TUTOR PERINI CORPORATION
SYLMAR, CALIFORNIA 913421051
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $404.92M | 147 |
| 238290 | $1.12M | 10 |
Contract Awards
50 awards found
MODIFICATION IS ISSUED TO ADD LINE ITEM FOR CMR 011 PERFORMANCE OF WORK.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REA-03 FOR THE VALUE OF $2,100.96.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CMR-05 FOR THE VALUE OF $52,374.90.
MODIFICATION P00017: WORK PLAN FOR MANAGEMENT OF CONTAMINATED SOIL AS PER CMR 010 SCOPE OF WORK.
ACCEPTANCE OF PROPOSAL FOR CMR 27: REPLACE FAILED N74 AND N74A AND EXTEND THE PERIOD OF PERFORMANCE TO 27 JULY 26.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CMR 04 FOR THE VALUE OF $7,424.00.
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CMR 01, CMR 02, CMR 03, AND REA-01 FOR THE VALUE OF $42,780.00. COR IS ALSO UPDATED.
GOGA 311373 ALCATRAZ PRISON HOSPITAL WING REHAB AND SEISMIC STABILIZATION.
MODIFICATION P00016: DESCOPE AS PER CMR 009.
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00017 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00015 (25) CALENDAR DAY EXTENSION. WORK TO COMPLETE REPAIR CADET FIELDHOUSE
GOGA 311373 ALCATRAZ PRISON HOSPITAL WING SEISMIC AND STABILIZE.
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00016 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R10013, (120) CALENDAR DAY EXTENSION. WORK TO COMPLETE REPAIR CADET FIELDHOUSE
INCIDENT FSMS0235855 3.13.25 EMAIL: CREATE A MOD ON 70Z05022F43000008 TO ADD DISTRIBUTION# 22 FOR THE FUNDS AS A DIRECT OBLIGATION. NO PR WILL BE INVOLVED. ASSOCIATED PR HAS BEEN DECOMMITTED AT THE END OF FISCAL YEAR.
ACCEPTANCE OF CMR 28 PROPOSAL DATED 1.27.25 FOR BARNDOOR HARDWARE AND HYDROSEED APPLICATION.
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00012 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
DESIGN/BUILD SAN JUAN HURRICANE REBUILD RIO BAYAMON AT USCG BASE SAN JUAN, PR (PHASE-1 RE-PROCUREMENT)
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R10011, (56) CALENDAR DAY EXTENSION. WORK TO COMPLETE REPAIR CADET FIELDHOUSE
MODIFICATION P00015: ADD LINE ITEM IN ACCORDANCE WITH CMR 008, EXPLORATORY GEOLOGICAL BORINGS, REPORTS AND FINDINGS.
ADDS FINAL FUNDING TO CONTRACT
CMR 24, PLAYGROUND EQUIPMENT AND PLAYGROUND ROOF REPAIR.
PERFORM DESIGN-BID-BUILD CONSTRUCTION TASK ORDER AS SOLICITED UNDER TASKORDER ANNOUNCEMENT 70Z05024R43000004, USCG STATION SIUSLAW, FLORENCE, OR.
DE-OBLIGATE FUNDS FROM THE AWARD.
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00013 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
DBB CORRECT SHORELINE EROSION PROJECT AT USCG STATION SIUSLAW.
CMR 25, DESIGN
CMR 23, OLD TOM STILES ROAD
CMR 26 CMR 26 GARAGE SIDE DOOR CLOSURES AND GUTTER EXTENSIONS
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE AT NO COST DUE TO GOVERNMENT DELAYS. THE NEW POP END DATE IS 08/30/2024. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. PROJECT MANAGER (PM): CLAUDIA HILL, ABRAN TRUJILLO,
GOGA 311373 ALCATRAZ PRISON HOSPITAL WING SEISMIC AND STABILIZE POCS: CO, JOHN_FIFE@NPS.GOV, CS, GABRIEL_CASTELLANOS@NPS.GOV
MODIFICATION P0008 BILATERAL FOR REA 001 ANNUAL WAGE RATE ADJUSTMENT 2023 IN ACCORDANCE WITH EO 14026. ($15.00 TO $16.20)
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00011 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
MODIFICATION P00012: BILATERAL MODIFICATION IN ACCORDANCE WITH REA #001 AND EXECUTIVE ORDER 14026.
OBLIGATE MINIMUM GUARANTEE - TUTOR PERINI
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00010 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
THE PURPOSE OF THIS MODIFICATION IS TO DIRECT THE CONTRACTOR TO COMPLETE THE REQUIRED WORK FOR RFP NO. 14; THE CONTRACTOR SHALL COMPLETE ALL WORK NOTED IN RFP NO. 14 WHICH IS HEREBY INCORPORATED AND BECOMES A PART OF THIS ORDER. PROJECT MANAGE
PROVIDES REMAINING INCREMENTAL FUNDING AND ADDITIONAL WORK WITHIN SCOPE (REPAIRS).
ADDS WORK WITHIN SCOPE, INCLUDING ROOF REPAIR.
MODIFICATION P00011: BILATERAL MODIFICATION TO INCORPORATE CMR 005 IMPLEMENT A DATA RECOVERY PLAN AND ALLOWANCE FOR STOP WORK AND LOST PRODUCTION.
MODIFICATION P0007 IS ISSUED TO INCORPORATE CMR 004, IMPLEMENTATION OF DATA RECOVERY PLAN.
CMR 22, MERCURY CONTAMINATED SOIL EXCAVATION AND REMOVAL.
CAVE 219342 ELEVATOR 1&2 REPLACEMENT
CMR 21: AN ALTERNATE MEDIA CABINET WITH RELOCATION TO CLOSET SPACE FOR (4) ADA UNITS WITH ADDITIONAL LOCKSETS, AN ADDITIONAL FIRE EXTINGUISHER PER UNIT, AND (6) ADDITIONAL PARCEL LOCKERS FOR MAILBOX GROUPS.
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00008 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
CD-M CONSTRUCTION DIVISION - CONSTRUCTION CONTRACT MODIFICATION R00007 WORK TO COMPLETE REPAIR CADET FIELDHOUSE
MODIFICATION P00008: BILATERAL MODIFICATION TO DESIGN AND INSTALL A 6000 GALLON OILY WATER STORAGE TANK AND CONTAINMENT IN ACCORDANCE WITH CMR 002.
CAVE 219342 ELEVATOR 1&2 REPLACEMENT
CMR 20, TSUNAMI SIREN REPLACEMENT AND RELOCATE
MODIFICATION P00007: BILATERAL MODIFICATION FOR DESCOPE DESIGN & CONSTRUCTION OF SECOND POTABLE WATER TANK FOUNDATION AND EQUIPMENT.
Business Details
- UEI
- MT9AATHS7ZB5
- CAGE Code
- 1CKB7
- Address
- 15901 OLDEN ST
SYLMAR, CA 913421051 - Congressional District
- CA-29
- Phone
- 5086282019
Parent Company
TUTOR PERINI CORPORATION
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov