LEJAS CORPORATION
TEMPE, ARIZONA 852832861
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 238990 | $354K | 10 |
| 237990 | $250K | 5 |
| 237110 | $197K | 7 |
| 237310 | $148K | 7 |
| 238220 | $136K | 5 |
| 561790 | $112K | 3 |
| 236220 | $107K | 5 |
| 238290 | $74K | 3 |
| 238310 | $46K | 1 |
| 238210 | $14K | 1 |
Contract Awards
27 awards found
CHIRICAHUA NATIONAL MONUMENT (CHIR) REPAIR HQ POOLS
WATER HEATER REPLACEMENT
CHIRICAHUA NATIONAL MONUMENT (CHIR) REPAIR HQ POOLS
EXTERIOR REPAIRS AT THE SLC ATCT, INCLUDING PAINTING TRACON AND ATCT EXTERIOR DOORS AND REPAIRING THE EXTERIOR GYPSUM BOARD SOFFIT AT THE 23RD FLOOR (JUNCTION LEVEL) BALCONY.
BLM MONITOR WELL PLUGGING
127EAW21C0031 - INSTALLATION OF BARRIER GATES AT BIG BEAR DISCOVERY CENTER TO SEPARATE EMPLOYEE AND GOVERNMENT FLEET FROM PUBLIC PARKING.
THE PURPOSE OF THIS PROJECT IS TO INSTALL AND NEW WELL AND SOLAR SYSTEM AT LANGOHR CAMPGROUND.
INSTALL GOVERNMENT FURNISHED SCAFFOLDING AND REPLACE CAB SEALANT AT RENO NV AIRPORT TRAFFIC CONTROL TOWER RENO NEVADA 89502.
THE PURPOSE OF THIS MODIFICATION P00002 IS TO DEOBLIGATE EXCESS FUNDS IN THE AMOUNT OF $.01 FOR SIDEWALK REPLACEMENT AT LASSEN VOLCANIC NATIONAL PARK, TEHAMA COUNTY, CALIFORNIA.
RENOVATE EXISTING BATHROOM TO MAKE IT HANDICAP ACCESSIBLE
RENOVATE EXISTING BATHROOM TO MAKE IT HANDICAP ACCESSIBLE
BLM MONITOR WELL PLUGGING
THE PURPOSE OF THIS REQUIREMENT IS TO REPLACE A COMMERCIAL GARAGE DOOR AT THE ENTRANCE TO THE GARAGE PARKING AT THE FRANK HAGEL FEDERAL BUILDING.
MABI COMPLETE CRITICAL REPAIRS FIRE HVAC
GATEHOUSE DOOR REPLACEMENT, TOWNSHEND LAKE, VT
EXTERIOR REPAIRS AT THE SLC ATCT, INCLUDING PAINTING TRACON AND ATCT EXTERIOR DOORS AND REPAIRING THE EXTERIOR GYPSUM BOARD SOFFIT AT THE 23RD FLOOR (JUNCTION LEVEL) BALCONY.
THE PURPOSE OF THIS PROJECT IS TO INSTALL AND NEW WELL AND SOLAR SYSTEM AT LANGOHR CAMPGROUND.
PARKING LOTS PAVING CHANGE AA - FINAL QUANTITIES
THE PURPOSE OF THIS BILATERAL MODIFICATION 2 IS TO: A) EXTEND THE PERIOD OF PERFORMANCE, CHANGING THE POP DATES FROM 5/30/2023 TO 10/31/2023 TO ALLOW FOR DELIVERY/LEAD TIMES FOR MATERIALS REQUIRED IN ORDER TO MAINTAIN FEDERAL HIGHWAY STANDARDS. B)
MICRO-SURFACING PAVEMENT REPAIRS, OTTER BROOK LAKE, KEENE, NH
MODIFICATION TO ADD FUNDS FOR SIDEWALK REPLACEMENT AT LASSEN VOLCANIC NATIONAL PARK, TEHAMA COUNTY, CALIFORNIA.
GAOA LANE SPRING ELECTRICAL & WATER FOUNTAIN REPLACEMENT AAP 602635
EXTERIOR GATES
CANYON DE CHELLY (CACH) REQUIRES THE REPLACEMENT OF GUARD RAILS THROUGHOUT PARK ROADS. COR/POC: RYAN YOUNG, RYAN_YOUNG@NPS.GOV, 928-674-5500X231 CO: TAYLOR JONES, TAYLOR_A_JONES@NPS.GOV, 520-780-9294 LOCATION: NPS, CANYON DE CHELLY NM CANYON
PARKING LOTS PAVING AT HANNIBAL LOCKS AND DAM, HANNIBAL, OHIO.
THE REASON FOR THE BILATERIAL MODIFICATION# IS TO EXTEND THE PERIOD OF PERFORMANCE(POP) TO 9/30/2022, DUE TO UNFORSEEN ADDITIONAL WORK BECAUSE OF ASBESTOS REMOVAL WITHIN 3 OUT OF THE FOUR HOUSES. PER COST PROPOSAL DATED 4/8/2022 FAR 52.212-4(C) CHA
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE UNUSED FUNDS TOTALING $30,492 AS THE RESULT OF THE TERMINATION OF THE ORDER FOR CAUSE ON APRIL 6, 2022.
Business Details
- UEI
- R96MEFRL2CB3
- CAGE Code
- 3UDC7
- Address
- 6202 S MAPLE AVE #127
TEMPE, AZ 852832861 - Congressional District
- AZ-04
- Phone
- 4807751152
Parent Company
LEJAS CORPORATION
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov