WSM PACIFIC SIOP, A JOINT VENTURE
HONOLULU, HAWAII 968133695
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $276.63M | 72 |
Contract Awards
43 awards found
P454 - PHASE 4.2: CREATION OF MULTIPLE CONSTRUCTION CONTRACTS DESIGN PACKAGES, IN NAVAL BASE KITSAP, BREMERTON
DRY DOCK 5 (DD5) SEISMIC VULNERABILITY ASSESSMENT YOKOSUKA SRF, JAPAN
MODIFICATION FOR PNSY DRY DOCK 2 / BUILDING 343 TECHNICAL CLARIFICATIONS AND CORRECTIONS
REQUEST FOR EQUITABLE ADJUSTMENT
THE PURPOSE OF THIS MOD P00003 IS TO INCORPORATE ADDITIONAL COSTS TO PROPERLY DISPOSE HAZARDOUS DRILL SPOIL MATERIAL GATHERED DURING THE A-E CONTRACTOR SEISMIC VULNERABILITY ASSESSMENT OF DRY DOCK 6 AT THE SHIP REPAIR FACILITY IN YOKOSUKA, JAPAN.
P1360 HOST NATION ENGINEERING AND DESIGN SERVICES
N6274225F0321-P00001, FY27 MILCON PROJECT P-852, CONTROLLED INDUSTRIAL FACILTY, POLARIS POINT, NAVAL BASE GUAM.
FORGE AND HEAT TREAT FACILITY
PROVIDE ALL EFFORTS AS REQUIRED TO INCORPORATE COST REDUCTION OPPORTUNITIES INTO THE P454 M2D2 DESIGN PACKAGE.
P454 MULTI-MISSION DRYDOCK (50% DESIGN, PHASE 4.5 80% OTS MEETING
P454 MULTI-MISSION DRYDOCK, PHASE 3.5.1 MCCA
FY27 MILCON PROJECT P-852, SUBMARINE IMF RADIOLOGICAL MAINTENANCE FACILITY, POLARIS POINT, NAVAL BASE GUAM.
P454 MULTI-MISSION DRYDOCK- 80% TO FINAL DESIGN.
FY25 DE25-3923 DEMOLISH B58
PHASE 3.5 MULTIPLE CONSTRUCTION CONTRACT ASSESSMENT
P454 MULTI-MISSION DRYDOCK - 80% AND OPTION FOR FINAL DESIGN
PORTSMOUTH NAVAL SHIPYARD DRY DOCK 3 SEISMIC ASSESSMENT
NORFOLK NAVAL SHIPYARD DRY DOCK 8 SEISMIC ASSESSMENT
NORFOLK NAVAL SHIPYARD DRY DOCK 1 SEISMIC ASSESSMENT
PORTSMOUTH NAVAL SHIPYARD DRY DOCK 1 SEISMIC ASSESSMENT
SIOP - DESIGN FOR FORGE AND HEAT TREAT SHOP
R M 14-0537 DRY DOCK 1 (DD1) FLOOD PROTECTION AND CRANE RAIL REPAIR
P1284-MULTI-AVAIL WATERFRONT PRODUCTION SUPPORT FACILITY AT DRY DOCKS #2,3 & 4
PORTSMOUTH NAVAL SHIPYARD DRY DOCK 2 BUILDING 343 SEISMIC ASSESSMENT
EXERCISE OPTION FOR POST CONSTRUCTION AWARD SERVICES (PCAS).
FY24 SEISMIC STUDY FOR YOKOSUKA SRF DRY DOCK 6, YOKOSUKA, JAPAN
P-859 CVN 78 AIRCRAFT CARRIER ELECTRICAL UPGRADES_ACCELERATED DESIGN SCHEDULE
P454 MULTI-MISSION DRYDOCK PHASE 3.4 COST SAVINGS REDUCTION
CHANGES TO FINAL DESIGN.
P454 MULTI-MISSION DRY DOCK PHASE 3.1
DRY DOCK #6 RECAPITALIZATION ADVANCED PLANNING STUDY
SURVEY AND UTILITY INVESTIGATIONS AT PUGET SOUND NAVAL SHIPYARD,
FDA 15% - 100% DESIGN - CHAP 2
P454 MULTI-MISSION DRYDOCK (50% DESIGN)- REQUEST FOR EQUITABLE ADJUSTMENT - ESTABLISHMENT OF A CENTRAL ACCUMULATION AREA (CAA) AT PUGET SOUND NAVAL SHIPYARD, BREMERTON, WA
P454 MULTI-MISSION DRYDOCK, AE SERVICES, PSNS, BREMERTON, WA
P454 MULTI-MISSION DRYDOCK (35% DESIGN)
PDA 0% - 15% DESIGN - CHAP 1
P454 MULTI-MISSION DRYDOCK (35% DESIGN)
 P-891 SHIPYARD ELECTRICAL BACKBONE - ENGINEERING SERVICES FOR ALTERNATE SITE LOCATION. 
P454 MULTI-MISSION DRYDOCK (35% DESIGN) ADDITIONAL SURVEYS, TEST PILE PROGRAM STUDY, DREDGE MATERIAL CHARACTERIZATION
P454 MULTI-MISSION DRYDOCK DESIGN (VADM BRIEF - WASH DC)
P454 MULTI-MISSION DRYDOCK (35% DESIGN)
P-891 SHIPYARD ELECTRICAL BACKBONE - ENGINEERING SERVICES FROM PDA TO 100% FULL DESIGN.
Business Details
- UEI
- LTRAAFDB1H51
- CAGE Code
- 8MB99
- Address
- 1001 BISHOP ST STE 2400
HONOLULU, HI 968133695 - Congressional District
- HI-01
- Phone
- 2012478921
Parent Company
WSM PACIFIC SIOP, A JOINT VENTURE
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov