KOO LLC
CHICAGO, ILLINOIS 606011785
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541310 | $2.29M | 181 |
Contract Awards
50 awards found
47PF0024F0899, MOD PS0002 - DIRKSEN HARDENING DESIGN. DEOBLIGATE UNUSED DESIGN FUNDS.
TASK ORDER 47PF0023F1085, USCOA ROOM 2769 AND 2787 MODERNIZATION, EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN ST., CHICAGO, IL 60604. THIS MODIFICATION IS BEING ISSUED TO ADD ADDITIONAL HOURS FOR DESIGN SERVICES.
MODIFICATION TO INCORPORATE CONSTRUCTION PHASE SERVICES, SSA SIB 2ND FLOOR OFFICE RENOVATION ON THE 2ND FLOOR AT THE JOHN F. SEIBERLING FB, 2 SOUTH MAIN STREET, AKRON, OH 44308-1813.
MODIFICATION FOR ADDITIONAL DESIGN SERVICES WITHIN SCOPE FOR THE BIRCH BAYH U.S. COURTHOUSE 280-292 CHAMBERS RENOVATION DESIGN PROJECT TAKING PLACE IN INDIANAPOLIS, INDIANA
EXTERIOR PERIMETER LIGHTING UPGRADE-STANLEY J. ROSZKOWSKI U.S. COURTHOUSE 327 S CHURCH ST ROCKFORD, IL. ALLOCATION FOR PROFESSIONAL LAND SURVEYING AND REDESIGNING THE PROPOSED PERIMETER LIGHTING TO BE ABLE TO ADD LIGHTING FOCUSED ON THE BUILDING.
ARCHITECT-ENGINEER DESIGN SERVICES FOR THE US ATTORNEY'S OFFICE EXPANSION AT THE STANLEY J. ROZKOWSKI U.S. COURTHOUSE IN ROCKFORD, ILLINOIS
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE REMAINING FUNDS FOR CONTRACT CLOSEOUT. 47PF0024F0638, MOD PA0003 HEREBY DECREASES THE TOTAL OBLIGATED AMOUNT FROM $146,941.18 BY $49,835.04 TO $97,106.14.
MODIFICATION PS0007 TO AWARD TASK ORDER 47PF0022F0925, ROOF HATCH ACCESS UPGRADE AE SERVICE, LOCATED AT 536 S. CLARK FEDERAL BUILDING.
ARCHITECT/ENGINEER SERVICES FOR BASEMENT STORM WATER DRAINAGE IMPROVEMENTS, FEDERAL BUILDING, 536 SOUTH CLARK STREET, CHICAGO, ILLINOIS. THIS MODIFICATION IS BEING ISSUED TO INCORPORATE ADDITIONAL PLUMBING INVESTIGATION HOURS TO COMPLETE THE DESIGN.
U.S. COURT OF APPEALS COMBINED PROJECTS, EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS. THIS MODIFICATION INCORPORATES ENVIRONMENTAL SERVICES.
536 FIRE ALARM FOLLOW-ON , 536 SOUTH CLARK STREET, CHICAGO, ILLINOIS. THIS MODIFICATION IS BEING ISSUED TO DEOBLIGATE 0.01 TO CLIN 0003 TO MATCH PEGASYS FOR TASK ORDER CLOSEOUT. THE WORK IS 100% COMPLETE.
ARCHITECT/ENGINEER SERVICES FOR 536 FIRE ALARM FOLLOW-ON, 536 SOUTH CLARK STREET, CHICAGO, ILLINOIS. THIS MODIFICATION IS BEING ISSUED TO DEOBLIGATE $42,502.01 FOR UNUSED LABOR HOURS REQUIRED TO COMPLETE THIS PROJECT.
U.S. COURT OF APPEALS COMBINED PROJECTS, EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS. THIS MODIFICATION IS BEING ISSUED TO DEOBLIGATE $3,416.43 FROM CLIN 0002, BA80 FUNDING STRING.
GRANITE PROTECTION FROM SKATEBOARDERS STUDY, JOHN C. KLUCZYNSKI FEDERAL BUILDING AND RALPH H. METCALFE FEDERAL BUILDING IN CHICAGO, ILLINOIS. THIS MODIFICATION DEOBLIGATES $5,150.37 FOR SERVICES NOT PERFORMED RESULTING FROM A MUTUAL CANCELLATION.
TERMINATION FOR CONVENIENCE AGREEMENT FOR THE IRS FORCED MOVE PROJECT AT THE NATHANIEL R. JONES FEDERAL BUILDING AND U.S. COURTHOUSE IN YOUNGSTOWN, OH.
MODIFICATION FOR ADDITIONAL CONSTRUCTION ADMINISTRATION SERVICES FOR THE BIRCH BAYH USCH 280-292 CHAMBERS RENOVATION DESIGN ORDER TAKING PLACE IN INDIANAPOLIS, INDIANA
U.S. COURT OF APPEALS COMBINED PROJECTS, EVERETT M. DIRKSEN U.S. COURTHOUSE, CHICAGO, ILLINOIS. THIS MODIFICATION IS PART OF THE COST TRANSFER PROCESS TO CORRECT ACCOUNTING LINE TIED TO ENVIRONMENTAL COST ASSOCIATED WITH CLIN 002.
MODIFICATION FOR ADDITIONAL DESIGN WORK WITHIN SCOPE FOR THE DEFENSE CONTRACTING MANAGEMENT AGENCY 2ND FLOOR RENOVATION TAKING PLACE AT THE MILWAUKEE FEDERAL COURTHOUSE IN MILWAUKEE, WISCONSIN
MODIFICATION TO ADD SECURITY DEVICES INTO DESIGN FOR THE US TRUSTEES 8TH FLOOR RENOVATION AT THE EVERETT M. DIRKSEN FEDERAL BUILDING & US COURTHOUSE IN CHICAGO, IL
MODIFICATION FOR ADDITIONAL WORK WITHIN SCOPE FOR THE BIRCH BAYH USCH 280-292 CHAMBERS RENOVATION DESIGN - INDIANAPOLIS, INDIANA
MODIFICATION TO ADD ADDITIONAL DESIGN SERVICES FOR THE DIRKSEN HARDENING DESIGN AT THE EVERETT M. DIRKSEN US COURTHOUSE IN CHICAGO, IL
ARCHITECT AND ENGINEER SERVICES FOR THE MULTIPLE FLOOR SECURITY UPGRADES AT THE EVERETT M. DIRKSEN U.S. COURTHOUSE, 219, SOUTH DEARBORN, CHICAGO, ILLINOIS 60604. THIS MODIFICATION ACCEPTS THE A/E'S PROPOSAL TO PERFORM PRE-ALTERATION ASSESSMENT.
ARCHITECT ENGINEER, KOO, LLC, ATRIUM SMOKE EXHAUST SYSTEM UPGRADES DESIGN, LOCATED AT THE CLARK STREET FEDERAL BUILDING, 536 S. CLARK, CHICAGO, IL 60605.
ARCHITECT/ENGINEER SERVICES FOR THE GROUND FLOOR LIGHTING UPGRADES, UNITED STATES POST OFFICE - LOOP STATION AT 211 S CLARK STREET, CHICAGO, ILLINOIS. THIS MODIFICATION EXERCISES OPTIONS AND EXTENDS COMPLETION DATE TO OCTOBER 31, 2025.
ARCHITECT/ENGINEER SERVICES FOR THE GRANITE RUST LEACHING STUDY AT THE JOHN C. KLUCZYNSKI FEDERAL BUILDING, U.S. POST OFFICE - LOOP STATION, AND THE RALPH H METCALFE FEDERAL BUILDING IN CHICAGO, ILLINOIS.
ARCHITECT/ENGINEER SERVICES FOR THE GRANITE PROTECTION FROM SKATEBOARDERS STUDY, JOHN KLUCZYNSKI FEDERAL BUILDING AND RALPH H. METCALFE FEDERAL BUILDING IN CHICAGO, ILLINOIS.
DIRKSEN HARDENING DESIGN AT THE EVERETT M. DIRKSEN US COURTHOUSE IN CHICAGO, IL
MODIFICATION TO REDUCE SQUARE FOOTAGE FOR THE US TRUSTEES 8TH FLOOR RENOVATION AT THE EVERETT M. DIRKSEN FEDERAL BUILDING & US COURTHOUSE IN CHICAGO, IL
ARCHITECT/ENGINEERING SERVICES FOR THE UNITED STATES COURT OF APPEALS MULTIPLE FLOOR SECURITY UPGRADES PROJECT AT THE EVERETT M. DIRKSEN UNITED STATES COURTHOUSE AT 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS 60604-1702.
ARCHITECT ENGINEER, KOO, LLC, US CITIZENSHIP IMMIGRATION SERVICES, AUTOMATIC DOOR OPENERS DESIGN, LOCATED AT FEDERAL BUILDING, 536 S. CLARK STREET, CHICAGO, IL 60605.
47PF0022F0927-RH METCALFE FB, ALLEY WALL DETERIORATION AE DESIGN MOD PS0004 ADDS 3RD PARTY ENV TESTING, PCCS, CM& I AND RECORD DOCUMENTS FOR A TOTAL OF $18,450.10. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
ARCHITECTURE AND ENGINEER SERVICES FOR THE IRS FORCED MOVE AT THE NATHANIEL R. JONES FEDERAL BUILDING AND US COURTHOUSE IN YOUNGSTOWN, OH
ARCHITECT ENGINEER, KOO, LLC, SINK HOLE STUDY, LOCATED AT THE FEDERAL PARKING FACILITY, 450 S. FEDERAL STREET PLAZA, CHICAGO, IL 60605.
ARCHITECT ENGINEER, KOO, LLC, IRA RESTORATION SITES: RENOVATE STREETSCAPE DESIGN, LOCATED AT THE STANLEY J. ROSZKOWSKI U.S. COURTHOUSE, 327 S CHURCH ST, ROCKFORD, IL 61101.
THIRD PARTY AIR MONITORING SERVICES FOR THE US DISTRICT COURT CHAMBER RESTROOM 18 AND 22 PROJECT AT THE EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS 60604-1505.
COURT OF APPEALS COMBINED PROJECTS, EVERETT M. DIRKSEN COURTHOUSE, 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS. MODIFICATION TO AWARD PCCS, M&I, RECORD DOCUMENTS, AND 3RD PARTY ENVIRONMENTAL MONITORING.
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE REMAINING FUNDS FOR CONTRACT CLOSEOUT. 47PF0023F0813, MOD PA0001 HEREBY DECREASES THE TOTAL OBLIGATED AMOUNT FROM $29,914.20 BY $12,728.05 TO $17,186.15. THE PERIOD OF PERFORMANCE REMAINS UNCHANGED.
ARCHITECT/ENGINEERING SERVICES TO PERFORM A MODERNIZATION STUDY ON THE ELEVATORS SERVICING THE FEDERAL PARKING FACILITY AT 450 SOUTH FEDERAL STREET, CHICAGO, ILLINOIS 60605-1107
EMERGENCY EXIT DOORS AT THE JOHN C KLUCZYNSKI BUILDING, 230 S. DEARBORN STREET AND EVERETT M. DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN STREET, CHICAGO, ILLINOIS. MODIFICATION EXTENDS COMPLETION DATE TO 5/19/2025 AND EXERCISES OPTIONS.
TASK ORDER AWARD FOR THE BIRCH BAYH USCH 280-292 CHAMBERS RENOVATION DESIGN PROJECT TAKING PLACE AT THE BIRCH BAYH U.S. COURTHOUSE, 46 E OHIO STREET, INDIANAPOLIS, IN 46204-1903
ARCHITECTURE AND ENGINEER SERVICES FOR THE US TRUSTEES DIRKSEN 8TH FLOOR RENOVATION AT THE EVERETT M. DIRKSEN FEDERAL BUILDING & US COURTHOUSE IN CHICAGO, IL
ARCHITECT ENGINEER SERVICES FOR USMS CONDUIT INSTALLATION, EVERETT M. KINLEY DIRKSEN U.S. COURTHOUSE, 219 SOUTH DEARBORN STREET, CHICAGO, ILLINOIS.
MODIFICATION PS0001 INCORPORATES WORK ORDER NO. 202A ADDITIONAL DESIGN SERVICES FOR THE SSA SERVICE INTERVIEW BAY 2ND FLOOR RENOVATION AT THE JOHN F. SEIBERLING FB AND U.S. COURTHOUSE, 2 SOUTH MAIN STREET, AKRON, OH, 44309. (OH0194ZZ)
AIA (ART-IN-ARCHITECTURE) PATHS RECONFIGURATION, ROCKFORD COURTHOUSE, 327 SOUTH CHURCH STREET, ROCKFORD, ILLINOIS. MODIFICATION TO AWARD POST CONSTRUCTION CONTRACT SERVICES, CONTRACT MANAGEMENT AND INSPECTION, AND RECORD DOCUMENTS.
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) ARCHITECTURE/ENGINEERING (A/E) SERVICES COVER THE CHICAGOLAND AREA DEFINED AS THE CHICAGO-NAPERVILLE-ELGIN,IL-IN-WI METROPOLITAN STATISTICAL AREA AND SHALL ALSO INCLUDE THE COUNTY OF WINNEBAGO.
ARCHITECT/ENGINEERING SERVICES FOR THE UNITED STATES COURT OF APPEALS ROOM 2769 AND 2787 MODERNIZATION AT THE EVERETT MCKINLEY DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN STREET, CHICAGO, ILLINOIS 60604-1702
ARCHITECT ENGINEER SERVICES FOR U.S. DISTRICT COURTS 20TH FLOOR BREAKROOM, EVERETT MCKINLEY DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN STREET, CHICAGO, ILLINOIS. THIS MODIFICATION CORRECTS THE AMOUNT AMOUNT TO MATCH THE ACCEPTED PROPOSAL.
ARCHITECT/ENGINEERING SERVICES FOR THE UNITED STATES DISTRICT COURT 25TH FLOOR ROBING RESTROOM UPGRADES AT THE EVERETT MCKINLEY DIRKSEN U.S. COURTHOUSE, 219 S. DEARBORN STREET, CHICAGO, IL 60604-1702
THIS MODIFICATION IS ISSUED TO AWARD PREVIOUSLY ACCEPTED OPTIONS FOR THE METCALFE LOBBY DOOR REPLACEMENT ARCHITECTURE AND ENGINEERING AWARD. PROJECT IS FOR THE METCALFE U.S. FEDERAL BLDG IN CHICAGO, IL.
- DESIGN SERVICES RELATED TO THE 536 ROOF HATCH ACCESS UPGRADE PROJECT. CONTRACT MODIFICATION PS0004 EXERCISES OPTIONS 1-3, FOR CONSTRUCTION ADMIN SERVICES (PCCS), CONSTRUCTION ADMIN (CM & I) AND CONSTRUCTION ADMIN (RECORD DOCS).
Business Details
- UEI
- L9ZJGUKZFLR8
- CAGE Code
- 4TYC2
- Address
- 55 W WACKER DR STE 600
CHICAGO, IL 606011785 - Congressional District
- IL-07
- Phone
- 3122350920
Parent Company
KOO LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov