STG PACIFIC, LLC
ANCHORAGE, ALASKA 995035825
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 238990 | $21.40M | 27 |
| 237310 | $15.22M | 29 |
| 237990 | $2.83M | 3 |
| 236220 | $1.28M | 5 |
| 561210 | $470K | 4 |
Contract Awards
33 awards found
JBR040 CAMP DENALI MODERNIZATION-P00002
THIS PROJECT WILL FUND THE DEMOLITION AND REPLACEMENT OF THE PERDIDO KEY BOARDWALK AT JOHNSON'S BEACH. THE BOARDWALK WILL BE RECONSTRUCTED IN THE SAME FOOTPRINT, UTILIZING MATERIALS RESILIENT TO STORM SURGES AND MORE STORM FREQUENCY.
FTG268 FIRE STATION REPAIR-FORT GREELY, ALASKA
A00001 CI#1,3
MOD P00005-RFI-015 BRAVO FENCELINE ADDITIONAL CREEK CROSSINGS AND BRACES: 1. ADDITIONAL (4) SINGLE H-BRACES, 2. ADDITIONAL (5) DOUBLE H-BRACES; AND INCORPORATE EXECUTIVE ORDERS 14148 AND 14208.
ID DOT 21(1) SH-21, WILDLIFE OVERPASS AT CERVIDAE PEAK, MP - CLOSEOUT 19.3 ADMIN MOD
JBR054 CI#1,7,8 A00004
JBR040 CAMP DENALI MODERNIZATION BUILDING 49000
AK FWS KNA 74525(1), SWAN LAKE ROAD PROJECT - FYE OBLIGATION CM
AK FWS KNA 1192(1) SKILAK LAKE ROAD AOP IMPROVEMENTS - OBLIGATION CM
MOD P00003 FOR RFP 06 FOR HAVO 318735 HALE 318732, REHAB PERIMETER FENCE TO PROTECT ECOSYSTEM, CONSTRUCTION PROJECT
THIS PROJECT WILL FUND THE DEMOLITION AND REPLACEMENT OF THE PERDIDO KEY BOARDWALK AT JOHNSON'S BEACH. THE BOARDWALK WILL BE RECONSTRUCTED IN THE SAME FOOTPRINT, UTILIZING MATERIALS RESILIENT TO STORM SURGES AND MORE STORM FREQUENCY.
JBR054 CI#2 A00001
MOD P00002 FOR RFP 0003 FOR HAVO 318735 HALE 318732, REHAB PERIMETER FENCE TO PROTECT ECOSYSTEM, CONSTRUCTION PROJECT
MOD P00001 FOR RFP 0001 AND 0002 FOR HAVO 318735 HALE 318732, REHAB PERIMETER FENCE TO PROTECT ECOSYSTEM, CONSTRUCTION PROJECT
CONSTRUCTION SERVICES FOR PROJECT AK FWS KNA 1192(1), SKILAK LAKE ROAD AOP IMPROVEMENTS
FTW422 CONSTRUCT VEHICLE BRIDGE (MLC-70), MODIFICATION FOR CLAIM SETTLEMENT.
AK FWS KNA 74525(1), SWAN LAKE ROAD PROJECT
DEOBLIGATION OF EXCESS FY22 FUNDS
JBR054 CAMP DENALI MODERNIZATION, JBER, ALASKA
ID DOT 21(1) SH-21, WILDLIFE OVERPASS AT CERVIDAE PEAK, MP 19.3 - FYE OBLIGATION CM
REPAIR BUILDING FOUNDATION
HAVO 318735 HALE 318732, REHAB PERIMETER FENCE TO PROTECT ECOSYSTEM, CONSTRUCTION PROJECT
DELETE CLINS 4 & 5
DEOBLIGATION OF $90,000.00 FROM CLIN 0001
FTQW 19-1012 REPAIR BOILER STACKS
CONSTRUCT REPAIR OF ALDER AVENUE FROM
FTQW 19-1012 REPLACE BOILER STACKS
LIS010 REPAIR BUILDING FOUNDATION, CAPE LISBURNE AFS, ALASKA.
INCREMENTAL FUNDING, $900K
SERVICE ORDERS
THIS PROJECT INCLUDES, A PRECAST CONCRETE ARCH STRUCTURE, MSE WALLS CONNECTING TO THE CONCRETE ARCH STRUCTURE, 8-FOOT TALL STEEL POST FENCE WITH WIRE MESH, AND GATES INTERMITTENTLY POSITIONED ALONG THE FENCE ALIGNMENT.
DTA015 GA BRIDGE REPLACEMENT
Business Details
- UEI
- WDPNBBRVA7S6
- CAGE Code
- 7JMN7
- Address
- 3800 CENTERPOINT DR STE 433
ANCHORAGE, AK 995035825 - Congressional District
- AK-00
- Phone
- 9072777287
Parent Company
CALISTA CORP
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov