N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
SYRACUSE, NEW YORK 132042801
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541310 | $16.28M | 354 |
| 541330 | $1.59M | 30 |
Contract Awards
50 awards found
CBP PORT ELIZABETH FIRST FLOOR OFFICE BUILDOUT
POST EARTHQUAKE BUILDING STRUCTURE INSPECTION
DOMESTIC WATER SYSTEM STUDY AT RON DE LUGO BUILDING
A/E DESIGN SERVICES FOR AHUS REPLACEMENT PROJECT AT JOSE V. TOLEDO FEDERAL BUILDING AND U.S. COURTHOUSE IN SAN JUAN, PR.
THE MOD IS TO INCORPORATE THE SOW DATED 8/19/25, REASSIGN THE PROJECT'S COR TO JASON LITZ, INCREASES THE AWARD TOTAL TO $115,727.87, EXTEND THE POP COMPLETION DATE TO 10/6/25, AND EXTEND THE ULTIMATE ESTIMATED COMPLETION DATE FROM 11/2/25 TO 12/6/25
CONTRACTOR SHALL COMPLETE PROJECT ACM ABATEMENT AIR MONITORING FOR RENOVATE STE H7, CASE FACILITY, B3, BY PERFORMING SERVICES PER THE SOW DATED 30 JAN 2025 AND CONTRACTOR PROPOSAL SUBMITTED 26 FEB 2025 (HEREBY INCORPORATED BY REFERENCE).
ELECTRICAL EQUIPMENT STUDY LOCATED AT 26 FEDERAL PLAZA & 1 FEDERAL PLAZA NEW YORK, NY 10278.
ADDING WORK WITHIN SCOPE AND TIME EXTENSION
THIS MOD IS TO INCORPORATE THE ATTACHED SOW DATED 8/14/25, INCREASES THE AWARD TOTAL FROM $247,357.82 TO $253,928.02, EXTENDS THE POP COMPLETION DATE FROM 10/27/25 TO 11/28/25, EXTENDS THE ULTIMATE ESTIMATED COMPLETION DATE FROM 12/27/25 TO 1/28/26
THIS MOD IS TO EXERCISE THE OPTION IN THE AMOUNT OF $11,732.59 FOR THE WORK DESCRIBED IN THE ATTACHED SOW DATED 7/15/24 EXTENDS THE POP COMPLETION DATE FROM 6/12/26 TO 12/23/26, EXTEND THE ESTIMATED ULTIMATE COMPLETION DATE FROM 8/12/26 TO 2/23/27
BRIEANT CH FIRE ALARM REPLACEMENT - DESIGN SERVICES CONSTRUCTION PROCUREMENT SERVICES OPTION 1
MOD FOR CLIN 0003 - M&I SERVICES FOR $134,847.49 WITH A NEW CONTRACT VALUE OF $276,757.27. DATE CHANGED FROM 3/27/2026 TO 4/25/2026. EVERYTHING ELSE REMAINS UNCHANGED. AE DESIGN SERVICES, ROOF REPAIRS AT ALMERIC L CHRISTIAN BUILDING, ST CROIX, USVI.
AE SERVICES FOR THE REVISION TO IFC AND PCAS DOCUMENTATION FOR B10 VIVARIUM AIR VALVES AT FDA WHITE OAK IN SILVER SPRING, MD.
AE DESIGN SERVICES - HVAC REPAIRS AT RON DE LUGO FEDERAL OFFICE BUILDING, SAINT THOMAS, USVI.
AIR MONITORING SERVICES FOR REPAIR REPLACE HVAC SYSTEM C-D BAY, B3
THE ARCHITECT AND ENGINEER (AE) FIRM SHALL PERFORM ACM ABATEMENT AIR MONITORING FOR REPAIR PATTERN SHOP, B101 IN ACCORDANCE WITH THE STATEMENT OF WORK AND CONTRACTOR QUOTE.
A/E SERVICES FOR THE MLK COURTHOUSE HARDENING DESIGN PROJECT AT THE MLK COURTHOUSE IN NEWARK, NEW JERSEY.
THE ARCHITECT/ENGINEER (A/E) FIRM SHALL PERFORM TITLE II SERVICES IN ACCORDANCE WITH THE STATEMENT OF WORK FOR RENOVATE SUITE H7, CASE FACILITY
THE ARCHITECT/ENGINEER (A/E) FIRM SHALL PERFORM AE SERVICES FOR HBM ABATEMENT DESIGN ROOF AREAS 1/2/3/4, B3 IN ACCORDANCE WITH THE STATEMENT OF WORK AND CONTRACTOR QUOTE.
TO EXERCISE M & I SERVICES OPTION FOR THE ELEVATORS MODERNIZATION PROJECT AT RON DE LUGO FOB AND USCHSE IN STT USVI.
THIS MOD IS TO INCORPORATE THE ATTACHED SOW DATED 5/28/25. THIS MOD INCREASES THE AWARD TOTAL FROM $229,720.82 TO $247,357.82, EXTENDS THE POP COMPLETION DATE FROM 8/28/25 TO 10/27/25 AND EXTENDS THE ULTIMATE COMPLETION DATE FROM 10/28/25 TO 12/27/25
MODIFICATION ADDING M&I SERVICES TO LAUTENBERG PROJECT - NEW YORK, NY
BRIEANT CH FIRE ALARM REPLACEMENT - DESIGN SERVICES - ADD P100 RESCISSION DESIGN CHANGES
DCMA BINGHAMTON CONSOLIDATION PROJECT - RFP # 02-VALUE ENGINEERING CHANGES
BUILDING H- AQUACULTURE DESIGN- ADDITIONAL PCAS SERVICES TO ASSIST IN THE COMPLETION OF THE CONSTRUCTION.
ADD 52 WEEKS M&I SERVICES
ADDING ADDITIONAL M&I SERVICES
ACM SURVEY/DESIGN SITE
LAUTENBERG - CHAMBERS 411 - DESIGN - NEWARK, NJ
MODIFICATION TO INCLUDE COMMISSIONING SERVICES FOR THE NEW FDA LAB LOCATED AT THE DENVER FEDERAL CENTER IN LAKEWOOD, CO BUILDING 22
A-E M AND I SERVICES FOR THE 3RD AND 4TH FLOOR LABS RENOVATION COLLEGE PARK, MD
THE PURPOSE OF THIS AWARD IS TO PROVIDE A/E SERVICES FOR DEGETAU PHASE II STUDY, HATO REY, PR.
THE PURPOSE OF THIS ADMINISTRATIVE ACTION IS TO DEOBLIGATE RESIDUAL FUNDS IN THE AMOUNT OF ($72,913.49). THE CONTRACTOR'S RELEASE OF CLAIMS AND FINAL INVOICE HAVE BEEN RECEIVED.
TO PROCESS THE VERBAL NTP SENT 3/31/2025 DEOBLIGATE $27,392.00 FROM CLIN 0003 AND CHANGE THE AMOUNT FROM $210,190.27 TO $182,798.27 ACCEPT ADDITIONAL AC-5 WORK FOR $13,477.60 IN CLIN 0016 W/O THE ORIGINAL LINE TOTAL OF $35,726.58. R2 TAB CARES ACT
MOD PS0002 ISSUED TO OBLIGATE FUNDING IN THE AMOUNT OF $164,054.64 TO INCORPORATE COSTS FOR CHANGES TO THE ORIGINAL DESIGN REQUIREMENTS AS WELL AS ADDITIONAL BASE SCOPE DESIGN DEVELOPMENTS. ROOSEVELT USCH
A/E HARDENING DESIGN PROJECT AT CHARLES BRIEANT USCH, 300 QUARROPAS ST WHITE PLAINS, NY
THE HANLEY VBA 5TH FLOOR- DESIGN AWARD IN THE AMOUNT OF $99,758.87 FOR THE WORK DESCRIBED IN THE SOW DATED 8/02/24 LOCATED IN SYRACUSE, NY WAS AWARDED TO NKB. THE POP COMPLETION DATE IS 9/2/25.
AE SERVICES FOR DEMOLISH FACILITY, B19
CONTRACTOR SHALL COMPLETE PROJECT ACM ABATEMENT AIR MONITORING FOR RENOVATE STE H7, CASE FACILITY, B3, BY PERFORMING SERVICES PER THE SOW DATED 30 JAN 2025 AND CONTRACTOR PROPOSAL SUBMITTED 26 FEB 2025 (HEREBY INCORPORATED BY REFERENCE).
THIS MOD IS TO INCORPORATE THE ATTACHED SOW DATED 12/10/2024 FOR THE KEATING CHAMBERS 2530 RENOVATIONS- DESIGN & AE M&I SERVICES CONTRACT LOCATED IN THE KENNETH B. KEATING FEDERAL BUILDING. THE AWARD TOTAL INCREASES TO $166,193.73
AE SERVICES FOR REGION 2 HVAC CARES ACT - FOLEY SCOPE REDUCTION DECOMMITMENT, 20 WASHINGTON & FOLEY RETURN TRIP ADJUSTMENT, & BINGHAMTON AWARD 0013 $10,201.95, 0019 $21,287.79, 0009 $140,400.60, 0016 $35,726.58 0018 $29,933.59, 0021 $11,922.78
DCMA BINGHAMTON CONSOLIDATION PROJECT - COST TRANSFER DEOBLIGATION OF EXCESS FUNDS
MODIFICATION TO DESCOPE $0.04.
THE AWARD FOR THE KEATING HARDENING PHASE II- DESIGN PROJECT LOCATED IN ROCHESTER, NY FOR THE TOTAL OF $166,178.95 IS FOR THE WORK DESCRIBED IN THE SOW DATED 11/21/24. THE PERIOD OF PERFORMANCE COMPLETION DATE IS 7/30/25.
DCMA BINGHAMTON CONSOLIDATION PROJECT COST TRANSFER AND NO COST TIME EXTENSION
A/E DESIGN & ELECTRICAL CHANGES TO USBP SPACE AT KEATING FEDERAL BUILDING, 100 STATE ST, ROCHESTER, NY 14614. POP: 70 DAYS
THE MOD IS TO INCORPORATE THE ATTACHED SOW DATED 2/06/25 FOR THE KEATING SECURITY UPGRADES- AE M&I PROJECT. THIS MOD INCREASES THE AWARD TOTAL FROM $223,665.82 TO $229,720.82, EXTENDS THE PERIOD OF PERFORMANCE COMPLETION DATE FROM 5/30/25 TO 8/28/25
PURPOSE OF THIS MOD IS TO DESCOPE A/E SVS FOR OPTION 6-JAMES T. FOLEY USPO & CT HOUSE (CLIN 0007) PER RFP 2 IN THE AMT OF $122,075.56. RESULT OF THIS CHANGE, CLIN AMOUNT DECREASED $292,994.81 TO $170,919.25 & FUNDS ARE DEOBLIGATED TO $122,075.56.
1) THE PERIOD OF PERFORMANCE (POP) IS HEREBY CHANGED FROM 01/13/2025 TO 04/25/2025. 2) THE TOTAL CONTRACT VALUE IS CHANGED BY $7,464.23 FROM $120,555.43 TO $128,019.66. 3) ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
TANNER HILL TITLE II
Business Details
- UEI
- WUDXF35LUMN6
- CAGE Code
- 02ZY8
- Address
- 1005 W FAYETTE ST STE 4A
SYRACUSE, NY 132042801 - Congressional District
- NY-22
- Phone
- 3154281177
Parent Company
N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov