MOWA-BARLOVENTO JOINT VENTURE A
DBA: MOWA-BARLOVENTO JV-A
GAUTIER, MISSISSIPPI 395536066
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $172.55M | 154 |
| 236210 | $0 | 1 |
Contract Awards
50 awards found
THIS REQUIREMENT IS FOR THE RENOVATION OF THE HVAC SYSTEMS OF BUILDING 5450 AND 5460, AND UPGRADE OF THE FIRE ALARM AND MASS NOTIFICATION SYSTEMS OF THE SAME BUILDING, IN ACCORDANCE WITH THE OFFICIAL 100% DESIGN DOCUMENTS PROVIDED FOR THIS ENDEAVOR.
THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH THE GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS.
REPAIR AWACS APRON PHASE II, REPAIR WEST ALC MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGER 3102 AT TINKER AFB, OK
CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB
THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH THE GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS.
THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE SOW DATED 5 OCT 2023, ENTITLED REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL, PROJECT NO DBEH171568, SEE ATTACHMENT 1.
REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90) CALENDAR DAYS. CLIN 0003: FORTY-FIVE (45) CALENDAR DAYS.
KIRTLAND AFB, NM APRON A CONSTRUCTION WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK DATED 6 JUNE 2022, TITLED REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT CENTRAL REGION DESIGN-BID-BUILD (DBB) CONSTRUCTION SERVICES FOR
REPAIR AWACS APRON PHASE II, REPAIR WEST ALC MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGER 3102 AT TINKER AFB, OK
MACDILL AFB FL AMRS PROJECT
THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH THE GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS.
AIRFIELD LIGHTING - TYMX234822 AIRFIELD APPROACH LIGHT SEQUENCE FLASHING (ALSF-1) AND TYMX234820 AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM (ALCMS-1), JBSA RANDOLPH, TX.
TASK ORDER PLACED OFF OF IDIQ FA890317D0020 TO REPAIR BUILDING 181, THE CONFINEMENT FACILITY, LOCATED ON THE CHAPMAN ANNEX, TX.
HOLLOMAN AFB AMRS SYSTEM
THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH THE GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS.
DEMOLISH AND REMOVE THE EXISTING SUBSTATION INSIDE THE LEAN-TO STRUCTURE THAT SERVES THE 400HX EQUIPMENT AT B565 OFFUTT AFB, NE.
DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA
REPLACE FIRE PROTECTION SYSTEMS - B507 AT OFFUTT AFB, NE
REPAIR FIRE PROTECTION SYSTEMS AND ALARMS - B517 AT OFFUTT AFB, NE
THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH THE GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS.
PROVIDING THE LABOR, EQUIPMENT AND MATERIALS FOR NEW UNDERGROUND WATER UTILITIES AND INFRASTRUCTURE AMENITIES.
BARKSDALE AFB AMRS PROJECT
REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90) CALENDAR DAYS. CLIN 0003: FORTY-FIVE (45) CALENDAR DAYS.
THIS REQUIREMENT IS FOR THE RENOVATION OF THE HVAC SYSTEMS OF BUILDING 5450 AND 5460, AND UPGRADE OF THE FIRE ALARM AND MASS NOTIFICATION SYSTEMS OF THE SAME BUILDING, IN ACCORDANCE WITH THE OFFICIAL 100% DESIGN DOCUMENTS PROVIDED FOR THIS ENDEAVOR.
RECURRING RUBBER REMOVAL JBSA-WIDE LOCALITIES INCLUDING RANDOLPH AIR FORCE BASE EAST RUNWAY, SEGUIN AUXILIARY FIELD, AND LACKLAND AIR FORCE BASE KELLY FIELD; PERIOD OF PERFORMANCE IS 389 CALENDAR DAYS AFTER ISSUANCE OF NOTICE TO PROCEED.
NATIVE AMERICAN OWNED, MINORITY OWNED, SMALL DISADVANTAGED BUSINESS
RECONSTRUCT MAIN OPERATION APRON, CANNON AFB, NM.
CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE), AMARG AT DAVIS-MONTHAN AFB
MACDILL AFB FL AMRS PROJECT
HOLLOMAN AFB AMRS SYSTEM
BARKSDALE AFB AMRS PROJECT
ARNOLD AFB TN AMRS PROJECT
DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT TINKER AFB, OK.
THIS REQUIREMENT IS FOR THE RENOVATION OF THE HVAC SYSTEMS OF BUILDING 5450 AND 5460, AND UPGRADE OF THE FIRE ALARM AND MASS NOTIFICATION SYSTEMS OF THE SAME BUILDING, IN ACCORDANCE WITH THE OFFICIAL 100% DESIGN DOCUMENTS PROVIDED FOR THIS ENDEAVOR.
MCCONNELL AFB AMRS SYSTEM
DYESS AFB AMRS SYSTEM
THIS REQUIREMENT IS FOR THE RENOVATION OF THE HVAC SYSTEMS OF BUILDING 5450 AND 5460, AND UPGRADE OF THE FIRE ALARM AND MASS NOTIFICATION SYSTEMS OF THE SAME BUILDING, IN ACCORDANCE WITH THE OFFICIAL 100% DESIGN DOCUMENTS PROVIDED FOR THIS ENDEAVOR.
CONSTRUCTION OF APRON A AT KIRTLAND AFB
CONSTRUCTION OF APRON A AT KIRTLAND AFB
REPAIR HVAC B.5450 AND B.5460
SHAW AFB ADVANCED METER READING SYSTEM (AMRS)
CONSTRUCTION OF APRON A AT KIRTLAND AFB
RENOVATIONS AND REPAIRS TO CONFINEMENT CENTER
REPAIR HVAC B.5450 AND B.5460
DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA
DESIGN BID BUILD CONSTRUCTION SERVICES TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL
DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGAR 3102 AT TINKER AIR FORCE BASE OKLAHOMA
DESIGN AND CONSTRUCTION FOR SECURITY FENCE AROUND MAIN RAMP AT EBBING FIELD, FT SMITH, AR.
B11177 PARKING LOT
REPAIR APACHE TRAIL - GOODFELLOW AFB
Business Details
- UEI
- C8TLJHGBMJM8
- CAGE Code
- 6TX36
- Address
- 2700 OLD SPANISH TRAIL
GAUTIER, MS 395536066 - Congressional District
- MS-04
- Phone
- 2289909347
Parent Company
MOWA-BARLOVENTO JOINT VENTURE A
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov