SES CIVIL AND ENVIRONMENTAL LLC
MERRITT ISLAND, FLORIDA 329534034
Contract Awards
50 awards found
VEHICLE ASSEMBLY BUILDING (VAB) K&L TOWER RESTROOM & JANITOR CLOSETS
REPLACE SILENCERS WITH OXIDATION CATALYSTS AT PAD PUMPHOUSE.
VEHICLE ASSEMBLY BUILDING (VAB) K&L TOWER RESTROOM & JANITOR CLOSETS
SANITARY SEWER INFILTRATION REPAIR PROJECT AT KENNEDY SPACE CENTER, FL. MOD 7: INCORPORATES TRACKING NUMBER (TN)-06, SANITARY SEWER INFILTRATION INTO CONTRACT.
REPLACE SILENCERS WITH OXIDATION CATALYSTS AT PAD PUMPHOUSE. THIS MODIFICATION INCORPORATES TECHNICAL NARRATIVE 01 REPLACE PUMP #2
ELECTRICAL VEHICLE CHARGER INSTALLATION PHASE II AT MULTIPLE LOCATIONS AT KENNEDY SPACE CENTER CONTRACT. MOD 4 INCORPORATES REA-01 CANCELLED OUTAGE AND MISSING BRACKET.
NE020 ADDITIONAL WORK FOR DAMES SITE 2 NE021 PAINT BUILDINGS IN HANGAR 2
SANITARY SEWER INFILTRATION REPAIR PROJECT AT KENNEDY SPACE CENTER, FL. MOD 6: INCORPORATES TRACKING NUMBER (TN)-05, SANITARY SEWER INFILTRATION INTO CONTRACT.
NE018 DAMES SITE 2 ADDITIONS NE019 B3046 SEWER LINE REPAIR
TASK ORDER FOR BUILDING J6-0490 REPLACE BUILT UP ROOF - TN-01 REMOVE RUST FROM 3 EMBEDS ON EXISTING ROOF FRAMING
NE017 B3046 LOWER ELECTRICAL SERVICE ENTRANCE
AWARDED UNDER SMALL TASK ORDER CONSTRUCTION CONTRACT (STOCC) TO J7-0241, REMOVE AND REPLACE THE ROOF AND INSTALL HEATING AND VENTILATION AIR CONDITIONING (HVAC) SYSTEM.
SMALL TASK ORDER CONSTRUCTION CONTRACT (STOCC) TO REPLACE LIGHTING IN MULTIPLE FACILITIES AS PART OF ENERGY CONSERVATION MEASURES.
SANITARY SEWER INFILTRATION REPAIR PROJECT AT KENNEDY SPACE CENTER, FL. MOD 5: INCORPORATES TRACKING NUMBER (TN)-04, SANITARY SEWER INFILTRATION INTO CONTRACT.
NE016 CAB DRAINAGE IMPROVEMENTS
PCN 100282 VAB K&L TOWER RESTROOM & JANITOR CLOSETS
SANITARY SEWER INFILTRATION REPAIR PROJECT AT KENNEDY SPACE CENTER, FL. MOD 4: INCORPORATES TRACKING NUMBER (TN)-03, SANITARY SEWER INFILTRATION INTO CONTRACT.
NE012 B3047 CONTROL ROOM CONSTRUCTION
UPGRADE MISSILE GRADE AIR AT BOOSTER FABRICATION FACILITY. P00013: INCORPORATES TRACKING NUMBER 15B INSTALL INLINE FILTERS.
SANITARY SEWER INFILTRATION REPAIR PROJECT AT KENNEDY SPACE CENTER, FL. MOD 3: INCORPORATES TRACKING NUMBER (TN)-02, SANITARY SEWER INFILTRATION INTO CONTRACT.
NE015 REPAIR DRAINAGE BEHIND 5019
GD004 TOWER 8551 STRUCTURAL MEMBERS
AWARD TASK ORDER FOR BUILDING J6-0490 REPLACE BUILT UP ROOF.
NE013 DAMES ARRAY
GATE 3 CONCRETE REPAIRS AT THE KENNEDY SPACE CENTER, FL. INCORPORATES REQUEST FOR EQUITABLE ADJUSTMENT 01 (REA-01) TO THE TASK ORDER AND COMPLETION DATE REMAINS A 5/10/2024.
GATE 3 CONCRETE REPAIRS AT THE KENNEDY SPACE CENTER, FL. INCORPORATES TECHNICAL NARRATIVE (TN-01A) ESTABLISHES A 5/10/2024 COMPLETION DATE.
NE014 COLUMBIA ROAD REPAIRS
UPGRADE MISSILE GRADE AIR AT BOOSTER FABRICATION FACILITY. P00012: INCORPORATES TRACKING NUMBER 15A PURCHASE INLINE FILTERS.
AWARD OF PCN 100244 L6-0247 PREP AND PAINT BFF BSM CELL AND ORDINANCE ROOM, AT THE KENNEDY SPACE CENTER, FL
REPLACE INOPERABLE FACILITY AIR CONDITIONING AT MULTI-MEDIA BLAST FACILITY (MMBF) AT KENNEDY SPACE CENTER, FLORIDA.
UPGRADE MISSILE GRADE AIR AT BOOSTER FABRICATION FACILITY. P00011: INCORPORATES TASK NUMBER 14 REMOVE AND REINSTALL DROPS 3 & 4.
VEHICLE ASSEMBLY BUILDING (VAB) NORTH TOWER RESTROOM RENOVATIONS: MOD 4: INCORPORATE REQUEST FOR EQUITABLE ADJUSTMENT FOR 01 ABATEMENT AND 02 ANCHORS.
UPGRADE MISSILE GRADE AIR AT BOOSTER FABRICATION FACILITY. P00010: INCORPORATES TASK NUMBER 12 FILTER SWAP AND TASK NUMBER 13 REMAINING FILTER SWAP. EXTENDED PERIOD OF PERFORMANCE TO MARCH 27, 2024.
SANITARY SEWER INFILTRATION REPAIR PROJECT AT KENNEDY SPACE CENTER, FL. MOD 2: INCORPORATES TRACKING NUMBER (TN)-01, SANITARY SEWER INFILTRATION INTO CONTRACT.
NE008 B3296 MODELING & SIMULATION LAB RENO
MODIFY HIGH BAY 2 FOR SPACE LAUNCH SYSTEM CORE STAGE MOD 11: INCORPORATE REQUEST FOR EQUITABLE ADJUSTMENT (REA).
REPAIR SUNKEN CONCRETE AT PARKING LOT 1 AND 66340 BLAST BOOTH FLOOR. MOD 3: INCORPORATES TRACKING NUMBER (TN)-01.
NE010 TEST SECTION ROADWAY REPAIR
NE002 ATS UPGRADE
MODIFY HIGH BAY 2 FOR SPACE LAUNCH SYSTEM CORE STAGE MOD 10: INCORPORATE TRACKING NUMBER (TN)-09 DEMOLITION DAMAGED BOLTS.
GD003 TOWER 9426 OBSTRUCTION LIGHTING CONDUIT
UPGRADE MISSILE GRADE AIR AT BOOSTER FABRICATION FACILITY. P00007: INCORPORATES TRACKING NUMBER (TN)-11 ADDITIONAL CHECK VALVES AND RAMP IN THE AMOUNT OF $2,773.
MODIFY HIGH BAY 2 FOR SPACE LAUNCH SYSTEM CORE STAGE MOD 9: INCORPORATE TRACKING NUMBER (TN)-08 ENGINEERING SERVICE DURING CONSTRUCTION OF FOUNDATION OF FLOOR.
ELECTRICAL VEHICLE CHARGER INSTALLATION PHASE II AT MULTIPLE LOCATIONS AT KENNEDY SPACE CENTER CONTRACT. INCORPORATION OF TECHNICAL NUMBER (TN) 01A AND EXTENDING COMPLETION DATE TO 8/02/2024.
CORROSION CONTROL FOR PRE-ENGINEERED METAL BUILDINGS M7-1354B AND M7-1355. INCORPORATE TRACKING NUMBER (TN)-03. CONTRACT VALUE WILL INCREASE, AND CONTRACT REMAINS WITH END DATE OF 10/30/2023.
CORROSION CONTROL FOR PRE-ENGINEERED METAL BUILDINGS M7-1354B AND M7-1355. INCORPORATE TRACKING NUMBER (TN)-04. CONTRACT VALUE WILL INCREASE, AND CONTRACT REMAINS WITH A POP END DATE OF 10/30/2023.
OPERATIONS SUPPORT BUILDING 2 LOBBY RENOVATION. MOD 8: INCORPORATE TRACKING NUMBER 06 LED SCREEN PANEL CIRCUITS IN THE AMOUNT OF $18,674.
REPLACE SILENCERS WITH OXIDATION CATALYSTS AT PAD PUMPHOUSE.
NE007 ERDC GSL ASPHALT TEST SECTION
SANITARY SEWER INFILTRATION REPAIR AT KENNEDY SPACE CENTER, FL.
Business Details
- UEI
- C1CGMDVZSNJ6
- CAGE Code
- 7UPE1
- Address
- 2395 N COURTENAY PKWY STE 204
MERRITT ISLAND, FL 329534034 - Congressional District
- FL-08
- Phone
- 8654817837
Parent Company
SES CIVIL AND ENVIRONMENTAL LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.