Contract Awards
50 awards found
MODIFICATION TO CANCEL THE TASK ORDER DUE TO CHANGE IN BASE CONTRACT AND CHANGE IN CONTRACTOR FOR SERVICES
MODIFICATION TO CANCEL THE TASK ORDER DUE TO CHANGE IN BASE CONTRACT AND CHANGE IN CONTRACTOR FOR SERVICES
THE PURPOSE OF THIS MODIFICATION IS FOR THE 6 MONTH EXTENSION WAGE ADJUSTMENT LUMP SUM PAYMENT FOR O&M SERVICES AT SHREVEPORT, ALEXANDRIA, AND TEXARKANA, TX.
MODIFICATION FOR NO-COST TERMINATION AGREEMENT FOR O&M SHREVEPORT, MONROE, ALEXANDRIA AND FM SERVICES TEXARKANA.
TASK ORDER FOR EMERGENCY MONROE CHILLER BOARD REPAIR AT MONROE FEDERAL COURT HOUSE (LA0029ZZ)
TASK ORDER TO REPAIR ELEVATORS IN TEXARKANA FEDERAL COURTHOUSE / US POST OFFICE LOCATION.
FACILITIES MAINTENANCE, CUSTODIAL, AND GROUNDS SERVICES IN THE NORTHERN LOUISIANA AND TEXARKANA AREAS.
THIS MODIFICATION IS TO DEOBLIGATE THE HIGH TOUCH CLEANING SERVICES FROM THE REMAINING 2 MONTHS OF THE CONTRACT (03/01/2025 THROUGH 4/30/2025).
MODIFICATION TO CANCEL DEOBLIGATED AWARD 47PH0220D0010 PS0023 AND CORRECT THE ACCOUNTING STRINGS
MODIFICATION TO DEOBLIGATE FUNDING FOR HIGH TOUCH CLEANING FROM THE FINAL 4 MONTHS OF THE CONTRACT. THIS MODIFICATION MOVES HIGH TOUCH CLEANING SERVICES TO ABOVE STANDARD SERVICES.
MODIFICATION TO DEOBLIGATE FUNDING FOR THE TASK ORDER CLOSEOUT
MODIFICATION TO DEOBLIGATE FUNDS FOR TASK ORDER CLOSEOUT
MODIFICATION TO DEOBLIGATE FUNDING FOR A TASK ORDER TO CLOSEOUT THE AWARD.
TASK ORDER TO REPLACE A FAULTY CHECK VALVE ON FIRE ALARM SYSTEM AT LA0098ZZ
TASK ORDER TO SUPPORT THE TEXARKANA - WATER TESTING RESPONSE CORRECTIVE ACTION AT LA0002ZZ.
TASKORDER TO REMOVE AND REPLACE CIRCUIT BOARDS ON CHILLER 1 FOR SHREVEPORT FEDERAL COURTHOUSE LA0098ZZ
MODIFICATION TO DEOBLIGATE FUNDS FOR THE REPAIR OF DAMAGES TO ELEVATOR DOORS.
MODIFICATION FOR 6 MONTH EXTENSION AND TO ADD ADDITIONAL EQUIPMENT TO MONROE FEDERAL COUTHOUSE.
EMERGENCY PURCHASE OF DIESEL FUEL FOR CSP GENERATORS.
EMERGENCY VNTP FOR REPLACEMENT OF FAILED CPU FOR CHILLER 1
EMERGENCY VNTP FOR REPLACEMENT OF THE BAS TANGENT IN ALEXANDRIA FEDERAL COURTHOUSE, (LA0002ZZ).
TASK ORDER FOR AUDIO CARD REPLACEMENT AT THE TOM STAGG FEDERAL COURTHOUSE.
TASK ORDER TO REPAIR PIPING IN THE JUDGES CHAMBERS AND BASEMENT OF THE ALEXANDRIA FEDERAL BUILDING.
EQUITABLE ADHUSTMENT TO SUPPORT 47PH0220D0010 AND CONTRACT OFFICER CHANGE NOTIFICATION.
MODIFICATION TO DEOBLIGATE FUNDING FROM A CANCELLED TASK ORDER.
THE PURPOSE OF THIS TASK ORDER IS TO FULLY FUND WATER FLUSHING AND SAMPLING AT AR0057ZZ, LA0098ZZ, LA0002ZZ AND LA0029ZZ LOCATIONS.
TO INSTALL THE FIRE SYSTEM COMMUNICATOR AT TOM STAGG FOB LA0098ZZ AS DEFINED IN THIS PERFORMANCE WORK STATEMENT.
TASK ORDER TO REPLACE THE IGV VALVE ON SMARDT CHILLER #1 AT THE ALEXANDRIA FEDERAL COURTHOUSE LA0002ZZ
MODIFICATION TO EXTEND THE OPTION YEAR IV FOR SHREVEPORT, MONROE, AND ALEXANDRIA O&M AND CUSTODIAL SERVICES.
REPLACE THE DRAIN PANS UNDER AHU 4-2.
CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR, TOOLS, MATERIALS AND EQUIPMENT TO COMPLETELY INSTALL A NEW WATER FOUNTAIN / BOTTLE FILLING STATION IN THE TYLER COURTHOUSE.
TASK ORDER TO REMOVE AND REPLACE EXISTING RISER VALVES AT THE WILLIAM M. STEGER BUILDING
CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR, TOOL, EQUIPMENT AND MATERIALS TO COMPLETELY REPAIR THE ROOF UNDER THE COOLING TOWER WHERE IT IS DAMAGED WITH A THREE STEP LIQUID APPLIED MATERIAL.
TASK ORDER TO FURNISH LABOR AND MATERIAL TO REMOVE EXISTING EXHAUST FAN AND REPLACE WITH NEW EXHAUST FAN PER THE PERFORMANCE WORK STATEMENT.
EMERGENCY NOTICE TO PROCEED FOR REPLACING CHILLER #2 COMPUTER PROCESSING UNIT AT TEXARKANA FEDERAL COURTHOUSE AND POST OFFICE.
EMERGENCY NOTICE TO PROCEED FOR REPLACEMENT OF COOLING TOWER AND STRUCTUAL SUPPORT REPLACEMENT AT TOM STAGGS COURTHOUSE AND BUILDING
REMOVE EXISTING CHILLED WATER PUMP AND MOTOR AND INSTALL NEW PUMP AND MOTOR AT TYLER COURTHOUSE, TYLER, TX TX0182TY
REMOVE EXISTING CHILLER CENTRAL PROCESSING UNIT AND INSTALL NEW CENTRAL PROCESSING UNIT AT THE TYLER COURTHOUSE, TYLER, TX (TX0182TY)
ADDITIONAL FUNDS ADDED TO TASK ORDER 47PH0222F0227 IN THE AMOUNT OF $2,180 TO SUPPORT THE MONROE METERING PROJECT.
ADDITIONAL FUNDS ADDED TO TASK ORDER 47PH0222F0228 IN THE AMOUNT OF $2,180 TO SUPPORT THE LUFKIN METERING PROJECT.
ADDITIONAL FUNDS ADDED TO TASK ORDER 47PH0222F0226 IN THE AMOUNT OF $2,180 TO SUPPORT THE ALEXANDRIA METERING PROJECT.
REPLACE AN EYEWASH STATION AT SHREVEPORT, LOUISIANA COURTHOUSE, BUILDING LA0098ZZ.
MODIFICATION TO EXTEND PERIOD OF PERFORMANCE TO 2/28/2023, INCORPORATE A REVISED QUOTE, AND REDUCE THE ORDER VALUE FOR CHILLER FAN REPLACEMENTS AT THE ALEXANDRIA COURTHOUSE IN ALEXANDRIA, LA.
TO REPLENISH THE FREON IN CHILLER 1 TO THE PROPER LEVEL FOR NORMAL OPERATIONS AT THE TOM STAGGS FEDERAL COURTHOUSE AND BUILDING. (LA0098ZZ).
OPTION YEAR IV FOR FULL MAINTENANCE SERVICES (FM) FOR EAST TEXAS AREA. NEW PERIOD OF PERFORMANCE IS 12/1/2022 - 11/30/2023.
EXERCISE OPTION YEAR III OPERATIONS AND MAINTENANCE AT SHREVEPORT, MONROE, ALEXANDRIA- FULL MAINTENANCE AT TEXARKANA.
ROOF REPAIR AT THE TYLER TEXAS COURTHOUSE. PERIOD OF PERFORMANCE 9/9/22 TO 11/11/22.
THE O&M CONTRACTOR ROWE CBFS JVC, LLC WILL PROVIDE ALL SUPERVISION, LABOR, EQUIPMENT, AND MATERIALS TO REPLACE 4 CONDENSER FAN MOTORS LOCATED AT LA0002ZZ
THE O&M CONTRACTOR ROWE CBFS JVC, LLC WILL PROVIDE ALL SUPERVISION, LABOR, EQUIPMENT, AND MATERIALS TO REPLACE #1 CHILLER FAN AT ALEXANDRIA COURTHOUSE.
THE PURPOSE OF THIS AWARD IS TO PERFORM REPLACE METERING SYSTEM AT LUFKIN WARD R BURKE COURTHOUSE AT LUFKIN, TX, 75901 WITH A PERIOD OF PERFORMANCE OF 08/30/2022 - 09/30/2022.
Business Details
- UEI
- PUKMFZ9PA8D3
- CAGE Code
- 7NF25
- Address
- 548 HEAVENS DR
STE 24
MANDEVILLE, LA 704712832 - Congressional District
- LA-01
- Phone
- 9418038401
Parent Company
ROWE-CBFS JV, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov