VISIONARY CONSTRUCTION INC
ATLANTA, GEORGIA 303392066
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $6.25M | 69 |
| 237310 | $2.08M | 25 |
| 238990 | $1.72M | 19 |
| 561720 | $1.44M | 14 |
| 236210 | $1.18M | 2 |
| 238330 | $713K | 1 |
| 238390 | $305K | 4 |
| 561730 | $292K | 9 |
| 237990 | $-2,603,102.69 | 10 |
Contract Awards
50 awards found
MODIFICATION 0007 IS TO DE-OBLIGATE ALL REMAINING FUNDS.
EXTENSON TO 8/1/2025
GAOA CONT FY22 TIE HACK TRAILS MAD CREEK BRIDGE CONT GAOA FY23 TIE HACK TRAILS MAD CREEK BRIDGE
MESS ATTENDANT SERVICES
IL177 (IL005, IL045) GROUNDS 4-1-2025 - 3/31/2026 FY25. IAW THE PERFORMANCE WORK STATEMENT AND TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT.
PERIMETER FENCE REPAIR
MOD-P00001 FOR R4-LA-BIG BRANCH MARSH NWR- BBM05-HURRICANE SHUTTERS IS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE BY (24) CALENDAR DAYS TO FRIDAY, AUGUST 29, 2025, AND INCREASE THE TOTAL CONTRACT VALUE FOR ADDITIONAL WORK BY $6,750.00 TO A NEW TOTAL
DSCR W4 FENCE DISINTEGRATOR
CONTRACTOR SHALL FURNISH ALL LABOR, TRANSPORTATION, SUPERVISION, MATERIAL, EQUIPMENT, AND PERFORMING ALL OPERATIONS FOR REPLACEMENT OF ALL SEALANT, CAULKING, AND BACKER ROD FROM PRE-CAST CONCRETE STRUCTURE B7401 ONBOARD GREAT LAKES NAVAL STATION IL.
IL177 (IL005, IL045) GROUNDS 4-1-2025 - 3/31/2026 FY25. IAW THE PERFORMANCE WORK STATEMENT AND TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT.
PERIMETER FENCE MAINTENANCE
MANUFACTURING SHOP FLOOR 200D DTA (OY4)
CONTRACT FOR PROVIDING AND INSTALLING HURRICANE SHUTTERS AT BIG BRANCH MARSH NWR ADMINISTRATION BUILDING IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK.
GAOA CONT FY22 TIE HACK TRAILS MAD CREEK BRIDGE CONT GAOA FY23 TIE HACK TRAILS MAD CREEK BRIDGE
THIS WORK SHALL CONSIST OF: CONSTRUCTION SURVEYING AND STAKING, EROSION CONTROL MEASURES, SILT FENCING AND DEWATERING STRUCTURES INSTALLATION AND REMOVAL AFTER FINAL ACCEPTANCE, CLEARING AND GRUBBING, THE REMOVAL AND RESETTING OF HISTORIC ROCKS/STONE
GENERAL REPAIR BUILDING 224
THE WORK INCLUDES MINOR DEMOLITION AND NEW CONSTRUCTION FOR AN ADDITION TO THE 8 SOS BUILDING 90145. THE ADDITION IS A ONE STORY, SLAB ON GRADE WITH SCORED, SPLIT FACES LOW AND END WALLS MATCHING THE EXISTING BUILDINGON A PRE-ENGINEERED METAL BUILDI
CHANGE FENCE ROUTING ON PRIORITY 3 & 4
THIS WORK SHALL CONSIST OF: CONSTRUCTION SURVEYING AND STAKING, EROSION CONTROL MEASURES, SILT FENCING AND DEWATERING STRUCTURES INSTALLATION AND REMOVAL AFTER FINAL ACCEPTANCE, CLEARING AND GRUBBING, THE REMOVAL AND RESETTING OF HISTORIC ROCKS/STONE
THE PURPOSE OF THIS MODIFICATION IS TO DE-OB THE REMAINING FUNDS FOR CLOSEOUT.
DISHWASHER & JANITORIAL SERVICES
CONTRACT FOR DMA EXTERIOR LIGHTING REPAIR AT MARCH ARB, CA. REFERENCE NO. R00001 SM002 CREDIT FOR WORK NOT PERFORMED. TOTAL CONTRACT PRICE IS DECREASED BY $20,142.38. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
PERIMETER FENCE REPAIR
CASE BH002 MODIFICATION A00001 "VISITOR LOBBY AND CORRIDOR CORRECTION"
2017 PR FS HURRICANE IRMA (TRAILS) REPAIR PROJECT
2017 PR FS HURRICANE IRMA (TRAILS) REPAIR PROJECT
BASE PERMITER FENCE MAINTENANCE
MANUFACTURING SHOP FLOOR 200D DTA (OY3)
2017 PR FS HURRICANE IRMA (TRAILS) REPAIR PROJECT
GAOA REPLACE GIBB WASH BRIDGE
DE-OBLIGATION OF GUARANTEED MINIMUM. SOUTH CAROLINA CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
THE PURPOSE OF THIS MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE BY 62 DAYS, FROM 11/30/2023 TO 1/31/2024 AND PAY TO REPLACE DATA CABLES.
CONTRACT FOR NSWC-C-B575 MINOR RENOVATIONS AT NORCO, CA. REFERENCE NO. R00003 WN004 NEW ELECTRICAL PANEL. TOTAL CONTRACT PRICE IS INCREASED BY $34,881.94. CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 79 CALENDAR DAYS BY REASON OF THIS MODIFICATION.
EXTERIROR LIGHTING AT MARCH AFB
REPLACEMENT OF TWO 5TH FLOOR COMPUTER ROOM LIEBERT UNITS LOCATED AT THE TUTTLE US COURT OF APPEALS BLDG. 56 FORSYTH ST. ATLANTA, GA 30303-2218.
BARKLEY POWER PLANT CEILING REPLACEMENT
THIS WORK SHALL CONSIST OF: CONSTRUCTION SURVEYING AND STAKING, EROSION CONTROL MEASURES, SILT FENCING AND DEWATERING STRUCTURES INSTALLATION AND REMOVAL AFTER FINAL ACCEPTANCE, CLEARING AND GRUBBING, THE REMOVAL AND RESETTING OF HISTORIC ROCKS/STONE
ADD/ALTR 8 SOS BLDG.
FENCING FOR WH15 AT DSCR
PURPOSE: MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE BY 30 DAYS, FROM 9/30/2023 TO 10/30/2023. AND: 1. TO INCLUDE THE LABOR NECESSARY FOR THE INSTALLATION OF ELECTRICAL OUTLETS IAW THE RELATED SOW AND AS LISTED ON THE SCHEDULE OF ITEMS.
2017 PR FS HURRICANE IRMA (TRAILS) REPAIR PROJECT
DISHWASHER & JANITORIAL SERVICES
THE PURPOSE OF THIS MOD IS TO EXERCISE OPTION IV WITH A POP OF 9/1/2023 TO 8/31/2024.
THIS WORK SHALL CONSIST OF: CONSTRUCTION SURVEYING AND STAKING, EROSION CONTROL MEASURES, SILT FENCING AND DEWATERING STRUCTURES INSTALLATION AND REMOVAL AFTER FINAL ACCEPTANCE, CLEARING AND GRUBBING, THE REMOVAL AND RESETTING OF HISTORIC ROCKS/STONE
DEOBLIGATION OF EXCESS FUNDS
BUILDING 760-15G EXTERIOR PAINTING, FACILITY REPAIR & MAINTENANCE PROJECT
CONTRACT FOR NSWC-C-544,505,512,213 HVAC/SPRINKLER AT NORCO, CA. REFERENCE NO. R00002 WN001 B512 CHANGE TO FAN COIL. TOTAL CONTRACT PRICE IS INCREASED BY $22,728.47. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 90 CALENDAR DAYS.
AWARD FOR CONSTRUCT SEWAGE LIFT STATION AT 436 PINETREE BOULEVARD THOMASVILLE GA 31792
BOVEE FIRE FENCE REMOVAL & RECONSTRUCTION
8508279327!MATERIALS
Business Details
- UEI
- L76ZSHNB61Z3
- CAGE Code
- 5YVS3
- Address
- 3350 RIVERWOOD PARKWAY, SUITE 1900
ATLANTA, GA 303392066 - Congressional District
- GA-06
- Phone
- 4048060593
Parent Company
VISIONARY CONSTRUCTION INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov