NEHEMIAH CONSTRUCTION LLC
BARBOURSVILLE, WEST VIRGINIA 255049441
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237990 | $8.00M | 11 |
| 237310 | $459K | 1 |
| 238990 | $126K | 3 |
| 237110 | $52K | 2 |
| 238290 | $24K | 1 |
| 238910 | $0 | 2 |
Contract Awards
16 awards found
GAOA HISTORIC GUINAVAH-MALIBU CCC CAMPGROUND & AMPHITHEATRE RECONSTRUCTION. INCLUDES AWARD OF THE BASE, WEST SIDE, EAST SIDE, ASPHALT, AMPHITHEATER (INCLUDING PAVILION, PAD, ELECTRICAL AND FURNISHINGS), INTERPRETIVE TRAIL, AND 4 PAVILION PADS
GAOA HISTORIC GUINAVAH-MALIBU CCC CAMPGROUND & AMPHITHEATRE RECONSTRUCTION. INCLUDES AWARD OF THE BASE, WEST SIDE, EAST SIDE, ASPHALT, AMPHITHEATER (INCLUDING PAVILION, PAD, ELECTRICAL AND FURNISHINGS), INTERPRETIVE TRAIL, AND 4 PAVILION PADS
THIS IS AN URGENT AND COMPELLING CONSTRUCTION SERVICES REQUIREMENT TO REPAIR LIFT STATION LOCATED IN INDIANA DUNES NATIONAL PARK. THIS MODIFICATION IS NEEDED TO PROVIDE $7,450.00 IN ADDITIONAL FUNDING FOR A DIFFERING SITE CONDITION.
THIS IS AN URGENT AND COMPELLING CONSTRUCTION SERVICES REQUIREMENT TO REPAIR LIFT STATION LOCATED IN INDIANA DUNES NATIONAL PARK.
CONSTRUCTION - BOX CULVERT INSTALLATION
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 8: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD ADDITIONAL COSTS ASSOCIATED WITH HELICAL PIER EXTENSIONS NEEDED TO FINISH THE PROJECT. NO OTHER CHANGES ARE BEING MADE AT THIS TIME. MOD
OTHER CONSTRUCTION, FENCE REPLACEMENT
PUMP HOUSE STABILIZATION
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 7: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1- ADD ADDITIONAL COSTS ASSOCIATED WITH HELICAL PIER EXTENSIONS FOR UNANTICIPATED DEPTHS IN ORDER TO ARRIVE AT THE REQUIRED TORQUE SPECIFICATIONS
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 6: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1-ADD ADDITIONAL COSTS ASSOCIATED WITH BOULDERS ENCOUNTERED JUST BELOW THE SURFACE WHICH NECESSITATED THE USE OF HAND-MIXED CONCRETE FOOTINGS ON
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 5: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CHANGE BENCH SUPPORTS TO WEATHERING STEEL SUPPORTS IN LIEU OF WOOD SUPPORTS ON PLANS, 40 SUPPORTS TOTAL FOR 20 BENCHES. NO OTHER CHANGES ARE BEI
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 4: THE PURPOSE OF THIS BILATERAL MODIFICATION IS FOR COFFER DAM, DEWATERING, EXCAVATION, AND INSTALLATION OF CONCRETE PIERS ON NORTH SIDE OF BRIDGE WHERE HELICAL PIERS CANNOT BE USED DUE TO SUBSURFAC
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 2: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1-CORRECT THE SIZE OF DECK SCREWS FROM 2 1/2" TO 3" 2-ADD CURB AND FLATWORK WHERE THE WOOD DECK WAS REMOVED BY THE PARKING LOT (WAS NO
BLUE RIDGE PARKWAY PICNIC TABLE INSTALLATION NORTH CAROLINA
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT MOD 1: THE PURPOSE OF THIS BILATERAL MODIFICATION IS FOR LUMBER UPGRADE FOR DECKING AND CURBING. 2X6X8FT DECKING: QUANTITY FOR ENTIRE PROJECT (5500PCS) X $5.40EA UPCHARGE FOR THE SELECT APPEARANCE = $ 2
GAOA-UWC-SILVER LAKE BOARDWALK REPLACEMENT REPLACEMENT OF EXISTING BOARDWALK AND FISHING PIERS (BASE AND ALL OPTIONS).
Business Details
- UEI
- RPTQCTH9FJ93
- CAGE Code
- 7T3X5
- Address
- 3186 BOOTEN CREEK RD
BARBOURSVILLE, WV 255049441 - Congressional District
- WV-01
- Phone
- 3049624688
Parent Company
NEHEMIAH CONSTRUCTION LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov