SKY BLUE RME JV LLC
AURORA, COLORADO 800101043
Contract Awards
50 awards found
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, AND SUPERVISION NECESSARY TO PERFORM SLURRY SEAL, RESTRIPING, CRACK REPAIR AND POTHOLE REPAIR IN THE TWO PARKING LOTS AND THE DRIVE LANE AT B1030, THE EAST PARKING LOT OF B
COMMAND CENTER RE-PAVE PROJECT AT PETERSON SFB. POP IS 240 DAYS AFTER NTP.
DPW24-017 RPR NELSON BLVD AT VISITOR CENTER AND HARR
DEMOLISH LAKE WILLIAMS AND DAM TO BE COMPLETED IN THREE PHASES TO INCLUDE PRE-CONSTRUCTION PLANNING, DEMOLITION, AND RE-CONSTRUCTION OF NEW STORM WATER CHANNELS, SCULPTED CONCRETE DROP STRUCTURES, A NEW BOX CULVERT, AND WING WALLS AND FOUNDATIONS.
DPW24-144 CONSISTS OF FULL DEPTH ASPHALT REPAIR OF ROADWAY AND REVISING TRAFFIC PATTERN WEST OF BUTTS RD-WILDERNESS RD TRAFFIC CIRCLE TO ADDRESS TRAFFIC CONFLICTS ENTERING AND EXITING SHOPPETTE AND RANGE CONTROL. ALL WORK CONDUCTED ON FT CARSON, CO.
DPW23-023 REPAIR SPECKER AND PERSHING FIELD
CIV23-029 RPR, ENTRANCE TO TRIANGLE STORAGE YARD B8030
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
THE PURPOSE OF THIS REQUIREMENT IS TO CONSTRUCT A ROAD ON AN UNIMPROVED SECTION OF ROAD THAT BRANCHES OFF FROM THE ROADWAY TO THE GATE. THERE IS A CONTROLLED GATE AT THE EAST END OF BSFB THAT OPENS ONTO STATE ROUTE 30, AT THE INTERSECTION WITH SOUTH
DPW24-074 RPR, TITUS BLVD: CONTRACT MODIFICATION TO ADD IN-SCOPE WORK VIA THE REVISED STATEMENT OF WORK (SOW) DATED 1APR25 AND REVISED DRAWINGS. ADDED FUNDING AND CLINS 0004 THROUGH 0006.
BAA21-006 CNS, 2 DRIVE THRU GATES B9646 ADD CLIN 0003 FOR ADDITIONAL TRENCHING.
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
DPW24-006 RPR HARDSTAND B2082: MOD TO INCREASE QTY SCOPE OF CONCRETE/CLASS 5 BASE COURSE REQUIRED TO ADDRESS UNFORESEEN SITE CONDITIONS AFTER DEMO.
DPW24-007 RPR, PARKING B756
ADDITIONAL WORK- ALLOWANCE CURB AND GUTTER - DPW24-007 RPR, PARKING B756
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY MILL AND OVERLAY ROADWAYS BASE WIDE. SPECIFICALLY THE FOLLOWING ROADWAYS NEED THE FOLLOWING WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: EAST STEAMBOAT AVENUE E. STEAMBOAT AVENUE FROM ASPEN S
REPAIR SPECKER AND PERSHING FIELD - MODIFICATION TO ADD CLIN 0002 FOR INLET GRATE CHANGE.
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00003 XQPZ 160403 REP. PARKING AREA COM. CTR.
MILL AND OVERLAY OF ROADS ALONG WITH THE REPAIR OF STORM WATER WAYS AND EDGE OF ROAD RADIUS FOR WINTER PARK AVE FROM LVIP TO WINTER PARK PL TO VAIL ST. AND ASPEN ST SB TO STEAMBOAT AVE TO KEYSTONE AVE TO DEVILS THUMB TO BRECKENRIDGE TO ASPEN WAY.
BAA21-006 CNS, 2 DRIVE THRU GATES B9646 TO ALLOW ACCESS TO AIRFIELD VIA MAIN ROAD.
DPW24-074 REPAIR WORK
DEMOLISH LAKE WILLIAMS AND DAM TO BE COMPLETED IN THREE PHASES TO INCLUDE PRE-CONSTRUCTION PLANNING, DEMOLITION, AND RE-CONSTRUCTION OF NEW STORM WATER CHANNELS, SCULPTED CONCRETE DROP STRUCTURES, A NEW BOX CULVERT, AND WING WALLS AND FOUNDATIONS.
DPW24-007 RPR, PARKING B756
RPR HARDSTAND
PROJECT BAA21-009 CONSISTS OF REPAIR GRAVEL PARKING LOT TO RECONDITION AGGREGATE SURFACE, INSTALL NEW TIMBER WHEEL STOPS AND INSTALL TWO (2) NEW CONCRETE DRIVEWAYS.
REPAIR SPEACKER AND PERSHING FIELD
ARAPAHOE BASIN (A-BASIN) AVENUE, STARTING AT TELLURIDE STREET TO ASPEN STREET NEEDS A USABLE SIDEWALK IN ORDER FOR PEOPLE TO WALK FROM BASE HOUSING TO THE CHURCH AND TO ASPEN STREET. THE SLOPE OF THE DRIVE LANES TO THE CHURCH SHALL BE MODIFIED TO MEE
MILL AND OVERLAY OF ROADS ALONG WITH THE REPAIR OF STORM WATER WAYS AND EDGE OF ROAD RADIUS FOR WINTER PARK AVE FROM LVIP TO WINTER PARK PL TO VAIL ST. AND ASPEN ST SB TO STEAMBOAT AVE TO KEYSTONE AVE TO DEVILS THUMB TO BRECKENRIDGE TO ASPEN WAY.
DPW24-005 RPR, PARKING B1444 WOLF DFAC
MODIFICATION TO DE OBLIGATE ALL REMAINING FUNDS FROM TASK ORDER IN ORDER TO CLOSE TASK ORDER. $7,371.36 DE OBLIGATED FROM CLIN 0002.
RPR, EACH LOT G & H
MAINTAIN, SAND, SEAL, AND RESTRIPE PARKING LOTS BASEWIDE II.
CONSTRUCT ROADWAY AT PICADILLY GATE
MILL AND OVERLAY BASEWIDE II
USAFA PAVING PROJECTS
DPW19-106 RPR PRUSSMAN BLVD. AND SHERIDAN AVE.
REPAIR PARKING LOT MOTOR POOL REVISION B
REPAIR WORK
RESTRIPE MULTIPLE PARKING LOTS - BASEWIDE
CONSTRUCT FIRE TRUCK DRIVEWAY AT BUILDING 807
DPW23-007 RPR, B1666 PAVEMENT REPAIR
REPAIR PARKING LOT
CD - 88TH USARC PAVING PROJECT, AURORA, CO R00005 VENT/PIPE FILL
CD - 88TH USARC PAVING PROJECT, AURORA, CO R00004 SATURATED SOIL REMOVAL
CONTRACTION OF BUILDING 300 PARKING LOT ON SCHRIEVER SPACE FORCE BASE.
CONSTRUCT SIDEWALK ALONG ARAPAHOE BASIN AVENUE.
REPAIR OF AIRFIELD RAMP ROW H3 AT PETERSON SPACE FORCE BASE AIRFIELD.
RESTRIPE MULTIPLE PARKING LOTS ON BUCKLEY SPACE FORCE BASE
ADD AND ALTER SEWER MAIN AT BUILDING 606
MILL AND OVERLAY BASEWIDE FOR BUCKLEY SPACE FORCE BASE.
Business Details
- UEI
- UBT9TWZXJZ21
- CAGE Code
- 7ZTT5
- Address
- 2501 DALLAS ST STE 290
STE LWR
AURORA, CO 800101043 - Congressional District
- CO-01
- Phone
- 7202545729
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov