TREATMENT OF ADDITIONAL MGD OUTSIDE THE SCOPE OF THE PWS.
EMERGENCY REPAIRS TO HOLLISTER AND GOAT CANYON. CAPITAL PROJECT WITHIN SCOPE OF THE CURRENT CONTRACT.
ADDITIONAL WORK OUTSIDE THE SCOPE BUT CRITICAL TO THE REHABILITATION OF BELT FILTER PRESS.
ADDED TWO-MONTH INCREMENTAL FUNDING.
ADDED TWO-MONTH INCREMENTAL FUNDING.
ADDED ONE MOTH INCREMENTAL FUNDING.
ADD ADDITIONAL COST THAT WERE NOT INCLUDED IN MODIFICATION P00057 FOR CLIN 0049 WORKED PERFORMED TO PROVIDE ASSESSMENT OF THE PIPE TO DETERMINE EXTENT OF THE REPAIRS NEEDED.
GATES 3 AND 4 ELECTRICAL UPGRADESJB-1 REHABILITATION CHANGE ORDER-2
ADD ONE MONTH OF INCREMENTAL FUNDING
FUNDING ONLY
SILVA JB 2 LINE O M EMERGENCY REPLACEMENT.
CLIN 039 FOR THE EMERGENCY REPLACEMENT OF 4 INFLUENT PUMPS AND MOTORS POP IS HEREBY EXTENDED TO AUGUST 30, 2025.
SETTLED CLAIM FOR LAB SERVICES AND HAULING
FUNDING OPTION YEAR FOUR THROUGH CR
SETTLED CLAIM FOR RECLEANING PSTS 2&4
FUNDING OPTION YEAR FOUR THROUGH CR
FUNDING OPTION YEAR FOUR THROUGH CR
ADDITIONAL WORK CLIN 021 INFLUENT METER PLUG VALVES, FLOWMETER AND PIPE REPLACEMENT PROJECT.
URGENT THAT THE REPLACEMENT CONSTRUCTION OF JB1 BE STARTED AND COMPLETED AS QUICKLY AS POSSIBLE SO CONTROL OF FLOWS INTO TH
ADDITIONAL WORK CLIN 021 INFLUENT METER PLUG VALVES, FLOWMETER AND PIPE REPLACEMENT PROJECT.
FUNDING ACTION
IF EMERGENCY REPAIRS ARE NOT BEGUN SBIWTP WILL RISK SIGNIFICANT SEWAGE RELEASED INTO THE TIJUANA RIVER AND PACIFIC OCEAN AND A SERIOUS HEALTH RISK TO PEOPLE IN THE AREA.
FUNDING ACTION, ADDITIONAL WORK WITHIN THE SCOPE
FUNDING ACTION, EXERCISED LAST OPTION YEAR
FUNDING ACTION ONLY, CORRECTED TOTAL AMOUNT OF AWARD
REPAIR OF THE BELT FILTER PRESSES
IF EMERGENCY REPAIRS ARE NOT BEGUN SBIWTP WILL RISK SIGNIFICANT SEWAGE RELEASED INTO THE TIJUANA RIVER AND PACIFIC OCEAN AND A SERIOUS HEALTH RISK TO PEOPLE IN THE AREA.
FUNDING MODIFICATION. O&M OF THE SOUTHBAY WASTEWATER TREATMENT PLANT.
REPLACE FOUR INFLUENT PUMPS.
ADDITIONAL CLEANING OF GRIT CHAMBER DUE TO STORM
ADDITIONAL CLEANING OF GRIT CHAMBER DUE TO STORM
FUNDING OPTION YEAR FOUR THROUGH CR
ACCELERATING DAMAGE DUE TO TROPICAL STORM. FAILURE TO REPAIR IMMEDIATELY WILL RISK SIGNIFICANT SEWAGE RELEASED INTO THE TIJUANA RIVER AND PACIFIC OCEAN RESULTING IN A SERIOUS HEALTH RISK TO PEOPLE IN THE AREA.
THE PURPOSE OF THIS MODIFICATION TO INCREMENTALLY FUND OPTION YEAR THREE (3) FOR ONE MONTH DUE TO THE CR.
THE PURPOSE OF THIS MODIFICATION TO INCREMENTALLY FUND OPTION YEAR THREE (3) FOR ONE MONTH DUE TO THE CR.
THE PURPOSE OF THIS MODIFICATION TO INCREMENTALLY FUND OPTION YEAR THREE (3) FOR ONE MONTH DUE TO THE CR.
ACCELERATING DAMAGE DUE TO TROPICAL STORM. FAILURE TO REPAIR IMMEDIATELY WILL RISK SIGNIFICANT SEWAGE RELEASED INTO THE TIJUANA RIVER AND PACIFIC OCEAN RESULTING IN A SERIOUS HEALTH RISK TO PEOPLE IN THE AREA.
IF EMERGENCY REPAIRS ARE NOT BEGUN SBIWTP WILL RISK SIGNIFICANT SEWAGE RELEASED INTO THE TIJUANA RIVER AND PACIFIC OCEAN AND A SERIOUS HEALTH RISK TO PEOPLE IN THE AREA.
MODIFICATION TO EXERCISE OPTION YEAR THREE (3) AND FULLY FUND OPTION YEAR FOUR (4).
MODIFICATION TO INCORPORATE REHABILITATION OF EQUIPMENT PSTS 1-5
RATIFICATION OF UNAUTHORIZED COMMITMENT FOR THE LIFTING OF JP1 GATE AT THE SOUTHBAY WASTEWATER TREATMENT PLANT.
RATIFICATION OF UNAUTHORIZED COMMITMENT FOR THE CLEANING OF THE GRIT CHAMBER AT THE SOUTHBAY WASTEWATER TREATMENT PLANT.
RATIFICATION OF UNAUTHORIZED COMMITMENT FOR SAND REMOVAL FROM THE PRIMARY SEDIMENT TANKS AT THE SOUTHBAY INTERNATION WASTEWATER TREATMENT PLANT.
MODIFICATION TO INCORPORATE REHABILITATION OF EQUIPMENT PSTS 1-5
URGENT THAT THE REPLACEMENT CONSTRUCTION OF JB1 BE STARTED AND COMPLETED AS QUICKLY AS POSSIBLE SO CONTROL OF FLOWS INTO TH
RATIFICATION OF UNAUTHORIZED COMMITMENT FOR EMERGENCY REPAIRS OF BAR SCREENS AT THE SOUTH BAY WASTEWATER TREATMENT PLANT.
ADDITIONAL MAINTENANCE DUE TO EXCESS FLOWS
NO COST MODIFICATION TO EXTEND THE POP ON CLIN 0021 AND 0023
SERVICES TO REPLACE PUMPS AT THE SOUTHBAY INTERNATIONAL WASTEWATER TREATMENT PLANT
THE PURPOSE OF MODIFICATION P00028 FUNDING FOR ONE (1) MONTH.
Business Details
- UEI
- VQTPF9KTZAY8
- CAGE Code
- 61E43
- Address
- 53 STATE ST 14TH FL
BOSTON, MA 021093205 - Congressional District
- MA-08
- Phone
- 8139832815
Parent Company
VEOLIA ENVIRONNEMENT
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov