PONCIANO CONSTRUCTION, INC.
SANTEE, CALIFORNIA 920714638
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $7.75M | 100 |
| 238990 | $-7,212.2 | 17 |
Contract Awards
47 awards found
MODIFICATION PS0007 FOR DOOR KEYING AND PASSAGE HARDWARD FOR USPO 4TH FLOOR AT RONALD REAGAN FEDERAL BUILDING AND U.S. COURTHOUSE AT 411 W. 4TH STREET, SANTA ANA, CA 92701
MODIFCIATION PS0003 IS TO INCLUDE REQUEST MADE BY JUDGE DESAI FOR A COA RWA FUNDED PROJECT FOR DESAI CHAMBERS REMODEL, SANDRA DAY OCONNOR COURTHOUSE, 401 W WASHINGTON ST, PHOENIX, AZ
MODIFICATION PS0006 FOR NEW REPLACEMENT DOOR AT INTERVIEW ROOM FOR USPO 4TH FLOOR AT RONALD REAGAN FEDERAL BUILDING AND U.S. COURTHOUSE AT 411 W. 4TH STREET, SANTA ANA, CA 92701
THIS PROJECT IS TO REPLACE THE IRS DOORS IN THE TUCSON FEDERAL BUILDING.
MODIFICATION PS0004 FOR DOOR ELECTRICAL OBSTRUCTIONS FOR USPO 4TH FLOOR AT RONALD REAGAN FEDERAL BUILDING AND U.S. COURTHOUSE AT 411 W. 4TH STREET, SANTA ANA, CA 92701
RECONFIGURE THE OTAY MESA LPOE SOUTHBOUND GATE AT 9777 VIA DE LA AMISTAD., SAN DIEGO, CA 92154.
MODIFICATION PS0004 FOR ADDITIONAL CARPET REPLACEMENT, ADDITIONAL SECURITY SYSTEMS WORKS, AND ADDITIONAL ELECTRICAL OUTLET IN BREAKROOM FOR USPS 4TH FLOOR AT RONALD REAGAN FEDERAL BUILDING AND U.S. COURTHOUSE, 411 W. 4TH ST., SANTA ANA, CA 92701.
PS0001 IS TO ADD ADDITIONAL DESIGN SERVICES AND CONSTRUCTION NEEDS PER AGENCY REQUEST TO ISSUE A TIME EXTENSION TO INCORPOATE THE CBS TO THE AWARD FOR DESAI CHAMBERS REMODEL, SANDRA DAY O CONNOR COURTHOUSE, 401 W WASHINGTON ST, PHOENIX, AZ
DECONCINI LPOE- CUSTOMS HOUSE: 9 N. GRAND AVE. NOGALES AZ 85621. TEAR DOWN AND REMOVE EXISTING FPS BOOTH. RELOCATE NEW BOOTH FROM STORAGE TO SAME AREA AND CONNECT REQUIRED UTILITIES.
WORK TO PROGRAM THE NEW LOCK TO THE DOOR. THIS WAS UNFORSEEN AND NOT INCLUDED IN THE ORIGINAL SCOPE FOR THE LAN ROOM EXPANSION AT LUKEVILLE LPOE, AZ
AWARD - LDG FIRST IMPRESSIONS PROJECT AND NEW GUARDS STATION, LLOYD GEORGE COURTHOUSE, 333 S LAS VEGAS BLVD, LAS VEGAS, NV
TO RELOCATE CONDUIT TO BRING OFFICE TO CODE FOR THE LAN ROOM EXPANSION PROJECT LUKEVILLE AZ
DESAI CHAMBERS REMODEL, SANDRA DAY O CONNOR COURTHOUSE, 401 W WASHINGTON ST, PHOENIX, AZ
MODIFICATION TO ADD ADDITIONAL TROUBLESHOOTING AND REPAIR BASED ON UNFORSEEN CONDITIONS.
JOHN M ROLL CRAC UNIT REPLACEMENT, JOHN M. ROLL COURTHOUSE, YUMA, AZ 85364
DESIGN BUILD FOR THE DEPARTMENT OF HEALTH AND HUMAN SERVICES (HHS) - OFFICE OF THE INSPECTOR GENERAL (OIG) RELOCATION AND BUILDOUT, SCHWARTZ FEDERAL BUILDING & US COURTHOUSE, 880 FRONT ST., SAN DIEGO, CA 92101
PROJECT INCLUDES DEMOLITION, RELOCATE HVAC & LIGHTING FIXTURES. REPLACE CEILING TILES, CARPET, AND BASEBOARD. TENANT IMPROVEMENTS AT THE RONALD REAGAN FEDERAL BUILDING AND U.S. COURTHOUSE, USPO 4TH FLOOR, SANTA ANA, CA 92701
THE PURPOSE OF THIS PROJECT IS TO REPAIR THE SALLYPORT CURTAIN TRACK AND KEY STATION FOR ICE AT 880 FRONT STREET, SAN DIEGA, CA 92101.
AWARD OF 47PK1724F0027 - DEA 20TH FLOOR CONFERENCE ROOM AC UNIT REPLACEMENT
LAN ROOM EXPANSION PROJECT AT LUKEVILLE LPOE, LUKEVILLE AZ
DOOR & HVAC SIGNAGE
THIS PROJECT IS FOR FURNITURE ADDITION AND ELECTRICAL CABLING INSTALLATION
ATRIUM REPAIRS AT FBI BUILDING ON CHARLESTON IN LAS VEGAS, NV
INSTALLATION OF 2 AC SPLIT SYSTEMS IN DEA HUB ROOM 1841. ROYBAL FEDERAL BUILDING, 255 EAST TEMPLE ST. LOS ANGELES, CA 90012
PS0004 IS TO INCLUDE ADDITIONAL WORK FOR A NEW OUTLET ABD RELOCATE ADA PARKING STALL FOR THE WLA GYM EXTENSION AT 1260 SOUTH SEPULVEDA BLVD., LOS ANGELES, CA.
DB DEPARTMENT OF HEALTH AND HUMAN SERVICES (HHS) OFFICE OF THE INSPECTOR GENERAL (OIG) RELOCATION AND BUILDOUT, SCHWARTZ FEDERAL BUILDING, 880 FRONT ST., SAN DIEGO, CA 92101
MOD PS0001 IS TO INCLUDE ADDITIONAL WORK FOR ADA COMPLIANCE FOR GYM USAGE AT 1260 SOUTH SEPULVEDA BLVD., LOS ANGELES, CA.
THE BUILD AND REMODEL OF A LACTATION ROOM AT THE SAN LOUIS II LPOE
BIA VEHICLE GATE AT CARSON CITY FB, NV - MOD FOR CAMERA PROGRAMMING
MOD PS0003 IS TO ADD DOOR STOPPERS PER USBC'S REQUEST FOR THIS PROJECT AT ROYBAL FEDERAL BUILDING, 255 E TEMPLE ST., LOS ANGELES, CA.
MODIFICATION PS0004 - ASBESTOS ABATEMENT
PS02 IS FOR CHANGE ORDER 1 TO INSTALL CORNER GUARDS FLUSHED AGAINST THE COVE BASE FOR THE USBC AND GSA CARPET PROJECT AT ROYBAL FEDERAL BUILDING, 255 E TEMPLE ST, LOS ANGELES, CA
PROJECT IS TO EXPAND ON THE WLA GYM FOR THE FBI LOCATED AT 1260 S SEPULVEDA BLVDLOS ANGELES, CA 90025
MODIFICATION ISSUED FOR ADDITIONAL WORK TO INCREASE $17,605.82 FROM $328,447.23 TO $346,053.05 FOR THICKER CONCRETE AND UNFORESEEN ACM LOCATED AT COA, 125 S. GRAND AVE., PASADENA, CA.
SECURITY FENCE EXTENSION PROJECT
RELOCATE AND REINSTALL CABLE MANAGAMENT SYSTEM AND PATCH PANELS FROM 1927 TO 1926 FOR THE IRS AT 4041 N CENTRAL AVE. PHOENIX AVE. 85012.
BIA VEHICLE GATE AT CARSON CITY FEDERAL BUILDING
47PK0122F0003, MOD PS0002 - PCO 01 BIRD NETTING
SCHWARTZ FOB CAFETERIA REFRIGERATOR REPAIR, SAN DIEGO, CA
TOWER WATERPROOFING AT COA 125 S. GRAND AVE., PASADENA, CA 91105
ABAAS ACCESS RAMP INSTALLATION
GSA-USBC CORRIDORS CARPET REPLACEMENT AT THE EDWARD R. ROYBAL FEDERAL BUILDING, 255 E TEMPLE ST, LOS ANGELES, CA 90012
CBP TRAINING ROOM UPGRADES AT DECONCINI LPOE IN NOGALES, AZ.
CONTRACT IS PROVIDE TENEANT IMPROVEMENTS FOR USMS AT THE RRCH 11 W 4TH ST, SANTA ANA, CA 92701
REPAIR PROJECTS AT DOUGLAS AND NACO LPOES IN AZ: KENNEL OFFICE AC, TOUCHLESS FAUCETS AND SINKS, AND HANDRAIL REPLACEMENT.
PCO 05 ELECTRICAL WIRING& CONDUIT REPLACEMENT DE-OB MOD
DEOBLIGATE MINIMUM GUARANTEE FOR REGION 09 CONSTRUCTION IDIQ CONTRACT, BECAUSE THE CONTRACTOR HAS RECEIVED A TASK ORDER.
Business Details
- UEI
- YJGTUP1W3JX9
- CAGE Code
- 4NMH1
- Address
- 8402 N MAGNOLIA AVE STE B
SANTEE, CA 920714638 - Congressional District
- CA-48
- Phone
- 6193286381
Parent Company
PONCIANO CONSTRUCTION, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov