MEM CONTRACTING, INC.
DBA: MEM CONTRACTING INC
ABERDEEN, MARYLAND 210013612
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $28.85M | 162 |
| 237130 | $18.96M | 3 |
| 561210 | $3.78M | 51 |
| 561621 | $952K | 24 |
| 238220 | $205K | 3 |
| 561790 | $-207,290.75 | 2 |
Contract Awards
50 awards found
RENOVATE THE EXISTING COOLING AND HEATING SYSTEM WITHIN BUILDING 4403.
THIS REQUIREMENT IS FOR THE TWELFTH PHASE OF LIFE-CYCLE REPLACEMENT FOR THE REPLACEMENT OR REMOVAL OF VARIOUS ABOVE GROUND STORAGE TANKS AT ABERDEEN PROVING GROUND, MARYLAND.
MINOR CONSTRUCTION TASK ORDER FOR REPAIRS OF THE SERVICE PANEL SWITCHBOARD AT ABERDEEN PROVIDING GROUND, MD BUILDING 394 3000A.
THE PURPOSE OF THIS PROJECT IS TO REMOVE THE EXISTING AIR-COOLED CHILLER, AND TWO AIR-HANDLINGS UNITS LOCATED IN TWO SEPARATE ROOF TOP PENTHOUSES AND REPLACE THE UNITS WITH NEW.
REPAIR N-FIELD BUNKER BUILDING E1454 ABERDEEN PROVING GROUND, MARYLAND
REPAIR AIR HANDLER UNIT (AHU), AIR COOLED CHILLER, AND CENTRIFUGAL PUMPS.
CORRECTION TO ABERDEEN AREA CEMETERY
THIS TASK ORDER FUNDS THE CORRECTION TO EDGEWOOD AREA CEMETERY OIP REPEAT FINDINGS, WR# IM000033J.
ROOF REPAIR FOR BUILDING 6007, ABERDEEN PROVING GROUND.
THE PURCHASE OF MAINTENANCE AND REPAIR SERVICE FOR THE U.S. ARMY TEST AND EVALUATION COMMAND.
FIRE ALARM MONITORING OY4 INCREMENTAL FUNDING 1 APR - 31 OCT 2025
CONSTRUCTION TASK ORDER TO RENOVATE BUILDING 4600 AT ABERDEEN PROVING GROUND, MD AND PROVIDE UTILITIES AND INSTALLATION FOR THE BIG MAGNET PROJECT AND INDUCTION HEATING COIL.
PURCHASE OF MAINTENANCE AND REPAIR SERVICES.
EXERCISE OPTION YEAR 2
THIS TASK ORDER FUNDS THE REPLACEMENT OF THE AIR-COOLED CONDENSING UNIT AT BUILDING 4401, WR# CK000029J- 03.
EXERCISE OY4 WITH 2 MONTHS OF INCREMENTAL FUNDING (1-MAR-2025 TO 30-APR-2025) WITH A POP OF 01-MAR-2025 TO 28-FEB-2026.
THIS TASK ORDER FUNDS THE REPLACEMENT OF 33 FAN COIL UNITS ON THE 3RD FLOOR OF BUILDING 4401 AT ABERDEEN PROVING GROUND MD, WR# CK000029J-02
THIS TASK ORDER FUNDS THE REPLACEMENT OF 33 FAN COIL UNITS ON THE 3RD FLOOR OF BUILDING 4401 AT ABERDEEN PROVING GROUND MD, WR# CK000029J-02
FUNDING FOR WR# MWB000023J, REPAIR WATER DAMAGE, B30
FIRE ALARM MONITORING INCREMENTAL FUNDING OY3 JAN-FEB25
FIRE ALARM MONITORING OY3 INCREMENTAL FUNDING MOD NOV-DEC2024
REPAIR STEAM PIPING
B384 SIMULATOR HVAC UPGRADES
B384 SIMULATOR HVAC UPGRADES
THIS PROJECT IS TO DESIGN AND REPLACE THE SEWER LIFT STATION LOCATED NEAR BUILDING 4056 ON EDGEWOOD AREA ABERDEEN PROVING GROUND. THIS STATION HAS REACHED THE END OF ITS LIFE-SPAN AND NEEDS TO BE REPLACED FOR NORMAL, SAFE OPERATIONS TO CONTINUE.
THIS MODIFICATION IS TO PROVIDE FUNDING FOR WR# IM000079J WHICH ADDS A NEW TASK IN THE TOTAL AMOUNT OF $$22,553.55. THE POP DATE IS HEREBY EXTENDED TO 10/06/2025.
THIS MODIFICATION IS TO BE ADDING A NEW TASK TO TASK ORDER W56ZTN22D0001_W56ZTN24F0123 IN THE AMOUNT OF $22,553.55, WHICH INCREASED THE TOTAL AMOUNT FUNDED FROM $252,912.82 TO $275,466.37. THE POP DATE IS HEREBY, EXTENDED IN 172 DAYS TO 10/03/2025.
THE PROJECT REPLACES OLDER GENERATION ELECTRICAL PANELS FOR THE FIRST AND SECOND FLOOR OF BUILDING 5101 ON EDGEWOOD AREA ABERDEEN PROVING GROUND.
PROVIDE FUNDING ON CLINS 4002 AND 4003 FOR THE TASK ORDER W56ZTN22D0001_W56ZTN24F0057- WR# IM0001C3J - REPLACE CHILLER BLDG 4119. THE INCREASED FUNDED AMOUNT IS $717,475.45. THE PERIOD OF PERFORMANCE IS 06/10/2025.
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE FUNDING FOR WR# MT000113J - B5014 REPAIR HVAC SYSTEM. THE TOTAL FUNDED AMOUNT FOR THIS PROJECT IS $364,088.36. THE POP DATE IS 04/16/2025.
THIS PROJECT REPLACES THE INSIDE AND OUTSIDE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS FOR BUILDING 3074 ON ABERDEEN PROVING GROUND.
THIS PROJECT REPLACES AN OVERHEAD DOOR AT BUILDING 2401 ON ABERDEEN PROVING GROUND FOR SAFE AND NORMAL OPERATIONS.
THIS ACTION IS TO TERMINATE WR# AR0000N3J B4600 REPLACE CHILLER TASK ORDER W56ZTN24F0095 IN ITS ENTIRELY FOR GOVERNMENT CONVENIENCE PURSUANT TO FAR 52.212-4 (L). THIS TERMINATION RESULTED IN -$366,062.74 DE-OBLIGATION.
THIS TASK ORDER FUNDS WR# IM0001E8J - INSTALLATION OF GENERATOR AT THE CDC IN APG BUILDING E1902.
THE PERIOD OF PERFORMANCE IS 14 MARCK 2025.THIS TASK ORDER IS TO FUND WR#AR0000N3J REPAIR/REPLACE CHILLER #2 B4600.
THIS MODIFICATION FUNDS THE 6-MONTH EXTENSION OF SERVICES OPTION AND THE RESURFACING OF THE KIDDIE POOL FOR THE SHORE PARK SWIMMING POOL ON ABERDEEN PROVING GROUND MAIN CAMPUS.
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE FUNDING FOR WR# NAF000073J, NAF000083J, NAF000093J, NAF000063J AND NAF0000A3J - REMOVE/REPLACE PLAYGROUND PIP SURFACE. THE POP DATE FOR THIS PROJECT IS 04/11/2025.
FIRE ALARM MONITORING - INCREMENTAL FUNDING POP 01 JUL 2024 - 31 OCT 2024
THIS MODIFICATION ADDS FUNDING FOR NEW WORK, AND INCORPORATES THE MODIFIED SCOPE OF WORK DATED 07 FEBRUARY 2024.
INCREMENTAL FUNDING AND POP EXTENSION.
CONSTRUCTION FOR LOCH RAVEN RADIOGRAPHY SITE PREP B6 ROOM 01C
THIS TASK ORDER IS TO PROVIDE FUNDS FOR BOND OVERRUN ON BONDING OF $1M.
OPTION YEAR ONE EXERCISE
FIRE ALARM MONITORING 2 MONTHS FUNDING 23 APRIL 2024 - 22 JUNE 2024
INCREMENTAL FUNDING MOD
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE FUNDING FOR WR#IM0001C3J - BUILDING 311 REPAIR WATER INFILTRATION
THE PURPOSE OF THIS TASK ORDER IS TO PROVIDING FUNDING FOR WR# IM000079J - REPLACE THE GENERATOR LOCATED BEHIND THE BUILDING, AND THE AUTOMATIC TRANSFER SWITCH (ATS) DEDICATED FOR THE EDGEWOOD AREA CHILD DEVELOPMENT CENTER AREA E1901
EXERCISE OPTION YEAR 2
EMERGENCY BALTIMORE ABATEMENT SERVICES
THIS MODIFICATION PROVIDES PRIOR YEAR FUNDING FOR ADDITIONAL WORK, WR# AM000051J.
Business Details
- UEI
- XB5BHLMH8NN7
- CAGE Code
- 315E6
- Address
- 819 S PHILADELPHIA BLVD STE C
ABERDEEN, MD 210013612 - Congressional District
- MD-01
- Phone
- 4435022824
Parent Company
MEM CONTRACTING, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov