Contract Awards
48 awards found
WASHOUT ROAD REPAIR
FLATHEAD NF GAOA FNF 38-35.235 SF LOGAN CREEK CULVERT
MODIFICAITN 0002 TO THE GAOA TRAIL CONSTRUCTION AND BRIDGE CONTRUCTION ON THE ROSS CREEK TRAIL OF THE THREE RIVERS RANGER DISTRICT. SEE MOD 0002 CLIN 0003 FOR ADDITIONAL DETAILS.
DURING EXCAVATION OF THE SEPTIC TANK, THE LINES WERE DISCOVERED TO BE NEEDING REPLACED AS SOON AS POSSIBLE. DURING EXCAVATION, A TEMPORARY REPAIR WAS PLACED BETWEEN THE TANK AND THE LINES. DUE TO THE AMOUNT OF EXCAVATION NEEDED FOR THE LINES, ASPHALT
RUBY CREEK BRIDGES REPLACEMENT ON THE WISDOM RANGER DISTRICT OF THE BDNF THIS PROJECT REPLACES TWO STRUCTURALLY DEFICIENT AND LOAD POSTED BRIDGES. THE CROSSINGS ARE LOCATED NFSR 624 AT MILEPOST 4.4 AND MILEPOST 5.4, RESPECTIVELY. ALL TERMS, CONDITI
MILLER PEAK BAER
GAOA TRAIL CONSTRUCTION AND BRIDGE CONTRUCTION ON THE ROSS CREEK TRAIL OF THE THREE RIVERS RANGER DISTRICT. SEE MOD 0001 CLIN 0002
BIL PROJECT: STARK-CROMWELL CULVERT REPLACEMENTS. REPLACEMENT OF THREE DETERIORATING UNDERSIZED CULVERTS WITH STRUCTURES THAT ALLOW FOR AQUATIC ORGANISM PASSAGE (AOP). STRUCTURES INCLUDED: 2 BOTTOMLESS ARCH CULVERTS, 1 LARGE ROUND CORRUGATED METAL PI
BRUSH CREEK CURVE WIDENING
2024 MATOC TASK ORDER FOR CENTRAL ZONE ROAD MAINTENANCE
DURING EXCAVATION OF THE SEPTIC TANK, THE LINES WERE DISCOVERED TO BE NEEDING REPLACED AS SOON AS POSSIBLE. DURING EXCAVATION, A TEMPORARY REPAIR WAS PLACED BETWEEN THE TANK AND THE LINES. DUE TO THE AMOUNT OF EXCAVATION NEEDED FOR THE LINES, ASPHALT
2 NEW AOPS ON CLEMMER GULCH. REPLACEMENT OF TWO UNDER-SIZED CULVERTS ON TELEGRAPH ROAD 495 (MP 4.78 & 5.4) TO AOPS. ITEMS AWARDED DESCRIBED BELOW: M.P 4.78 - BASE M.P 4.78 - OPTION ITEM 1 M.P 4.78 - OPTION ITEM 2 M.P 5.35 - BASE PRICE
RED MEADOW & MOOSE CREEK CULVERT REPLACEMENTS
LOST CREEK AOP CULVERT REPLACEMENT 5.77 AND 5.99.
FURNISH AND APPLY DUST PALLIATIVE TO ROUTE OF HIAWATHA TRAVEL ROUTES
MARSHALL WOODS DECOMMISSIONING
GAOA TRAIL CONSTRUCTION AND BRIDGE CONTRUCTION ON THE ROSS CREEK TRAIL OF THE THREE RIVERS RANGER DISTRICT.
CONSTRUCTION OF AN AQUATIC ORGANISM PASSAGE (AOP) IN BEARTRAP CREEK, LOCATED IN LEWIS AND CLARK COUNTY, MONTANA, ON THE LINCOLN RANGER DISTRICT.
THE PURPOSE OF THIS MODIFICATION IS TO DIRECT: 1. CLEAN-UP OF RAVELING FAILED CUT SLOPES 13+50 32+00. 2. PLACEMENT OF RIPRAP AT A FILL FAILURE. 3. ROADWAY RECONDITIONING OF 1.7 MILES FROM COUNTY BRIDGE TO BEGINNING OF NEW PROJECT PRIOR TO PLACEMEN
THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCREASE CUBIC YARDS FOR SUBBASE PLACEMENT. 2. INCREASE GEOTEXTILE. 3. INCREASE RIPRAP.
THE PURPOSE OF THIS MODIFICATION IS TO: 1. ADD TWO CULVERTS TO THE BASE CONTRACT. 2. ADD THREE CULVERTS TO THE OPTION ITEM.
REMOVE TEMPORARY BRIDGE AND INSTALL WITH A NEW STEEL BRIDGE
THE PURPOSE OF THIS MODIFICATION IS TO: 1. DIRECT WORK FOR UNFORESEEN SITE CONDITIONS - ADDING SUBBASE TO STABILIZE THE SOIL FOR DRIVABILITY AND LONGEVITY OF THE SITE. 2. ADD FUNDS FOR THE SUBBASE WORK REQUIRED FOR THE PROJECT SITE.
GAOA - COMBINED PETTY CREEK ROAD IMPROVEMENTS. INITIAL AWARD IS MADE FOR THE BASE ITEM, GARDEN POINT ROAD, CLIN 0001.
THE PURPOSE OF THIS MODIFICATION IS TO: 1. DIRECT ADDITIONAL WORK DUE TO UNFORESEEN SITE CONDITIONS. 2. ADD FUNDS FOR ADDITIONAL WITHIN SCOPE WORK.
GAOA - COMBINED PETTY CREEK ROAD IMPROVEMENTS. INITIAL AWARD IS MADE FOR THE BASE ITEM, GARDEN POINT ROAD, CLIN 0001.
PETER READY CREEK AOP DESIGN, PRIORITY LANDSCAPE ON THE SALMON RIVER RANGER DISTRICT, NEZ PERCE-CLEARWATER NATIONAL FOREST
GREEK CREEK AOP INSTALLATION ON THE SALMON RIVER RANGER DISTRICT OF THE NEZ PERCE-CLEARWATER NATIONAL FOREST.
PEEWEE FALLS AND RIVERSIDE CANYON OVERLOOKS TASK ORDER MOD 04 IS TO EXTEND THE PERIOD OF PERFORMANCE TO JULY 13, 2023 AND TO ADD FUNDS FOR ADDITIONAL BORROW AND CULVERT BAND.
THE PROJECT IS LOCATED ON FOREST ROAD NO. 282 AT MILEPOST 10.00 AT THE CROSSING OFF THE NORTH FORK OF LITTLE JOE CREEK. IMPROVEMENTS CONSIST OF BUT ARE NOT LIMITED TO: REMOVAL AND SALVAGE OF THE EXISTING MULTI PLATE STEEL PLATE ARCH CULVERT AND CONCR
ROAD MAINTENANCE AND CONSTRUCTION
CONTRACTOR SHALL PROVIDE ROAD MAINTENANCE AND INSTALL A WILDLIFE ACCESS GATE FOR THE IPNF CENTRAL ZONE COEUR D' ALENE RIVER RANGER DISTRICT IAW THE SOW. COR HAS BEEN CHANGED FROM CHRIS ACKERMAN TO ASHLEY MCCARTHY CO IS DANIEL.SZAMBELAN@USDA
WORK INCLUDES RESHAPING THE ROADWAY, CLEAR & GRUB, LEVELING SOME VERTICAL CURVES, REPLACING CULVERTS AND CATTLEGUARDS, AND RESURFACING.
THIS PROJECT CONSISTS OF THE REPAIR OF TWO FILL FAILURES AND INSTALLATION OF TWO 18 INCH X 40 FOOT CULVERTS.
BIL LOWER THERIAULT AOP NFSR MP 0.2
OPTION 01 TO AGGREGATE SURFACE 1.7 MILES OF ROAD, CALCIUM CHLORIDE 1.7 MILES AND REPLACE TWO CULVERTS.
GROUSE CREEK ROAD RELOCATION ROAD NO. 280 AND RESURFACING OPTION ITEM ONE
UPPER PACK RIVER ROAD IMPROVEMENT
BIL - OREGON GULCH AOP NFSR 320 MP 20.2
WORK INCLUDES RESHAPING THE ROADWAY, CLEAR & GRUB, LEVELING SOME VERTICAL CURVES, REPLACING CULVERTS AND CATTLEGUARDS, AND RESURFACING.
NZ WILDLIFE SECURITY ENHANCEMENT TASK ORDER ON THE SANDPOINT RANGER DISTRICT
INSTALL DRY COTTONWOOD AOP
IIJA: ROMBO AND JOHNSON CULVERT REPLACEMENTS
CONTRACTOR SHALL PROVIDE ROAD MAINTENANCE AND INSTALL A WILDLIFE ACCESS GATE FOR THE IPNF CENTRAL ZONE COEUR D' ALENE RIVER RANGER DISTRICT IAW THE SOW. COR FOR THIS PURCHASE ORDER IS CHRIS.ACKERMAN@USDA.GOV CO IS DANIEL.SZAMBELAN@USDA.GOV
LITTLE JOE BRIDGE
ROAD MAINTENANCE GRADING - COEUR D'ALENE RIVER RANGER DISTRICT
MISSOULA FIRE EQUIPMENT INSPECTION LOOP CONSTRUCTION
MISSOULA FIRE EQUIPMENT INSPECTION LOOP CONSTRUCTION
Business Details
- UEI
- JY11MP8CNKD1
- CAGE Code
- 6S4J5
- Address
- 633 HUNT GULCH RD
KINGSTON, ID 838399703 - Congressional District
- ID-01
- Phone
- 2086617216
Parent Company
STONE RIDGE CONSTRUCTION, INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov