MINIMUM GUARANTEE FOR W9127825D0037 KORTE CONSTRUCTION COMPANY
CONTRACT FOR FLIGHT TEST ENGINEERING LAB COMPLEX AT EDWARDS AFB, CA. REFERENCE NO. R00014 CONTRACT AWARD PROTEST. CONTRACT PRICE IS INCREASED BY $1,571,737.09. THE COMPLETION DATE SHALL REMAIN UNCHANGED BY REASON OF THIS MODIFICATION.
PRIMARY FACILITY NEC INFORMATION SYSTE
MINIMUM GUARANTEE TASK ORDER, N6247825D4047
CONTRACT FOR BBSD CONSOLIDATED MAINTENANCE FACILITY, AT VANDENBERG SPACE FORCE BASE, CA. REFERENCE NO. R00005, VAULTS AND CAMERAS. CONTRACT PRICE INCREASED BY $39,135.38. COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
EXERCISE CLIN(S) 6,7, AND 8 ON CONTRACT W912QR25C0006 FOR DEMOLITION AND REMOVAL OF EXISTING NEC BUILDING 197
PHASES 1 THROUGH 3 PLATING SHOP
DE-OBLIGATE FUNDS FROM CLIN000101
W912PL23C0017 B6500 CMF MILCON-SENTINEL-(KORTE) MODIFICATION NO. R00004 - DSC EXISTING UNDERGROUND UTILITIES-SITE. TOTAL CONTRACT PRICE INCREASED BY $1,133,300.54. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
B1400 FURNITURE REMOVAL/B1401 ELEC DEMO, REFERENCE NO. R00013, WL015 ELIMINATION OF BLDG.1401 ELECTRICAL DEMO, WL023, CONTRACT PRICE INCREASED BY $100,497.82, THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 62 CD.
CHANGE: WC007 TITLE: GENERATOR STANDARDIZATION CONTRACTOR IS BEING DIRECTED TO USE A SINGLE MANUFACTURER FOR GENERATORS, CUMMINS-ONAN.
PHASES 1 THROUGH 3 PLATING SHOP
EXERCISING OPTION CLIN 0007
FORT HUNTER LIGGETT NETWORK ENTERPRISE CENTER: THIS PROJECT PROVIDES FOR THE DESIGN AND CONSTRUCTION OF A 21,500 SF INFORMATION SYSTEMS FACILITY (ISF), TO INCLUDE ORGANIZATIONAL VEHICLE PARKING, OPEN STORAGE AREA, AND BUILDING INFORMATION SYSTEMS.
PHASES 1 THROUGH 3 PLATING SHOP
3WG SQUADRON OPERATIONS & OPERATIONAL TEST FACILITY AT NELLIS AIR FORCE BASE, NV REFERENCE NO. R00011. TOTAL CONTRACT PRICE IS INCREASED BY $102,668.00.THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 86 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
CONTRACT FOR FLIGHT TEST ENGINEERING LAB COMPLEX AT EDWARDS AFB, CA. REFERENCE NO. R00012. WL022 FINAL FURNITURE DATA ELECTRIC ADJUSTMENT. CONTRACT PRICE IS INCREASED BY $98,157.69. COMPLETION DATE SHALL BE INCREASED BY 120 CALENDAR DAYS.
CONTRACT FOR JOINT SIMULATION ENVIRONMENT (JSE) AT EDWARDS AFB. REFERENCE NO. R00024, WL034 HVAC CHANGE. TOTAL CONTRACT PRICE IS INCREASED BY $26,304.87. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY REASON OF THIS MODIFICATION.
CONTRACT FOR GBSD CONSOLIDATED MAINTENANCE FACILITY AT VANDENBERG SFB, CA. R00002 WC004 AMERICAN WATER CONNECTION AGREEMENT. TOTAL CONTRACT PRICE IS INCREASED BY $631,488.48. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
FY20 GROUP CONSOLIDATED FACILITY, 365TH ISR REFERENCE NO. R00019/AV023 GENERATOR STARTUP AV024MODIFY GENERATOR ENCLOSURE. TOTAL CONTRACT PRICE IS INCREASED BY $223,031.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION
DESIGN BUILD CONSTRUCTION IDIQ MATOC - MINIMUM GUARANTEE TASK ORDER
CONSTRUCTION OF DRP AIRCRAFT MAINTENANCE FACILITY, GRAND FORKS BLDG. 649
THIS TASK ORDER IS FOR THE MINIMUM GUARANTEE OF $1,000.00 FOR THE FIVE-YEAR (5) TERM OF CONTACT W9127824D0073.
PHASES 1 THROUGH 3 PLATING SHOP
PHASES 1 THROUGH 3 PLATING SHOP
DISASTER RESILIENCY PROGRAM (DRP) PHASE 1
DESIGN BUILD CONSTRUCTION IDIQ MATOC - MINIMUM GUARANTEE TASK ORDER
ADMINISTRATIVE CHANGE TO LOA.
ADMINISTRATIVE CHANGE TO LOA.
R00009 $140974 +21CD
MINIMUM GUARANTEE W912HN24D3005
ONTRACT FOR GBSD CONSOLIDATED MAINTENANCE FACILITY AT VANDENBERG SFB, CA. REFERENCE NO. R00001, WC001 RELOCATE STORM DRAIN. TOTAL CONTRACT PRICE IS INCREASED BY $366,260.18. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
THIS MODIFICATION DOES NOT CHANGE THE CONTRACT PRICE. IT CORRECTS A $10.00 ERROR CREATED WITH A00009. REFERENCED MODIFICATION WAS INADVERTENTLY APPROVED IN PD2 AS A00009 IN THE AMOUNT OF $81,344.81. THE CORRECT MODIFICATION AMOUNT IS $81,334.81.
CONTRACT FOR JITC LAB BUILDING AT FORT HUACHUCA, ARIZONA. REFERENCE R00023/AH024 SERVER ROOM EMERGENCY DISCONNECT. THE CONTRACT AMOUNT IS INCREASED $64,134. THE CONTRACT COMPLETION DATE IS EXTENDED 7 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
CONTRACT FOR FLIGHT TEST ENGINEERING LAB COMPLEX AT EDWARDS AFB, CA. REFERENCE NO. R00011, WL020 LIGHT TIGHT LAB HARD LID. TOTAL CONTRACT PRICE IS INCREASED BY $14,494.51. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR JITC LABORATORY BUILDING AT FORT HUACHUCA, ARIZONA. REFERENCE R00022/AH025 REPLACE TWO (2) CRAH UNITS. THE CONTRACT AMOUNT IS INCREASED $74,052. THE CONTRACT COMPLETION DATE IS EXTENDED 14 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
COMMERCIAL & INSTITUTIONAL IV MACC
CONTRACT FOR JITC LABORATORY BUILDING AT FT HUACHUCA, AX. REF R00020/AH022 ADDITIONAL FIBER IN CLASSIFIED SERVER RM. THE CONTRACT AMOUNT IS INCREASED $603,386. THE CONTRACT COMPLETION DATE IS EXTENDED 35 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
X001 DB CONSTRUCTION MACC TO TP22010M REPAIR STUDENT BEQ 1666 29
R00016 $17,834
MINOR/ ARCHITECTURAL CHANGES & FENCE. FLIGHT TEST ENGINEERING LAB COMPLEX. REF. NO. R00010, WL012 MINOR CHANGES, WL013 LIGHT TIGHT LAB SECURITY FENCE, WL017 ARCHITECTURAL CHANGES. PRICE INCREASE $54,472.68. COMPLETION DATE INCREASES 66 CD.
CONTRACT FOR JITC LABORATORY BUILDING AT FT HUACHUCA, AZ. REF R00021/AH023 SHIELDED CAT6 CABLING CLASSIFIED LAB. THE CONTRACT AMOUNT IS INCREASED $354,085. THE CONTRACT COMPLETION DATE IS EXTENDED 55 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
CON: P9902 CSDC JB CHARLESTON, SC
CON: P9902 CSDC JB CHARLESTON, SC
CONTRACT FOR JITC LABORATORY BUILDING, FT. HUACHUCA, COCHISE COUNTY, ARIZONA. REFERENCE NO. R000019/AH021. THE CONTRACT AMOUNT IS INCREASED $73,527. THE CONTRACT COMPLETION DATE IS EXTENDED 17 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
CONTRACT FOR JITC LABORATORY BUILDING, FT. HUACHUCA, AZ. REF NO. R000018/AH012 ADDED FIBER AND COPPER INFRASTRUCTURE. THE CONTRACT AMOUNT IS INCREASED $266,664.THE CONTRACT COMPLETION DATE IS EXTENDED 13 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
R00008 +$42,360
CONTRACT FOR JITC LABORATORY BUILDING AT FORT HUACHUCA, ARIZONA. REFERENCE R00017/AH018 CONDUIT SLEEVES. THE CONTRACT AMOUNT IS INCREASED $15,442. THE CONTRACT COMPLETION DATE IS EXTENDED FIVE (5) CALENDAR DAYS BY REASON OF THIS MODIFICATION.
CONTRACT FOR JITC LABORATORY BUILDING AT FORT HUACHUCA, ARIZONA. REFERENCE R00016/AH020 HANDRAILS AT THE NORTH SIDE. THE CONTRACT AMOUNT IS INCREASED $18,316. THE CONTRACT COMPLETION DATE REMAINS UNCHANGED BY REASON OF THIS MODIFICATION.
RF SHIELDING, CONTRACT FOR FLIGHT TEST ENGINEERING LAB COMPLEX AT EDWARDS AFB. REFERENCE NO. R00009 WL018. TOTAL CONTRACT PRICE IS INCREASED BY $81,334.81. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
Business Details
- UEI
- X3BYPXNZN8N1
- CAGE Code
- 1D6R7
- Address
- 5700 OAKLAND AVE STE 275
SAINT LOUIS, MO 631101355 - Congressional District
- MO-01
- Phone
- 6186548611
Parent Company
KORTE CONSTRUCTION COMPANY
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov