NELSON ENGINEERING CO.
MERRITT ISLAND, FLORIDA 329537307
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541620 | $16.47M | 59 |
| 541330 | $16.25M | 152 |
Contract Awards
50 awards found
BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC).
ENGINEERING SERVICES DURING CONSTRUCTION AT THE OPERATIONS AND CHECKOUT(O&C) BUILDING. SWITCHGEAR REPLACEMENT PCN 99311 SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN
BOOSTER FABRICATION FACILITY CHILLER REPLACE SS-1113 A/B ENGINEERING SERVICES DURING CONSTRUCTION (ESDC).
C104631 CALL 10 CS: MATT DUNNE CO: MATT HEAVEY COR: DANIEL WHIPPLE
C100747- DATA DRIVEN FACILITY MANAGEMENT SERVICES
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REVISED NASA UNIFIED FACILITIES GUIDE SPECIFICATION (UFGS) SECTIONS VARIOUS DISCIPLINES AT KENNEDY SPACE CENTER, FLORIDA
CONDUCT A VISUAL INSPECTION OF ALL COMPONENTS (E.G. STRUCTURAL, CIVIL, MECHANICAL, PLUMBING AND ELECTRICAL) FOR EACH ASSET IN APPENDIX I. IDENTIFY AND DOCUMENT CURRENT CONDITION, REMAINING LIFE, DEFERRED MAINTENANCE, AND FUTURE MAINTENANCE REQUIREMEN
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND TRAVEL TO PERFORM A CONDITION ASSESSMENT (CA) AT GEORGE WASHINGTON NATIONAL PARKWAY & NATIONAL MALL & MEMORIAL PARKS (NPS) REAL PROPERTY ASSIGNED TO THE CONCESSIONER UNDER CONCESSION CONT
C104631 - TASK ORDER 1: FACILITY CONDITION RE-ASSESSMENT AND GREEN ASSESSMENT
C109323 - HORIZONTAL INFRASTRUCTURE ASSESSMENTS NIH RML AND RTP CAMPUSES - NGA NGUYEN - 9/29/2020 - 3/31/2022
THE PURPOSE OF THIS TASK ORDER IS TO CONDUCT A CONDITION ASSESSMENT OF NIH OWNED BUILDINGS. THE ASSESSMENT INCLUDES BUILDING STRUCTURE, BUILDING EXTERIOR, BUILDING INTERIOR, HVAC, PLUMBING SYSTEMS, ELECTRICAL SYSTEMS, ELEVATORS, ESCALATORS, AND COMMU
ENGINEERING SERVICES DURING CONSTRUCTION AT THE OPERATIONS AND CHECKOUT(O&C) BUILDING. SWITCHGEAR REPLACEMENT PCN 99311 SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO DO A PUMP HOUSE ALTERNATIVES STUDY AT THE ROTATION, PROCESSING, AND SURGE FACILITY (RPSF) AT KENNEDY SPACE CENTER, FLORIDA
ENGINEERING SERVICES DURING CONSTRUCTION SWITCHGEAR REPLACEMENT AT THE BOOSTER FABRICATION FACILITY
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF), KSC, FL
A&E TASK ORDER FOR ATF STEAM AUGMENTATION
COMPRESSOR 9 DESIGN-BUILD REQUEST FOR PROPOSAL AND FUNCTIONAL REQUIREMENTS DOCUMENT
SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311.
ARCHITECT-ENGINEER SERVICES FOR THE DEVELOPMENT OF A DESIGN PACKAGE (DESIGN-BID-BUILD) FOR THE REFURBISHMENT OF THE BASCULE BRIDGE AT STENNIS SPACE CENTER, MS
ARCHITECT-ENGINEER SERVICES, DESIGN LOW VOLTAGE UPGRADES BOOSTER FABRICATION FACILITY: PROJECT CONTROL NUMBER: 99604
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF), KSC, FL
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) FOR SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 5, KSC, FL
TASK ORDER 80MSFC24FA112 MSFC REVITALIZE ELECTRICAL SYSTEMS BUILDING 4583 BASE AWARD
ARCHITECT-ENGINEER SERVICES FOR THE DEVELOPMENT OF A DESIGN PACKAGE (DESIGN-BID-BUILD) FOR THE REFURBISHMENT OF THE BASCULE BRIDGE AT STENNIS SPACE CENTER, MS
CS - GWMP005 NAMA00 CONDITION ASSESSMENT
ATF LV AFA - ARC FLASH PHASE 2
C100747- DATA DRIVEN FACILITY MANAGEMENT SERVICES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH
C104631 CALL 10 CS: CHRIS HSU CO: ZACH PRICE COR: THOMAS LAWRENCE
ENGINEERING SERVICES DURING CONSTRUCTION SAFETY AND RELIABILITY UPGRADE INSTITUTIONAL POWER SYSTEMS PHASE 4A. MODIFICATION P00003 INCORPORATES TECHNICAL DIRECTIVE-02 AND EXTENDS THE PERIOD OF PERFORMANCE THROUGH OCTOBER 31, 2025.
TASK ORDER 80KSC024FA083 COMPRESSOR STUDIES BASE AND OPTION 1 BASE AWARD (ENTERED IN SAP IN ERROR)
TASK ORDER 80MSFC24FA083 COMPRESSOR STUDIES BASE AND OPTION 1 BASE AWARD
TASK ORDER 80KSC024FA083 COMPRESSOR STUDIES BASE AND OPTION 1 BASE AWARD (ENTERED IN SAP IN ERROR)
DESIGN REFRESH OF SAFE AND RELIABILITY ELECTRICAL UPGRADES, PHASES 5 & 6. MODIFICATION P00004 EXTENDS THE PERIOD OF PERFORMANCE THROUGH JULY 31, 2024, AT NO COST TO THE GOVERNMENT.
C116720 - STRUCTURAL ENGINEERING ASSESSMENT OF EXTERIOR GRATES ON BETHESDA, POOLESVILLE, FT. DETRICK IRF, AND BAYVIEW CAMPUSES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH
ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KENNEDY SPACE CENTER INSTITUTIONAL POWER SYSTEMS, PHASE 4
DESIGN INTERIOR RENOVATIONS AT BOOSTER FABRICATION FACILITY COMPLEX (BFF) AND IN ACCORDANCE WITH TD-08
CAPITAL ASSET MANAGEMENT, BPA CALL 9: GIS DELIVERABLES AT THE GAITHERSBURG, MD CAMPUS AND BOULDER, CO CAMPUS.
ESDC OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, TASK ORDER MODIFICATION TO ADD SCOPE OF WORK
C116720 - STRUCTURAL ENGINEERING ASSESSMENT OF EXTERIOR GRATES ON BETHESDA, POOLESVILLE, FT. DETRICK IRF, AND BAYVIEW CAMPUSES CS: CHRIS HSU CO: ZACH PRICE COR: KYLASH RAMESH
C104631: CALL 9 FACILITY ASSESSMENT SERVICES CS: CHRIS HSU CO: ZACH PRICE COR: NGA NGUYEN
NASA TIERED MAINTENANCE PH III
CAPITAL ASSET MANAGEMENT CONSULTING SERVICES BPA CALL 8: FACILITY CONDITION ASSESSMENT. NIST GAITHERSBURG CAMPUS LOCATED IN MD.
DESIGN REFRESH OF SAFE AND RELIABILITY ELECTRICAL UPGRADES, PHASES 5 & 6.
B301 LN2 STORAGE
ISP STEAM SYSTEM PIPING ANALYSIS AND REMEDIATION PHASE II
ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY RELIABILITY UPGRADE INSTITUTIONAL POWER SYSTEMS PHASE 4. INCORPORATE TECHNICAL DIRECTIVE 02 AND EXTEND PERIOD OF PERFORMANCE TO APRIL 30, 2024.
C100747 DATA-DRIVEN FACILITY MANAGEMENT SERVICES. COR: KYLASH RAMESH CO: MARIO HENRIQUEZ
SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311.
ARCHITECT AND ENGINEER DESIGN FOR LARC ROTOCRAFT TEST STAND (RTS) UNINTERRUPTIBLE POWER SUPPLY (UPS) PROJECT
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDING
Business Details
- UEI
- C8H9ETW9JLV7
- CAGE Code
- 05JM2
- Address
- 5455 N COURTENAY PKWY
MERRITT ISLAND, FL 329537307 - Congressional District
- FL-08
- Phone
- 3214491128
Parent Company
NELSON ENGINEERING CO.
Data Source
This profile is based on federal contract award data from USAspending.gov.