHES OF STORM WATER BROKE WINDOW AND ENTERED BASEMENT OF HOME.
GAOA-ESCALANTE RANGER DISTRICT HOUSING UPGRADES (TASK ORDER) DIXIE NF
FREMONT RIVER RANGER DISTRICT, FISHLAKE NATIONAL FOREST AND THE SANPETE RANGER DISTRICT, MANTI-LASAL NATIONAL FOREST TREE COOLERS MOD 1- THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADJUST THE REQUIREMENTS OF THE TREE COOLERS FOR BOTH THE FI
FREMONT RIVER RANGER DISTRICT, FISHLAKE NATIONAL FOREST AND THE SANPETE RANGER DISTRICT, MANTI-LASAL NATIONAL FOREST TREE COOLERS
THE BEAVER RANGER DISTRICT WANTS TO REPLACE THE REFRIGERATION CYCLE FOR THEIR TREE COOLER BUILDING. BEAVER RANGER DISTRICT BUILT A TREE COOLER IN 2003. THE BUILDING HAS BEEN FUNCTIONAL BUT NEEDS SOME MAINTENANCE. THE TREE COOLER IS CURRENTLY RUNNING
GAOA- ESCALANTE RANGER DISTRICT HOUSING UPGRADES. REMODEL BUNKHOUSE, CONVERT STORAGE BUILDING INTO LAUNDRY BUILDING, AND CONSTRUCT SEVERAL TINY HOMES.
THE PURPOSE OF THIS MODIFICATION IS TO: 1. ADD WHEEL STOPS AS WELL AS THE REPLACEMENT OF WHEEL STOPS THAT ARE DAMAGED UPON REMOVAL AND REINSTALLATION AFTER CHIP SEAL HAS BEEN PLACED ON THE PAVEMENTS.
THIS PROJECT INVOLVES THE PROCUREMENT AND INSTALLATION OF A 27' GLULAM SLAB TRAIL BRIDGE ON TIMBER SILLS.
TASK ORDER TO CONSTRUCT A NEW CONCRETE PAD WITH INTERPRETIVE KIOSKS AND A WATER HYDRANT AT THE DUCK CREEK VISITOR CENTER
OFFICE WINDOW REPLACEMENT TASK ORDER - FLNF THE WORK INCLUDES: THE DEMOLITION AND DISPOSAL OF EXISTING WINDOWS IN THE BUILDING. THE INSTALLATION OF NEW 2 PANE WINDOWS AT THE LOCATIONS OF THE OLD WINDOWS. FINISHING WORK INCLUDING PAINTING, TRIM
DIXIE NATIONAL FOREST - SINGLE VAULT TOILET BUILDING
R4 FACILITIES MATOC, REMOVE CHIPPED PAINT, PREPARE SURFACE FOR REPAINTING OF TWO BUILDINGS
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
SHED FOR THE TEASDALE RD FIRE TO INCLUDE DELIVERY.
PINE VALLEY CAMPGROUND ASPHALT MAINTENANCE
THE BEAVER RANGER DISTRICT WANTS TO REPLACE THE REFRIGERATION CYCLE FOR THEIR TREE COOLER BUILDING. BEAVER RANGER DISTRICT BUILT A TREE COOLER IN 2003. THE BUILDING HAS BEEN FUNCTIONAL BUT NEEDS SOME MAINTENANCE. THE TREE COOLER IS CURRENTLY RUNNING
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
GAOA SPRUCES SOUTH LOOP CG RECONSTRUCTION PROJECT
SAUL'S MEADOW CONCRETE SUPPLY CONTRACT
PANGUITCH ADMIN SITE, DIXIE NF INSTALL NEW GATE AND ASSOCIATED ELECTRICAL WORK AND FENCING.
GAOA SPRUCES SOUTH LOOP CG RECONSTRUCTION PROJECT
GAOA FISHLAKE CG WATER SYSTEM DM REDUCTION - PHASE 1 - 2023
CASSIDY TRAILHEAD VAULT TOILET
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
POSEY LAKE BOAT RAMP AND DAM MAINTENANCE
GAOA SPRUCES SOUTH LOOP CG RECONSTRUCTION PROJECT
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
SAUL'S MEADOW CONCRETE SUPPLY CONTRACT
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
LOA DISTRICT OFFICE ENERGY UPGRADE MOD 5: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1-INCORPORATE THE CHANGE ORDERS REQUESTED ON 9/14/2022-SEE ATTACHED. 2-EXTEND THE PERIOD OF PERFORMANCE TO OCTOBER 31, 2022 MOD 4: THE PURPOSE OF TH
FISHLAKE SUPERVISOR'S OFFICE RENNOVATIONS
POSEY LAKE BOAT RAMP AND DAM MAINTENANCE
CCIFC HAZMAT BUILDING CONCRETE & ELECTRICAL DIXIE NATIONAL FOREST THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION ITEM O.033000-1 - 8" CONCRETE PAD. THE OPTION ITEM IS BEING EXERCISED IN ACCORDANCE WITH FAR 52.217-7. THE OPTION
LOA DISTRICT OFFICE ENERGY UPGRADE MOD 4: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCORPORATE THE CHANGE ORDERS REQUESTED ON 8/9/2022-SEE ATTACHED. NO OTHER CHANGES ARE BEING MADE AT THIS TIME. MOD 3: THE PURPOSE OF THIS BILATERAL M
CCIFC HAZMAT BUILDING CONCRETE & ELECTRICAL DIXIE NATIONAL FOREST AWARD IS BEING MADE FOR THE BASE ITEM AND OPTION ITEM O.260500-1. IN ACCORDANCE WITH FAR 52.217-7, THE GOVERNMENT HAS 120 CALENDAR DAYS AFTER CONTRACT AWARD TO EXERCISE OPTION
LOA DISTRICT OFFICE ENERGY UPGRADE MOD 3: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD ADD COOLING AIR CIRCULATION IN THE COMPUTER ROOM, CHANGING THE LIGHTS SO THEY MATCH THROUGHOUT THE BUILDING AND REPLACE MORE DAMAGED CONCRETE. NO OT
Business Details
- UEI
- HTJCD3K1YVR5
- CAGE Code
- 7BS44
- Address
- 376 N 100 E
LOA, UT 84747 - Congressional District
- UT-02
- Phone
- 4358362399
Parent Company
KMN CONSTRUCTION, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov